---
title: "Dual-Color Molding for Handle Shells - JATERSON"
description: "Our dual-color molding service for handle shells is ideal for power tool molds, electronic device peripheral molds, and injection molds. These high-performance dual-color molds are designed for mass production, offering a lifespan of 700,000 cycles. With quenching-processed mold cores, we ensure durability and precision within a 30-day processing time."
url: "https://www.jaterson.com/shell-of-electric-tools-injection-molding/dual-color-molding-for-handle-shells.html"
language: "en"
type: "Product"
category: "Shell of electric tools"
datePublished: "2024-07-24"
dateModified: "2025-02-26"
brand: "JATERSON"
manufacturer: "JATERSON"
image: "https://static.jaterson.com/2024/07/25083031/1740472231-1721809131-Dual-Color-Molding-for-Handle-Shells.webp"
---

# Dual-Color Molding for Handle Shells

**Dual-Color Injection Mold:**

- **Mold Performance: **700,000 cycles
- **Mold Type: **Dual-color mold
- **Mold Purpose:** Mass production mold
- **Mold Core Processing: **Quenching
- **Processing Time: **30 days

![Dual-Color Molding for Handle Shells](https://static.jaterson.com/2024/07/25083031/1740472231-1721809131-Dual-Color-Molding-for-Handle-Shells.webp)

**Applications: **Primarily used for power tool molds, peripheral molds for electronic devices, and injection molds.

## Related Resources

- [Shell of electric tools](https://www.jaterson.com/shell-of-electric-tools-injection-molding/)

## Structured Data

```json
[
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
        {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Products", "item": "https://www.jaterson.com/products/"},{"@type": "ListItem", "position": 3, "name": "Shell of electric tools", "item": "https://www.jaterson.com/shell-of-electric-tools-injection-molding/"}
        ,{"@type": "ListItem", "position": 4, "name": "Dual-Color Molding for Handle Shells - JATERSON"}
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "Product",
  	
  	"url": "https://www.jaterson.com/shell-of-electric-tools-injection-molding/dual-color-molding-for-handle-shells.html",
      "name": "Dual-Color Molding for Handle Shells - JATERSON",
      "category": "Shell of electric tools",
      "image": [
  		        "https://static.jaterson.com/2024/07/25083031/1740472231-1721809131-Dual-Color-Molding-for-Handle-Shells.webp"
  		],"description": "Our dual-color molding service for handle shells is ideal for power tool molds, electronic device peripheral molds, and injection molds. These high-performance dual-color molds are designed for mass production, offering a lifespan of 700,000 cycles. With quenching-processed mold cores, we ensure durability and precision within a 30-day processing time.",
      "brand": {
          "@type": "Brand",
          "name": "JATERSON"
      },
      "manufacturer":{ "@id":"https://www.jaterson.com/#organization" },
      
  }
]
```