---
title: "How to select a reliable adapter for consumer electronics supplier for OEM projects?"
description: "Resolve common new OEM consumer electronics adapter sample development pain points including tolerance mismatch, inconsistent surface finish, sample delays and cost overruns, with actionable criteria to select suppliers and hit your 2026 launch timeline."
url: "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html"
language: "en"
type: "Q&A"
category: "Custom Manufacturing Q&A"
datePublished: "2026-09-19"
dateModified: "2026-09-19"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# How to select a reliable adapter for consumer electronics supplier for OEM projects?

## Question

 I’m currently leading the OEM sample push for our new 65W GaN travel adapter line scheduled to launch in Q4 2026, and I’m stuck at a crossroad that’s delaying my supplier finalization. We previously had a bad experience where our old supplier’s over-molded plastic housing had 0.15mm dimensional deviation on the USB port opening, leading to 12% of first batch samples failing assembly, plus the matte texture on the outer shell was inconsistent across 8 pre-production samples, which broke our brand’s unified appearance standard. Right now I have two shortlisted suppliers, both quoting similar unit prices, but one says they can turn around 10 prototype samples in 7 days while the other says 12 days, and neither has clearly laid out how they will guarantee zero assembly failure and 100% surface finish consistency for the first formal sample batch. I need to figure out what hard evaluation metrics I should use to pick the right partner, and what non-negotiable clauses I need to add to our sample service agreement to avoid repeating the past quality issues, without blowing my already tight 6-week pre-launch validation window. 

## Answers
                            
### Answer 1 — Best Answer

The core difference between a qualified and unqualified adapter for consumer electronics supplier in 2026 is not just quoted lead time or unit price, but their ability to lock in process stability at the sample stage, rather than making adjustments after you receive non-conforming parts. Many shops that advertise 7-day prototype turnaround use generic, unoptimized test molds to produce adapter shells, which saves time on initial tooling modification but leaves all dimensional and surface finish issues unresolved when you move to mass production. This is the most common root cause for the assembly mismatch and texture inconsistency you encountered with your previous supplier.

For your specific 65W GaN adapter project, there are two distinct scenarios you can match against your current priorities. If you only need 1-2 dummy samples for industrial design review without functional testing, the 7-day rapid prototype service is sufficient, as these parts do not need to match final production part specifications. But if these samples are for full assembly testing, drop testing, and final sign-off before mass production, the 12-day turnaround from the second supplier is far more appropriate, as they would be using pre-hardened production tooling with all DFM adjustments completed before first shot.

**First non-negotiable evaluation metric** to apply to both suppliers before signing is to ask for their first article inspection report of 3 random adapter parts they produced for similar consumer electronics adapter projects in the last 3 months, with full dimensional data on port opening tolerance, shell flatness, and surface roughness readings. Reject any supplier that cannot provide these documented records, as their process control is not mature enough for your requirements. **Second non-negotiable clause** to add to the sample agreement is that all 10 submitted prototype samples must be produced from the exact same cavity of the final production mold, not from rapid tooling or 3D printed molds, and no post-processing polishing is allowed on the outer visible surface to cover up molding defects.

You can also request a small 5-part pre-test run at no extra cost before formal sample production, to verify that the USB port opening tolerance stays within your required +/-0.05mm range, and that the matte surface finish has a delta E value less than 1.2 across all parts. This pre-test run only adds 2 days to your timeline, and will eliminate 90% of potential rework later. For your 6-week validation window, you can allocate 2 days for supplier verification, 12 days for sample production, 7 days for in-house testing, and leave 21 days buffer for minor adjustments, which will keep the whole schedule well within your launch deadline. **Final action** to take before final selection is to cross check if the supplier’s mold cavity for your adapter parts reserves 0.03% shrinkage compensation for the specified PC+ABS blend material you are using, as unaccounted shrinkage is the top hidden cause for dimensional deviation on adapter shell parts.

**status:** accepted
**Author:** Jason Zhou
**Date:** 2026-09-19

### Answer 2

For adapter housing molds that run high volume production of 100k+ units annually, P20 steel is the standard cost-effective choice, but if you require consistent dimensional performance across more than 500k cycles, upgrading to S136 stainless steel will eliminate 80% of surface finish degradation caused by long term resin material erosion. The expected mold maintenance cycle for standard adapter molds should be set at every 120k shots, with full disassembly, vent cleaning, and gate polishing completed during each scheduled stop.

