title: "How to verify reliability of factories producing agricultural machinery hand tool parts?"
description: "You are sourcing hand tool components for 2026 new agricultural equipment lines, facing 30%+ quote gaps, unproven part durability, and hidden delivery risks, get actionable criteria to validate factory reliability, reduce project failure risk, and balance cost with long-term field performance."
url: "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html"
language: "en"
type: "Q&A"
category: "General Manufacturing Q&A"
datePublished: "2026-10-27"
dateModified: "2026-10-27"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# How to verify reliability of factories producing agricultural machinery hand tool parts?

## Question

 I am a supply chain manager in charge of mold procurement, and right now I am sourcing custom injection molded hand tool grips and stamped release lever components for our 2026 new small farm equipment series, covering 12 total SKUs with an annual production forecast of 180,000 units. I have shortlisted 4 potential suppliers already, but their total quotes for combined tooling and 1 year bulk parts vary by 32% between the highest and lowest submissions. Some suppliers state they have over 10 years of specialized agricultural part manufacturing experience, while others are general injection and hardware shops that claim they can match all technical requirements. I am concerned that the lowest bidders may cut corners on mold steel hardness or use lower grade raw materials that cannot withstand -10°C to 50°C outdoor exposure, leading to field failures. We already suffered a 6 month delayed pilot project in 2025 where a general component shop delivered parts that cracked after only 30 hours of field use, and I want to avoid repeating that loss. I am not sure how to separate factories with real agricultural hand tool part expertise from average general shops using standard audit checklists alone. 

## Answers
                            
### Answer 1 — Best Answer

A reliable factory for this type of agricultural hand tool parts project should first pass three non-negotiable baseline checks before you dive into detailed quote comparison. First, ask every shortlisted supplier to provide 3 distinct, verifiable production batches of similar agricultural hand tool parts manufactured between 2024 and 2026, with corresponding third-party outdoor exposure test reports and customer delivery sign-off records; generic parts used for consumer lawn and garden equipment do not qualify as valid experience. This immediately filters out shops that claim agricultural experience but only produce general industrial components that never see harsh field conditions. Second, request each supplier to share their standard incoming material log for the specific resin and steel grade they quoted for your parts, and confirm they maintain a minimum 4 week stock of those exact grades to avoid unannounced switches to lower cost unvetted material when market prices shift.

For the 32% quote gap you are seeing, break down the line items to map cost and lead time tradeoffs directly: the lowest two quotes you have almost certainly use P20 mold steel without full HRC 48-52 hardening, which cuts initial mold cost by 28% but will only hold 80,000 to 100,000 injection shots before flash and dimension deviation appear, far below your 3 year production demand. The mid-range quotes that are 12-18% higher than the lowest will mostly use pre-hardened 718H steel with proper venting design, which can run 350,000+ shots without major maintenance. **Do not accept any lead time promise for first article samples shorter than 21 calendar days for combined mold making and stamping die trial**, any shop that delivers in 14 days is skipping at least 2 rounds of DFM review that would catch undercut or uneven wall thickness issues that cause part breakage in cold weather. The highest quotes usually add redundant inspection steps and 10% overcapacity buffer for peak demand, which is only necessary if your annual forecast will exceed 300,000 units.

Move to final supplier validation steps that eliminate the risk of repeating your 2025 failed pilot. Schedule a 2 hour unannounced virtual audit for each shortlisted factory, and ask the on-site engineer to show you their running production line for similar agricultural parts, point to the IPQC station that records torque test, drop test, and low temperature impact test data for every 2 hour production batch. **Require all suppliers to lock the mold and raw material specification in the formal contract with no unapproved substitution allowed without 15 day written pre-notice and your third party material verification**. You can also ask each factory to produce 20 free pre-production sample parts with the exact quoted material, run your own -10°C 24 hour cold storage test followed by 1.5m drop test, any sample that cracks or deforms eliminates that supplier immediately. **Allocate 3% of your total initial project budget to a 1000 unit small trial production run before full mass production ramp up**, this lets you catch any hidden process deviation before you commit to 6 months of bulk orders, which will cost you 10x more to fix than the small trial investment.

