---
title: "What to check before sourcing wholesale ODM impact driver housings?"
description: "Struggling with unclear quotes, unreliable suppliers and delayed samples for your 2026 impact driver launch? Get actionable guidance on RFQ structuring, cost verification, supplier qualification and timeline control to avoid hidden risks and hit your launch schedule."
url: "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html"
language: "en"
type: "Q&A"
category: "Custom Manufacturing Q&A"
datePublished: "2026-09-29"
dateModified: "2026-09-29"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# What to check before sourcing wholesale ODM impact driver housings?

## Question

 I’m a product development manager at a mid-sized consumer power tool brand, and I’m pushing our new 18V compact impact driver launch scheduled for Q4 2026 right now. We already finalized the 3D design of the overmolded TPU + PC housing, but our previous injection molding supplier missed 3 sample deadlines last quarter and delivered parts with 12% dimensional deviation that broke during drop tests. We need to switch to a proper wholesale ODM manufacturer for the housings, but I’m stuck on how to structure my RFQ correctly, tell apart legitimate experienced suppliers from trading middlemen, and avoid hidden costs that will blow up our BOM budget. Right now we have 2 sample orders (10 pcs each for lab testing) followed by a first mass run of 12,000 units, and I don’t want to waste 3-4 weeks sending RFQs to 10 different suppliers that can’t actually meet our tolerance requirements. I need a clear framework to evaluate quotes, confirm realistic lead times, and lock in a supplier that won’t derail our launch timeline. 

## Answers
                            
### Answer 1 — Best Answer

Start by compiling a complete, unambiguous RFQ package before you send out any requests, to eliminate 60% of mismatched quotes and unnecessary back-and-forth in 2026. Include full 3D CAD files with clear GD&T annotations, exact material specifications (virgin flame retardant PC base, anti-slip TPU overmold), required ±0.1mm tolerance for all motor/battery mounting interfaces, 1.5m concrete drop test standard, surface finish requirement, and exact delivery deadlines for samples and mass units. Vague RFQs that omit these details almost always lead to underquoting followed by unapproved price hikes later in the project.

Break down every submitted quote line by line to filter out unqualified bidders. For a 2-cavity overmold tool for this 18V impact driver housing, the 2026 Zhejiang market price ranges from $2800 to $4200. Any quote below $2500 almost always uses a pre-used mold base and non-hardened cavity steel, which will cause flash, delamination and dimensional drift after 5000 shots. **Verify the tooling life guarantee explicitly in the written quote**, as qualified manufacturers all offer a minimum 100,000 shots warranty for power tool housing molds. For unit pricing on 12,000 units, the normal range is $1.28 to $1.72 per piece, with the gap coming from material grade, injection cycle time and secondary deburring processes. Legitimate ODMs with relevant experience usually set a 5000 pcs MOQ for first custom mass orders, any supplier that accepts 500 pcs MOQ is almost certainly using low-precision small tonnage machines that cannot maintain consistent quality.

Validate all stated lead times against the current industry baseline to spot unrealistic promises. The standard timeline for this project is 7-9 days for DFM review, 18-22 days for mold fabrication, 3-5 days for trial sampling, 2-3 days for sample shipping, and 12-16 days for mass production after sample sign-off. **Filter out any supplier that promises total sample delivery under 15 days**, as that almost always skips mandatory DFM review and runs unvetted mold designs that cause weeks of rework later.

Use 3 core criteria to finalize your supplier selection. First, confirm the supplier operates 120T to 180T clamping force injection machines, which are the exact size required for this housing part, and ask to see 3 of their 2025-2026 finished ODM impact driver housing projects. Second, do not pay 100% of tooling cost upfront, the standard industry term for this type of project is 40% deposit when tool fabrication starts, 40% after first sample approval, 20% before mass production release. **Lock all production slots in written confirmation** to avoid being deprioritized behind larger volume power tool orders during the peak Q3 2026 production window.