The tolerance of the mold cavity itself should be controlled at 50% of the final part’s required tolerance, to leave enough buffer for material shrinkage variation and process parameter adjustments. If a supplier proposes using pre-made mold bases that are repurposed from older adapter projects, ask for the full usage history of the existing cavity, as cavities that have already run more than 300k cycles will have worn edges that cause burrs around the USB port opening, leading to assembly issues.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-19

### Answer 3

The gate location on your 65W adapter housing is one of the most impactful hidden factors for both dimensional consistency and surface appearance. If the gate is placed on the outer visible face of the shell, even after proper trimming, the gate vestige will leave a tiny uneven spot that breaks the uniform matte texture. The optimal location is to place the side gate at the non-visible seam line of the two shell halves, so all gate marks are fully hidden after ultrasonic assembly is completed.

When designing the cavity structure, adding 4 evenly distributed ejector pins on the inner non-visible side of the back shell will eliminate the ejector pin marks that often show through thin 1.2mm adapter shell walls to the outer surface. The DFM review should also adjust the draft angle of the inner port opening to 1.5 degrees, rather than the standard 1 degree, to avoid scuffing marks when the part is ejected from the mold, which will remove the need for secondary manual trimming around the port edge.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-19

### Answer 4

For the metal connector pins and mounting brackets inside your consumer electronics adapter, the standard achievable tolerance from CNC machining can reach +/-0.02mm for most feature dimensions, as long as the custom fixture is designed to hold the blank stamping part from three non-critical outer surfaces, rather than clamping on the functional mounting holes. This clamping method will eliminate the 0.08mm positioning deviation that often occurs when using generic flat jaw fixtures for small metal adapter components.

The surface finish for the contact face of the power pins can reach Ra 0.8 after a single pass of high feed machining, removing the need for separate polishing processes that add lead time and introduce inconsistent surface roughness across batches. All critical dimensions of the machined metal parts should be measured with a CMM after the first 5 parts are completed, to confirm no tool wear is causing gradual dimension drift across the full production run.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-19

### Answer 5

Map out all milestone checkpoints for your adapter sample development process in a shared online tracker, with each stage marked with explicit pass/fail criteria that both sides confirm in writing before moving to the next step. The checkpoint after DFM review should lock in all dimensional parameters, material grades, and surface finish standards, and any requested changes after this point should trigger a formal change request that updates both lead time and cost accordingly, to avoid unplanned delays that eat into your validation window.

Before sample delivery, arrange a virtual pre-dispatch inspection to confirm 3 random parts from the batch meet all pre-defined requirements, so non-conforming parts do not get shipped to your facility and waste 3 to 4 days of transit time. The production transfer stage from sample to mass production should include a mandatory 100-piece trial run, with all process parameters fully documented and saved, to ensure the first mass production batch has zero deviations from the approved golden sample.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-19

### Answer 6

The most common defects for thin wall 65W adapter housing parts include sink marks on the inner rib locations, warpage that causes the two shell halves to not close properly, and tiny flash on the port edge that blocks USB connector insertion. To eliminate these defects, the injection process window should be optimized across 5 separate test runs, adjusting melt temperature, holding pressure, and cooling time step by step, to find the parameter set that produces conforming parts even with minor raw material batch variation.

The optimized process window should allow at least +/-10% adjustment margin on all key parameters, so minor fluctuations in factory ambient temperature during summer or winter production will not cause part defects. The cooling time should be extended by 3 seconds from the minimum viable time, even if it adds a small amount to cycle time, as this will reduce post-molding warpage by more than 70% and eliminate the need for secondary fixture cooling that takes extra days to complete.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-19

### Answer 7

Define defect classification for your adapter parts clearly before production starts, separating all potential non-conformities into critical, major and minor levels. Critical defects include dimensional deviation over the allowed tolerance that blocks full assembly, and sharp burrs on the port edge that can damage user USB devices; any part with a critical defect is 100% rejected. Major defects include inconsistent matte surface texture that does not match the golden sample, and warpage that is more than 0.1mm; the allowed maximum major defect rate for sample batches is 0%.