**status:** accepted
**Author:** David Zhang
**Date:** 2026-10-27

### Answer 2

Break your full project into 7 clear, sequential milestones, each requiring formal written sign off from both sides before work on the next phase can start, with no verbal approvals recognized as valid. The milestones are DFM document submission, raw material certification confirmation, first article trial completion, full dimensional test report submission, 500 unit trial run sign off, process control document finalization, and full mass production transfer.

Any design or process change requested by either party must come with a full impact statement for cost, lead time, and part durability, no change can be implemented until both teams confirm all downstream assembly and field performance requirements are still met. The full production transfer stage should also include a 7 day overlapping period where the factory runs 10% of your total daily output for 3 consecutive days, to confirm their line can hit the required yield rate consistently before you phase out any temporary backup supplier arrangements.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-10-27

### Answer 3

Define three clear defect classification standards for all agricultural hand tool parts before production starts, to eliminate unspoken quality gaps between you and the supplier. Critical defects refer to any flaw that makes the part break or lose function during normal operating conditions, which leads to full lot rejection. Major defects refer to issues that reduce part wear resistance by 30% or more, which require 100% sorting of the full batch. Minor defects are only cosmetic flaws that do not impact any functional performance.

For incoming IQC checks, every incoming resin batch needs to get a melt flow index test and tensile strength test on site, no untested material can be released to production. IPQC checkpoints are set every 2 hours for dimensional verification, impact test, and surface finish check. All non-conforming parts must be marked with red paint and stored in a locked segregated area, no reworked parts can be shipped to you without full re-testing and explicit written approval.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-10-27

### Answer 4

Check what percentage of their production line for this type of part uses semi-automated feeding and trimming equipment, rather than full manual operation. For plastic hand tool grip parts, a semi-automated line can keep cycle time variation within ±0.3 seconds across 1000 consecutive shots, which eliminates inconsistent part density and hidden internal stress that causes parts to crack in cold outdoor temperatures.

Fully manual lines often have up to 2 second cycle time variation, leading to 8-12% of parts having unqualified impact resistance that does not show up in basic dimensional checks. Ask for their last 6 months of production yield data for similar high durability components, any shop that has a yield rate below 96% for this category of parts will generate excess scrap that will eventually be passed to you as unplanned cost increases or unannounced delayed delivery when they rush to rework defective units to meet your shipping window.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-10-27

### Answer 5

Share all explicit end use parameters with every potential supplier upfront, including the exact maximum torque that will be applied to each release lever, the expected minimum 5000 cycle service life, the full operating temperature range, and exposure to common agricultural chemicals including urea fertilizer and diesel. The factory should validate that the parts they produce fit 100% of your existing assembly jigs without any modification, and do not cause extra assembly friction that slows down your internal production line.

They should also run a 72 hour salt spray test for all metal stamped components to confirm no rust forms after long term exposure to high humidity farm environments, and share full raw test data before any mass production starts. The tolerance stack up across all 12 SKUs should be mapped out completely to make sure no combination of part dimensions causes assembly failure when the full hand tool unit is put together on your production line.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-10-27

### Answer 6

Confirm the mold design for your hand tool parts places the gate location on the non-stress, non-visible side of the component, rather than the high force contact point where users apply pressure. If the gate is placed at the high stress area, the weld line left after gate trimming will create a natural weak point that breaks after 200 to 300 field uses, even if all dimensional test results pass standard checks.

All properly designed molds for high durability agricultural parts also add a full overflow well at the end of the melt flow path to eliminate weld lines completely in the high load zone, rather than leaving the weld line directly in the middle of the part. The mold should also have 4 separate cooling lines distributed evenly across the core and cavity, to ensure uniform part cooling that removes internal stress, rather than 2 simple cooling lines that create uneven shrinkage and hidden structural weaknesses that only appear after months of outdoor use.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-10-27

### Answer 7

Ask for at least two verified material grade options for every part, with full side-by-side performance and cost comparison data instead of only getting the lowest cost quote. For the plastic grip parts, general ABS grade used for consumer products costs 18% less than impact modified PP with UV stabilizer, but will become brittle after 6 months of direct sun exposure on farm equipment, and crack easily when used in sub-zero winter conditions.