**status:** accepted
**Author:** Linda Xu
**Date:** 2026-09-29

### Answer 2

When sending your design for sample request, don’t skip the free DFM review step even if you are pressed for timeline. Most manufacturers can flag at least 3-5 design issues that will cause demolding difficulty, overmold delamination, or uneven wall thickness before any steel is cut. For your 10 pcs test sample order, you can choose 3D printed rapid prototypes first for assembly fit check, before you invest in hard tooling, this can cut your total iteration cycle by 7 to 10 days.

You also need to make sure the trial samples are produced with the exact same material grade and injection parameters that will be used for mass production, not adjusted temporary parameters just to get parts out fast, because those test results will not reflect real mass production part performance. Run 1.5m drop test on the first 5 trial samples before you approve the mold for mass production, to avoid reworking the mold after you have already committed to a large batch.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-29

### Answer 3

All impact driver housings sold for North American and EU markets need to meet UL 94 V-0 flame retardant requirement for the rigid PC layer, and reach RoHS 2024 restriction for heavy metal content. You need to ask the supplier to provide full material test reports for the exact resin batch they use for your order, not generic public reports from the resin supplier.

If your target market also requires UKCA marking, the housing material needs to pass additional low temperature impact test at -20℃. Do not accept parts that do not come with traceable batch number, because if you get audited by the market regulator later, you will not be able to provide valid documentation to prove compliance, which can lead to full product recall and heavy fines. All test reports should be issued by a third party lab accredited within the last 12 months.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-29

### Answer 4

When you shortlist 2-3 suppliers, run a remote process audit first before you place any deposit. Ask them to show you their production floor, their existing mold storage area, and the ongoing power tool housing production lines, no legitimate factory will refuse this request.

Check if their workshop has separate dust-free area for post processing of power tool plastic parts, because dust and oil residue on the housing surface will reduce the bonding strength between the TPU overmold layer and PC base layer. If the supplier can not provide clear photos or live video of their existing impact driver housing parts, there is a high chance they do not have actual relevant production experience and will outsource your order to a third party workshop at a lower price, which will create huge quality risk.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-29

### Answer 5

The biggest cost variance in custom impact driver housing orders comes from three parts: material cost, mold amortization, and process yield. Virgin flame retardant PC resin for power tool parts costs roughly 3.2 USD per kg in 2026, while recycled blended PC only costs 1.8 USD per kg, that can create almost 0.4 USD per unit gap in the quote.

If you distribute the mold amortization across 12,000 units, it adds roughly 0.3 USD per piece, but if your annual order volume goes up to 50,000 units later, the mold amortization per unit can drop below 0.08 USD. The normal production yield for qualified suppliers for this overmold part is above 92%, if a supplier quotes you an extremely low unit price, they most likely calculate yield at 100% which will cause a lot of hidden rework cost and delayed delivery later.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-29

### Answer 6

Custom impact driver housings have sharp edges and thin wall sections around the motor mounting opening, which are very easy to get scratched or cracked during long distance sea freight. You need to specify individual blister tray packaging for each housing in your order, not loose bulk packaging in cartons, because bulk packaging will cause 3-5% of the parts to get surface scratch damage that can not be repaired.

The outer carton should meet 1200 psi burst strength standard, and you need to add EPE foam padding between layers inside the carton to avoid collision during transit. You also need to make sure the supplier prints clear batch number and material specification label on each carton, so you can run traceability check quickly if you find any quality issue during incoming inspection. If you skip this packaging specification, you might end up with hundreds of non-conforming parts when you receive the shipment.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-09-29

### Answer 7

Before you confirm the order, lock the production slot in writing with the supplier, especially in 2026 when power tool component orders are peaking in Q3 and Q4 for the year end launch season. Most factories will prioritize larger volume orders if they do not have a confirmed slot booking, which can push your delivery back by 1-2 weeks easily.

Confirm that your mold will be placed in their priority production queue, not arranged as a backup order that runs when they have free machine time. You also need to set 2 intermediate check points during mold fabrication, one after the cavity steel is finished, another before the first trial injection, to make sure no unexpected delay happens. Any delay at these two check points can be adjusted in advance without pushing back the final sample delivery timeline.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-09-29

### Answer 8

Set clear inspection criteria before the supplier starts production, to avoid disagreement on non-conforming parts later. The AQL level for cosmetic defects on impact driver housings should be 0.65 for surface scratch, no scratch longer than 2mm is allowed on the grip area. Dimensional check should cover 100% of the 4 critical mounting holes that connect the housing to the motor and battery pack, no deviation over 0.1mm is allowed.