IQC incoming inspection for raw resin material should include a melt flow index test for every batch, to confirm it matches the specified grade requirements, avoiding raw material variation that causes unexpected shrinkage. If any defect is found during production, an 8D corrective action report must be submitted within 48 hours, with root cause analysis, immediate containment action, and long term preventive measure clearly documented.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-19

### Answer 8

All adapter parts you receive from the supplier should be validated under real assembly conditions, using your exact ultrasonic welding equipment and USB connector plugs to test fit, rather than only checking 2D drawings for dimensional accuracy. Even parts that meet all drawing tolerances can have minor unaccounted for draft angle or surface finish issues that cause assembly failure on your specific production line.

The assembled adapter units should also go through a 1.5m drop test onto concrete surface from 6 different orientations, to confirm the plastic shell will not crack or separate after impact, which is a common hidden failure mode for thin wall consumer electronics adapter parts. The parts should also be tested for color fastness after 72 hours of exposure to 60 degree high temperature environment, to make sure the matte outer surface does not fade or change color before the end of the product’s expected 3 year service life.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-09-19

### Answer 9

For 65W consumer electronics adapter housings, the standard PC+ABS blend grade with 10% glass fiber filler offers the best balance of impact resistance, heat resistance, and flowability for thin wall molding applications. You do not need to specify a high end PC grade with 20% glass fiber content, as that will increase material cost by 35% and also make it harder to get a uniform matte surface finish.

If you plan to produce adapter units for EU market sale, confirm the selected resin grade meets UL 94 V-0 flammability standard, without adding extra flame retardant additives that can cause the surface finish to become glossy instead of matte. For the internal metal mounting brackets, using SPCC cold rolled steel with 0.8mm thickness offers enough structural support, and costs 40% less than using 304 stainless steel for non-corrosion exposed areas. All selected material grades should come with full material safety data sheets and formal certification documents, to support your product’s market compliance checks later.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-19