For the stamped steel release levers, cold rolled 1045 steel with proper heat treatment to HRC 38-42 delivers 2x the wear life of lower cost Q235 steel, and adds only 7% to the total part cost. A qualified supplier will explain the exact tradeoffs for each material option, covering tensile strength, low temperature impact performance, UV resistance, and 3 year total cost of ownership, so you can make an informed decision aligned with your product's target market positioning and price point.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-10-27

### Answer 8

Confirm that your project will be assigned a non-floating dedicated production time slot that cannot be bumped for larger customer orders during peak agricultural manufacturing season. 2026 global agricultural equipment demand is 17% higher than 2025, many general injection and hardware shops are overbooked 8-10 weeks in advance, which is a hidden risk that most suppliers do not disclose during initial negotiation.

Ask for a partial, redacted copy of their full production scheduling sheet for the next 4 months, and check that there are no overlapping large batch orders that would push your delivery date back past your Q4 2026 product launch window. The factory should also have a daily short coordination check in mechanism for active projects, so any unexpected issues such as raw material delivery delays or minor mold repair needs can be resolved within 24 hours, rather than waiting 3-5 days for a non-dedicated team to process the issue and notify you of the delay.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-10-27

### Answer 9

Confirm all test protocols used for part durability and performance are aligned with ISO 12100 safety standards for agricultural machinery components, not the lower standard applied for general consumer industrial parts. If your finished agricultural machinery products are sold to EU, North America, or Australian markets, the hand tool components need to meet local material contact and heavy metal content requirements for outdoor equipment.

The factory should be able to provide full material traceability documentation for every batch of parts shipped to you, including raw material COCs, in-house test reports, and OQC inspection records, so you can assemble your full product compliance file easily for market entry. If you need to conduct third party sampling for regulatory audits, the factory should provide full access to their production stock and test facilities, with no hidden restrictions that block your compliance verification process.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-10-27