During IPQC, the injection team needs to check 5 parts every 2 hours for flash and delamination, and you can arrange a third party inspector to run full OQC check 1 day before shipment, to filter out all non-conforming parts before they leave the factory. All non-conforming parts need to be clearly sorted and scrapped, not mixed with qualified parts.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-29

### Answer 9

Map all your project milestones on a shared tracker that both teams update every 3 days, to eliminate communication delay. After the first trial sample is sent, you need to sign off the sample within 3 working days, do not hold the sample for more than 7 days for internal review, because that will break the production slot reservation and push back the whole timeline.

If you need to make minor design changes after sample testing, evaluate if the change is critical before you send it to the supplier, any minor modification on the mold will take 3-5 extra days and cost extra 10-15% of the original mold cost. All change requests need to be documented in writing and signed off by both sides, to avoid misinterpretation and unexpected cost added later.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-29

### Answer 10

The housing design needs to leave proper tolerance for the internal motor, battery pack, and trigger switch assembly, do not make the mounting interface too tight, which will cause assembly jamming on your production line. You can send 1 set of your standard internal components to the ODM manufacturer before the first trial sample run, so they can test the assembly fit with their trial parts directly, to avoid mismatch that can not be found with 2D dimensional check alone.

The TPU overmold layer needs to have proper anti-slip texture depth of 0.2mm to 0.3mm, too shallow texture will cause slipping during user operation, too deep texture will accumulate dirt easily. You also need to validate that the housing can withstand at least 50 cycles of 1.5m drop test onto concrete without cracking, to make sure the part meets your end user field performance requirement.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-29