## Related Resources

- [Custom Manufacturing Q&A](https://www.jaterson.com/qa/oem-odm/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to select a reliable adapter for consumer electronics supplier for OEM projects?",
        "text": "I’m currently leading the OEM sample push for our new 65W GaN travel adapter line scheduled to launch in Q4 2026, and I’m stuck at a crossroad that’s delaying my supplier finalization. We previously had a bad experience where our old supplier’s over-molded plastic housing had 0.15mm dimensional deviation on the USB port opening, leading to 12% of first batch samples failing assembly, plus the matte texture on the outer shell was inconsistent across 8 pre-production samples, which broke our brand’s unified appearance standard. Right now I have two shortlisted suppliers, both quoting similar unit prices, but one says they can turn around 10 prototype samples in 7 days while the other says 12 days, and neither has clearly laid out how they will guarantee zero assembly failure and 100% surface finish consistency for the first formal sample batch. I need to figure out what hard evaluation metrics I should use to pick the right partner, and what non-negotiable clauses I need to add to our sample service agreement to avoid repeating the past quality issues, without blowing my already tight 6-week pre-launch validation window.",
        "answerCount": 9,
        "upvoteCount": 10,
        "datePublished": "2026-09-19T00:41:32Z",
        "dateModified": "2026-09-19T01:05:03Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The core difference between a qualified and unqualified adapter for consumer electronics supplier in 2026 is not just quoted lead time or unit price, but their ability to lock in process stability at the sample stage, rather than making adjustments after you receive non-conforming parts. Many shops that advertise 7-day prototype turnaround use generic, unoptimized test molds to produce adapter shells, which saves time on initial tooling modification but leaves all dimensional and surface finish issues unresolved when you move to mass production. This is the most common root cause for the assembly mismatch and texture inconsistency you encountered with your previous supplier. For your specific 65W GaN adapter project, there are two distinct scenarios you can match against your current priorities. If you only need 1-2 dummy samples for industrial design review without functional testing, the 7-day rapid prototype service is sufficient, as these parts do not need to match final production part specifications. But if these samples are for full assembly testing, drop testing, and final sign-off before mass production, the 12-day turnaround from the second supplier is far more appropriate, as they would be using pre-hardened production tooling with all DFM adjustments completed before first shot. First non-negotiable evaluation metric to apply to both suppliers before signing is to ask for their first article inspection report of 3 random adapter parts they produced for similar consumer electronics adapter projects in the last 3 months, with full dimensional data on port opening tolerance, shell flatness, and surface roughness readings. Reject any supplier that cannot provide these documented records, as their process control is not mature enough for your requirements. Second non-negotiable clause to add to the sample agreement is that all 10 submitted prototype samples must be produced from the exact same cavity of the final production mold, not from rapid tooling or 3D printed molds, and no post-processing polishing is allowed on the outer visible surface to cover up molding defects. You can also request a small 5-part pre-test run at no extra cost before formal sample production, to verify that the USB port opening tolerance stays within your required +/-0.05mm range, and that the matte surface finish has a delta E value less than 1.2 across all parts. This pre-test run only adds 2 days to your timeline, and will eliminate 90% of potential rework later. For your 6-week validation window, you can allocate 2 days for supplier verification, 12 days for sample production, 7 days for in-house testing, and leave 21 days buffer for minor adjustments, which will keep the whole schedule well within your launch deadline. Final action to take before final selection is to cross check if the supplier’s mold cavity for your adapter parts reserves 0.03% shrinkage compensation for the specified PC+ABS blend material you are using, as unaccounted shrinkage is the top hidden cause for dimensional deviation on adapter shell parts.",
            "upvoteCount": 10,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#acceptedAnswer",
            "datePublished": "2026-09-19T01:59:07Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "For adapter housing molds that run high volume production of 100k+ units annually, P20 steel is the standard cost-effective choice, but if you require consistent dimensional performance across more than 500k cycles, upgrading to S136 stainless steel will eliminate 80% of surface finish degradation caused by long term resin material erosion. The expected mold maintenance cycle for standard adapter molds should be set at every 120k shots, with full disassembly, vent cleaning, and gate polishing completed during each scheduled stop. The tolerance of the mold cavity itself should be controlled at 50% of the final part’s required tolerance, to leave enough buffer for material shrinkage variation and process parameter adjustments. If a supplier proposes using pre-made mold bases that are repurposed from older adapter projects, ask for the full usage history of the existing cavity, as cavities that have already run more than 300k cycles will have worn edges that cause burrs around the USB port opening, leading to assembly issues.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#suggestedAnswer-2",
            "datePublished": "2026-09-19T01:36:32Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The gate location on your 65W adapter housing is one of the most impactful hidden factors for both dimensional consistency and surface appearance. If the gate is placed on the outer visible face of the shell, even after proper trimming, the gate vestige will leave a tiny uneven spot that breaks the uniform matte texture. The optimal location is to place the side gate at the non-visible seam line of the two shell halves, so all gate marks are fully hidden after ultrasonic assembly is completed. When designing the cavity structure, adding 4 evenly distributed ejector pins on the inner non-visible side of the back shell will eliminate the ejector pin marks that often show through thin 1.2mm adapter shell walls to the outer surface. The DFM review should also adjust the draft angle of the inner port opening to 1.5 degrees, rather than the standard 1 degree, to avoid scuffing marks when the part is ejected from the mold, which will remove the need for secondary manual trimming around the port edge.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#suggestedAnswer-3",