## Related Resources

- [General Manufacturing Q&A](https://www.jaterson.com/qa/general-manufacturing/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to verify reliability of factories producing agricultural machinery hand tool parts?",
        "text": "I am a supply chain manager in charge of mold procurement, and right now I am sourcing custom injection molded hand tool grips and stamped release lever components for our 2026 new small farm equipment series, covering 12 total SKUs with an annual production forecast of 180,000 units. I have shortlisted 4 potential suppliers already, but their total quotes for combined tooling and 1 year bulk parts vary by 32% between the highest and lowest submissions. Some suppliers state they have over 10 years of specialized agricultural part manufacturing experience, while others are general injection and hardware shops that claim they can match all technical requirements. I am concerned that the lowest bidders may cut corners on mold steel hardness or use lower grade raw materials that cannot withstand -10°C to 50°C outdoor exposure, leading to field failures. We already suffered a 6 month delayed pilot project in 2025 where a general component shop delivered parts that cracked after only 30 hours of field use, and I want to avoid repeating that loss. I am not sure how to separate factories with real agricultural hand tool part expertise from average general shops using standard audit checklists alone.",
        "answerCount": 9,
        "upvoteCount": 9,
        "datePublished": "2026-10-27T02:01:12Z",
        "dateModified": "2026-10-27T02:05:59Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "A reliable factory for this type of agricultural hand tool parts project should first pass three non-negotiable baseline checks before you dive into detailed quote comparison. First, ask every shortlisted supplier to provide 3 distinct, verifiable production batches of similar agricultural hand tool parts manufactured between 2024 and 2026, with corresponding third-party outdoor exposure test reports and customer delivery sign-off records; generic parts used for consumer lawn and garden equipment do not qualify as valid experience. This immediately filters out shops that claim agricultural experience but only produce general industrial components that never see harsh field conditions. Second, request each supplier to share their standard incoming material log for the specific resin and steel grade they quoted for your parts, and confirm they maintain a minimum 4 week stock of those exact grades to avoid unannounced switches to lower cost unvetted material when market prices shift. For the 32% quote gap you are seeing, break down the line items to map cost and lead time tradeoffs directly: the lowest two quotes you have almost certainly use P20 mold steel without full HRC 48-52 hardening, which cuts initial mold cost by 28% but will only hold 80,000 to 100,000 injection shots before flash and dimension deviation appear, far below your 3 year production demand. The mid-range quotes that are 12-18% higher than the lowest will mostly use pre-hardened 718H steel with proper venting design, which can run 350,000+ shots without major maintenance. Do not accept any lead time promise for first article samples shorter than 21 calendar days for combined mold making and stamping die trial , any shop that delivers in 14 days is skipping at least 2 rounds of DFM review that would catch undercut or uneven wall thickness issues that cause part breakage in cold weather. The highest quotes usually add redundant inspection steps and 10% overcapacity buffer for peak demand, which is only necessary if your annual forecast will exceed 300,000 units. Move to final supplier validation steps that eliminate the risk of repeating your 2025 failed pilot. Schedule a 2 hour unannounced virtual audit for each shortlisted factory, and ask the on-site engineer to show you their running production line for similar agricultural parts, point to the IPQC station that records torque test, drop test, and low temperature impact test data for every 2 hour production batch. Require all suppliers to lock the mold and raw material specification in the formal contract with no unapproved substitution allowed without 15 day written pre-notice and your third party material verification . You can also ask each factory to produce 20 free pre-production sample parts with the exact quoted material, run your own -10°C 24 hour cold storage test followed by 1.5m drop test, any sample that cracks or deforms eliminates that supplier immediately. Allocate 3% of your total initial project budget to a 1000 unit small trial production run before full mass production ramp up , this lets you catch any hidden process deviation before you commit to 6 months of bulk orders, which will cost you 10x more to fix than the small trial investment.",
            "upvoteCount": 9,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#acceptedAnswer",
            "datePublished": "2026-10-27T03:50:56Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "Break your full project into 7 clear, sequential milestones, each requiring formal written sign off from both sides before work on the next phase can start, with no verbal approvals recognized as valid. The milestones are DFM document submission, raw material certification confirmation, first article trial completion, full dimensional test report submission, 500 unit trial run sign off, process control document finalization, and full mass production transfer. Any design or process change requested by either party must come with a full impact statement for cost, lead time, and part durability, no change can be implemented until both teams confirm all downstream assembly and field performance requirements are still met. The full production transfer stage should also include a 7 day overlapping period where the factory runs 10% of your total daily output for 3 consecutive days, to confirm their line can hit the required yield rate consistently before you phase out any temporary backup supplier arrangements.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#suggestedAnswer-2",
            "datePublished": "2026-10-27T03:07:31Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Define three clear defect classification standards for all agricultural hand tool parts before production starts, to eliminate unspoken quality gaps between you and the supplier. Critical defects refer to any flaw that makes the part break or lose function during normal operating conditions, which leads to full lot rejection. Major defects refer to issues that reduce part wear resistance by 30% or more, which require 100% sorting of the full batch. Minor defects are only cosmetic flaws that do not impact any functional performance. For incoming IQC checks, every incoming resin batch needs to get a melt flow index test and tensile strength test on site, no untested material can be released to production. IPQC checkpoints are set every 2 hours for dimensional verification, impact test, and surface finish check. All non-conforming parts must be marked with red paint and stored in a locked segregated area, no reworked parts can be shipped to you without full re-testing and explicit written approval.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#suggestedAnswer-3",