## Related Resources

- [Custom Manufacturing Q&A](https://www.jaterson.com/qa/oem-odm/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What to check before sourcing wholesale ODM impact driver housings?",
        "text": "I’m a product development manager at a mid-sized consumer power tool brand, and I’m pushing our new 18V compact impact driver launch scheduled for Q4 2026 right now. We already finalized the 3D design of the overmolded TPU + PC housing, but our previous injection molding supplier missed 3 sample deadlines last quarter and delivered parts with 12% dimensional deviation that broke during drop tests. We need to switch to a proper wholesale ODM manufacturer for the housings, but I’m stuck on how to structure my RFQ correctly, tell apart legitimate experienced suppliers from trading middlemen, and avoid hidden costs that will blow up our BOM budget. Right now we have 2 sample orders (10 pcs each for lab testing) followed by a first mass run of 12,000 units, and I don’t want to waste 3-4 weeks sending RFQs to 10 different suppliers that can’t actually meet our tolerance requirements. I need a clear framework to evaluate quotes, confirm realistic lead times, and lock in a supplier that won’t derail our launch timeline.",
        "answerCount": 10,
        "upvoteCount": 5,
        "datePublished": "2026-09-29T11:46:33Z",
        "dateModified": "2026-09-29T11:50:28Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "Start by compiling a complete, unambiguous RFQ package before you send out any requests, to eliminate 60% of mismatched quotes and unnecessary back-and-forth in 2026. Include full 3D CAD files with clear GD&amp;T annotations, exact material specifications (virgin flame retardant PC base, anti-slip TPU overmold), required ±0.1mm tolerance for all motor/battery mounting interfaces, 1.5m concrete drop test standard, surface finish requirement, and exact delivery deadlines for samples and mass units. Vague RFQs that omit these details almost always lead to underquoting followed by unapproved price hikes later in the project. Break down every submitted quote line by line to filter out unqualified bidders. For a 2-cavity overmold tool for this 18V impact driver housing, the 2026 Zhejiang market price ranges from $2800 to $4200. Any quote below $2500 almost always uses a pre-used mold base and non-hardened cavity steel, which will cause flash, delamination and dimensional drift after 5000 shots. Verify the tooling life guarantee explicitly in the written quote , as qualified manufacturers all offer a minimum 100,000 shots warranty for power tool housing molds. For unit pricing on 12,000 units, the normal range is $1.28 to $1.72 per piece, with the gap coming from material grade, injection cycle time and secondary deburring processes. Legitimate ODMs with relevant experience usually set a 5000 pcs MOQ for first custom mass orders, any supplier that accepts 500 pcs MOQ is almost certainly using low-precision small tonnage machines that cannot maintain consistent quality. Validate all stated lead times against the current industry baseline to spot unrealistic promises. The standard timeline for this project is 7-9 days for DFM review, 18-22 days for mold fabrication, 3-5 days for trial sampling, 2-3 days for sample shipping, and 12-16 days for mass production after sample sign-off. Filter out any supplier that promises total sample delivery under 15 days , as that almost always skips mandatory DFM review and runs unvetted mold designs that cause weeks of rework later. Use 3 core criteria to finalize your supplier selection. First, confirm the supplier operates 120T to 180T clamping force injection machines, which are the exact size required for this housing part, and ask to see 3 of their 2025-2026 finished ODM impact driver housing projects. Second, do not pay 100% of tooling cost upfront, the standard industry term for this type of project is 40% deposit when tool fabrication starts, 40% after first sample approval, 20% before mass production release. Lock all production slots in written confirmation to avoid being deprioritized behind larger volume power tool orders during the peak Q3 2026 production window.",
            "upvoteCount": 5,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#acceptedAnswer",
            "datePublished": "2026-09-29T13:33:31Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "When sending your design for sample request, don’t skip the free DFM review step even if you are pressed for timeline. Most manufacturers can flag at least 3-5 design issues that will cause demolding difficulty, overmold delamination, or uneven wall thickness before any steel is cut. For your 10 pcs test sample order, you can choose 3D printed rapid prototypes first for assembly fit check, before you invest in hard tooling, this can cut your total iteration cycle by 7 to 10 days. You also need to make sure the trial samples are produced with the exact same material grade and injection parameters that will be used for mass production, not adjusted temporary parameters just to get parts out fast, because those test results will not reflect real mass production part performance. Run 1.5m drop test on the first 5 trial samples before you approve the mold for mass production, to avoid reworking the mold after you have already committed to a large batch.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-2",
            "datePublished": "2026-09-29T13:16:23Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "All impact driver housings sold for North American and EU markets need to meet UL 94 V-0 flame retardant requirement for the rigid PC layer, and reach RoHS 2024 restriction for heavy metal content. You need to ask the supplier to provide full material test reports for the exact resin batch they use for your order, not generic public reports from the resin supplier. If your target market also requires UKCA marking, the housing material needs to pass additional low temperature impact test at -20℃. Do not accept parts that do not come with traceable batch number, because if you get audited by the market regulator later, you will not be able to provide valid documentation to prove compliance, which can lead to full product recall and heavy fines. All test reports should be issued by a third party lab accredited within the last 12 months.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-3",