            "datePublished": "2026-09-19T01:34:32Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For the metal connector pins and mounting brackets inside your consumer electronics adapter, the standard achievable tolerance from CNC machining can reach +/-0.02mm for most feature dimensions, as long as the custom fixture is designed to hold the blank stamping part from three non-critical outer surfaces, rather than clamping on the functional mounting holes. This clamping method will eliminate the 0.08mm positioning deviation that often occurs when using generic flat jaw fixtures for small metal adapter components. The surface finish for the contact face of the power pins can reach Ra 0.8 after a single pass of high feed machining, removing the need for separate polishing processes that add lead time and introduce inconsistent surface roughness across batches. All critical dimensions of the machined metal parts should be measured with a CMM after the first 5 parts are completed, to confirm no tool wear is causing gradual dimension drift across the full production run.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#suggestedAnswer-4",
            "datePublished": "2026-09-19T01:24:10Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Map out all milestone checkpoints for your adapter sample development process in a shared online tracker, with each stage marked with explicit pass/fail criteria that both sides confirm in writing before moving to the next step. The checkpoint after DFM review should lock in all dimensional parameters, material grades, and surface finish standards, and any requested changes after this point should trigger a formal change request that updates both lead time and cost accordingly, to avoid unplanned delays that eat into your validation window. Before sample delivery, arrange a virtual pre-dispatch inspection to confirm 3 random parts from the batch meet all pre-defined requirements, so non-conforming parts do not get shipped to your facility and waste 3 to 4 days of transit time. The production transfer stage from sample to mass production should include a mandatory 100-piece trial run, with all process parameters fully documented and saved, to ensure the first mass production batch has zero deviations from the approved golden sample.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#suggestedAnswer-5",
            "datePublished": "2026-09-19T01:23:40Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The most common defects for thin wall 65W adapter housing parts include sink marks on the inner rib locations, warpage that causes the two shell halves to not close properly, and tiny flash on the port edge that blocks USB connector insertion. To eliminate these defects, the injection process window should be optimized across 5 separate test runs, adjusting melt temperature, holding pressure, and cooling time step by step, to find the parameter set that produces conforming parts even with minor raw material batch variation. The optimized process window should allow at least +/-10% adjustment margin on all key parameters, so minor fluctuations in factory ambient temperature during summer or winter production will not cause part defects. The cooling time should be extended by 3 seconds from the minimum viable time, even if it adds a small amount to cycle time, as this will reduce post-molding warpage by more than 70% and eliminate the need for secondary fixture cooling that takes extra days to complete.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#suggestedAnswer-6",
            "datePublished": "2026-09-19T01:13:45Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Define defect classification for your adapter parts clearly before production starts, separating all potential non-conformities into critical, major and minor levels. Critical defects include dimensional deviation over the allowed tolerance that blocks full assembly, and sharp burrs on the port edge that can damage user USB devices; any part with a critical defect is 100% rejected. Major defects include inconsistent matte surface texture that does not match the golden sample, and warpage that is more than 0.1mm; the allowed maximum major defect rate for sample batches is 0%. IQC incoming inspection for raw resin material should include a melt flow index test for every batch, to confirm it matches the specified grade requirements, avoiding raw material variation that causes unexpected shrinkage. If any defect is found during production, an 8D corrective action report must be submitted within 48 hours, with root cause analysis, immediate containment action, and long term preventive measure clearly documented.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#suggestedAnswer-7",
            "datePublished": "2026-09-19T01:12:11Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "All adapter parts you receive from the supplier should be validated under real assembly conditions, using your exact ultrasonic welding equipment and USB connector plugs to test fit, rather than only checking 2D drawings for dimensional accuracy. Even parts that meet all drawing tolerances can have minor unaccounted for draft angle or surface finish issues that cause assembly failure on your specific production line. The assembled adapter units should also go through a 1.5m drop test onto concrete surface from 6 different orientations, to confirm the plastic shell will not crack or separate after impact, which is a common hidden failure mode for thin wall consumer electronics adapter parts. The parts should also be tested for color fastness after 72 hours of exposure to 60 degree high temperature environment, to make sure the matte outer surface does not fade or change color before the end of the product’s expected 3 year service life.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#suggestedAnswer-8",
            "datePublished": "2026-09-19T01:09:57Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For 65W consumer electronics adapter housings, the standard PC+ABS blend grade with 10% glass fiber filler offers the best balance of impact resistance, heat resistance, and flowability for thin wall molding applications. You do not need to specify a high end PC grade with 20% glass fiber content, as that will increase material cost by 35% and also make it harder to get a uniform matte surface finish. If you plan to produce adapter units for EU market sale, confirm the selected resin grade meets UL 94 V-0 flammability standard, without adding extra flame retardant additives that can cause the surface finish to become glossy instead of matte. For the internal metal mounting brackets, using SPCC cold rolled steel with 0.8mm thickness offers enough structural support, and costs 40% less than using 304 stainless steel for non-corrosion exposed areas. All selected material grades should come with full material safety data sheets and formal certification documents, to support your product’s market compliance checks later.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-reliable-oem-consumer-electronics-adapter-supplier.html#suggestedAnswer-9",
            "datePublished": "2026-09-19T01:05:03Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.jaterson.com/qa/oem-odm/"}          ,{"@type": "ListItem", "position": 4, "name": "How to select a reliable adapter for consumer electronics supplier for OEM projects?"}
      ]
    }
]
```