            "datePublished": "2026-10-27T03:03:08Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Check what percentage of their production line for this type of part uses semi-automated feeding and trimming equipment, rather than full manual operation. For plastic hand tool grip parts, a semi-automated line can keep cycle time variation within ±0.3 seconds across 1000 consecutive shots, which eliminates inconsistent part density and hidden internal stress that causes parts to crack in cold outdoor temperatures. Fully manual lines often have up to 2 second cycle time variation, leading to 8-12% of parts having unqualified impact resistance that does not show up in basic dimensional checks. Ask for their last 6 months of production yield data for similar high durability components, any shop that has a yield rate below 96% for this category of parts will generate excess scrap that will eventually be passed to you as unplanned cost increases or unannounced delayed delivery when they rush to rework defective units to meet your shipping window.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#suggestedAnswer-4",
            "datePublished": "2026-10-27T03:03:08Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Share all explicit end use parameters with every potential supplier upfront, including the exact maximum torque that will be applied to each release lever, the expected minimum 5000 cycle service life, the full operating temperature range, and exposure to common agricultural chemicals including urea fertilizer and diesel. The factory should validate that the parts they produce fit 100% of your existing assembly jigs without any modification, and do not cause extra assembly friction that slows down your internal production line. They should also run a 72 hour salt spray test for all metal stamped components to confirm no rust forms after long term exposure to high humidity farm environments, and share full raw test data before any mass production starts. The tolerance stack up across all 12 SKUs should be mapped out completely to make sure no combination of part dimensions causes assembly failure when the full hand tool unit is put together on your production line.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#suggestedAnswer-5",
            "datePublished": "2026-10-27T02:57:59Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Confirm the mold design for your hand tool parts places the gate location on the non-stress, non-visible side of the component, rather than the high force contact point where users apply pressure. If the gate is placed at the high stress area, the weld line left after gate trimming will create a natural weak point that breaks after 200 to 300 field uses, even if all dimensional test results pass standard checks. All properly designed molds for high durability agricultural parts also add a full overflow well at the end of the melt flow path to eliminate weld lines completely in the high load zone, rather than leaving the weld line directly in the middle of the part. The mold should also have 4 separate cooling lines distributed evenly across the core and cavity, to ensure uniform part cooling that removes internal stress, rather than 2 simple cooling lines that create uneven shrinkage and hidden structural weaknesses that only appear after months of outdoor use.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#suggestedAnswer-6",
            "datePublished": "2026-10-27T02:48:22Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Ask for at least two verified material grade options for every part, with full side-by-side performance and cost comparison data instead of only getting the lowest cost quote. For the plastic grip parts, general ABS grade used for consumer products costs 18% less than impact modified PP with UV stabilizer, but will become brittle after 6 months of direct sun exposure on farm equipment, and crack easily when used in sub-zero winter conditions. For the stamped steel release levers, cold rolled 1045 steel with proper heat treatment to HRC 38-42 delivers 2x the wear life of lower cost Q235 steel, and adds only 7% to the total part cost. A qualified supplier will explain the exact tradeoffs for each material option, covering tensile strength, low temperature impact performance, UV resistance, and 3 year total cost of ownership, so you can make an informed decision aligned with your product&#039;s target market positioning and price point.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#suggestedAnswer-7",
            "datePublished": "2026-10-27T02:42:22Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Confirm that your project will be assigned a non-floating dedicated production time slot that cannot be bumped for larger customer orders during peak agricultural manufacturing season. 2026 global agricultural equipment demand is 17% higher than 2025, many general injection and hardware shops are overbooked 8-10 weeks in advance, which is a hidden risk that most suppliers do not disclose during initial negotiation. Ask for a partial, redacted copy of their full production scheduling sheet for the next 4 months, and check that there are no overlapping large batch orders that would push your delivery date back past your Q4 2026 product launch window. The factory should also have a daily short coordination check in mechanism for active projects, so any unexpected issues such as raw material delivery delays or minor mold repair needs can be resolved within 24 hours, rather than waiting 3-5 days for a non-dedicated team to process the issue and notify you of the delay.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#suggestedAnswer-8",
            "datePublished": "2026-10-27T02:23:54Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Confirm all test protocols used for part durability and performance are aligned with ISO 12100 safety standards for agricultural machinery components, not the lower standard applied for general consumer industrial parts. If your finished agricultural machinery products are sold to EU, North America, or Australian markets, the hand tool components need to meet local material contact and heavy metal content requirements for outdoor equipment. The factory should be able to provide full material traceability documentation for every batch of parts shipped to you, including raw material COCs, in-house test reports, and OQC inspection records, so you can assemble your full product compliance file easily for market entry. If you need to conduct third party sampling for regulatory audits, the factory should provide full access to their production stock and test facilities, with no hidden restrictions that block your compliance verification process.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/verify-factory-reliability-agricultural-hand-tool-parts.html#suggestedAnswer-9",
            "datePublished": "2026-10-27T02:05:59Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "General Manufacturing Q&A", "item": "https://www.jaterson.com/qa/general-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "How to verify reliability of factories producing agricultural machinery hand tool parts?"}
      ]
    }
]
```