            "datePublished": "2026-09-29T13:06:18Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When you shortlist 2-3 suppliers, run a remote process audit first before you place any deposit. Ask them to show you their production floor, their existing mold storage area, and the ongoing power tool housing production lines, no legitimate factory will refuse this request. Check if their workshop has separate dust-free area for post processing of power tool plastic parts, because dust and oil residue on the housing surface will reduce the bonding strength between the TPU overmold layer and PC base layer. If the supplier can not provide clear photos or live video of their existing impact driver housing parts, there is a high chance they do not have actual relevant production experience and will outsource your order to a third party workshop at a lower price, which will create huge quality risk.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-4",
            "datePublished": "2026-09-29T12:49:06Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The biggest cost variance in custom impact driver housing orders comes from three parts: material cost, mold amortization, and process yield. Virgin flame retardant PC resin for power tool parts costs roughly 3.2 USD per kg in 2026, while recycled blended PC only costs 1.8 USD per kg, that can create almost 0.4 USD per unit gap in the quote. If you distribute the mold amortization across 12,000 units, it adds roughly 0.3 USD per piece, but if your annual order volume goes up to 50,000 units later, the mold amortization per unit can drop below 0.08 USD. The normal production yield for qualified suppliers for this overmold part is above 92%, if a supplier quotes you an extremely low unit price, they most likely calculate yield at 100% which will cause a lot of hidden rework cost and delayed delivery later.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-5",
            "datePublished": "2026-09-29T12:44:28Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Custom impact driver housings have sharp edges and thin wall sections around the motor mounting opening, which are very easy to get scratched or cracked during long distance sea freight. You need to specify individual blister tray packaging for each housing in your order, not loose bulk packaging in cartons, because bulk packaging will cause 3-5% of the parts to get surface scratch damage that can not be repaired. The outer carton should meet 1200 psi burst strength standard, and you need to add EPE foam padding between layers inside the carton to avoid collision during transit. You also need to make sure the supplier prints clear batch number and material specification label on each carton, so you can run traceability check quickly if you find any quality issue during incoming inspection. If you skip this packaging specification, you might end up with hundreds of non-conforming parts when you receive the shipment.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-6",
            "datePublished": "2026-09-29T12:42:34Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Before you confirm the order, lock the production slot in writing with the supplier, especially in 2026 when power tool component orders are peaking in Q3 and Q4 for the year end launch season. Most factories will prioritize larger volume orders if they do not have a confirmed slot booking, which can push your delivery back by 1-2 weeks easily. Confirm that your mold will be placed in their priority production queue, not arranged as a backup order that runs when they have free machine time. You also need to set 2 intermediate check points during mold fabrication, one after the cavity steel is finished, another before the first trial injection, to make sure no unexpected delay happens. Any delay at these two check points can be adjusted in advance without pushing back the final sample delivery timeline.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-7",
            "datePublished": "2026-09-29T12:34:23Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Set clear inspection criteria before the supplier starts production, to avoid disagreement on non-conforming parts later. The AQL level for cosmetic defects on impact driver housings should be 0.65 for surface scratch, no scratch longer than 2mm is allowed on the grip area. Dimensional check should cover 100% of the 4 critical mounting holes that connect the housing to the motor and battery pack, no deviation over 0.1mm is allowed. During IPQC, the injection team needs to check 5 parts every 2 hours for flash and delamination, and you can arrange a third party inspector to run full OQC check 1 day before shipment, to filter out all non-conforming parts before they leave the factory. All non-conforming parts need to be clearly sorted and scrapped, not mixed with qualified parts.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-8",
            "datePublished": "2026-09-29T12:31:50Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Map all your project milestones on a shared tracker that both teams update every 3 days, to eliminate communication delay. After the first trial sample is sent, you need to sign off the sample within 3 working days, do not hold the sample for more than 7 days for internal review, because that will break the production slot reservation and push back the whole timeline. If you need to make minor design changes after sample testing, evaluate if the change is critical before you send it to the supplier, any minor modification on the mold will take 3-5 extra days and cost extra 10-15% of the original mold cost. All change requests need to be documented in writing and signed off by both sides, to avoid misinterpretation and unexpected cost added later.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-9",
            "datePublished": "2026-09-29T12:15:33Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The housing design needs to leave proper tolerance for the internal motor, battery pack, and trigger switch assembly, do not make the mounting interface too tight, which will cause assembly jamming on your production line. You can send 1 set of your standard internal components to the ODM manufacturer before the first trial sample run, so they can test the assembly fit with their trial parts directly, to avoid mismatch that can not be found with 2D dimensional check alone. The TPU overmold layer needs to have proper anti-slip texture depth of 0.2mm to 0.3mm, too shallow texture will cause slipping during user operation, too deep texture will accumulate dirt easily. You also need to validate that the housing can withstand at least 50 cycles of 1.5m drop test onto concrete without cracking, to make sure the part meets your end user field performance requirement.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/sourcing-wholesale-odm-impact-driver-housings-checklist.html#suggestedAnswer-10",
            "datePublished": "2026-09-29T11:50:28Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.jaterson.com/qa/oem-odm/"}          ,{"@type": "ListItem", "position": 4, "name": "What to check before sourcing wholesale ODM impact driver housings?"}
      ]
    }
]
```