---
title: "Dual-Color Injection Molding for Plastic Handle Shells - JATERSON"
description: "Dual-color injection molded plastic handle shells, with product weights from 36 grams to 240 grams, are primarily used for hardware tools and products requiring waterproof structures, offering superior appearance and functionality."
url: "https://www.jaterson.com/shell-of-electric-tools-injection-molding/dual-color-injection-molding-for-plastic-handle-shells.html"
language: "en"
type: "Product"
category: "Shell of electric tools"
datePublished: "2024-07-18"
dateModified: "2025-02-24"
brand: "JATERSON"
manufacturer: "JATERSON"
image: "https://static.jaterson.com/2024/07/24025753/1740365872-1721291318-Dual-Color-Injection-Molding-for-Plastic-Handles.webp"
---

# Dual-Color Injection Molding for Plastic Handle Shells

Our dual-color injection molding for plastic handle shells supports product weights ranging from 36 grams to 240 grams. We operate 4 dual-color injection molding machines with capacities of 260 tons, 360 tons, and 550 tons. Additionally, we have 35 single and dual-color, vertical and horizontal injection molding machines ranging from 35 tons to 550 tons, ensuring comprehensive injection molding capabilities.

![Dual-Color Injection Molding for Plastic Handle Shells](https://static.jaterson.com/2024/07/24025753/1740365872-1721291318-Dual-Color-Injection-Molding-for-Plastic-Handles.webp)

| **Product Name** | Dual-Color Handle Mold |
| --- | --- |
| **Process Type** | [Injection Molding](https://www.jaterson.com/knowledge/injection-molding-all/) Mold |
| **Mold Installation** | Fixed |

**Customer Requirements**: Dual-color injection, no black spots, discoloration, or flash.

**Production Philosophy**: Striving for perfection with a strict manufacturing process to ensure the product is pressed neatly and smoothly, with no burrs and clear, orderly patterns.

**Material**: Carefully selected materials, using genuine quality to ensure the product is more reliable.

**Durability**: The product is durable and has a long service life.

## Related Resources

- [Shell of electric tools](https://www.jaterson.com/shell-of-electric-tools-injection-molding/)

## Structured Data

```json
[
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
        {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Products", "item": "https://www.jaterson.com/products/"},{"@type": "ListItem", "position": 3, "name": "Shell of electric tools", "item": "https://www.jaterson.com/shell-of-electric-tools-injection-molding/"}
        ,{"@type": "ListItem", "position": 4, "name": "Dual-Color Injection Molding for Plastic Handle Shells - JATERSON"}
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "Product",
  	
  	"url": "https://www.jaterson.com/shell-of-electric-tools-injection-molding/dual-color-injection-molding-for-plastic-handle-shells.html",
      "name": "Dual-Color Injection Molding for Plastic Handle Shells - JATERSON",
      "category": "Shell of electric tools",
      "image": [
  		        "https://static.jaterson.com/2024/07/24025753/1740365872-1721291318-Dual-Color-Injection-Molding-for-Plastic-Handles.webp"
  		],"description": "Dual-color injection molded plastic handle shells, with product weights from 36 grams to 240 grams, are primarily used for hardware tools and products requiring waterproof structures, offering superior appearance and functionality.",
      "brand": {
          "@type": "Brand",
          "name": "JATERSON"
      },
      "manufacturer":{ "@id":"https://www.jaterson.com/#organization" },
      
  }
]
```