title: "How to select heavy-duty custom metal fittings for high load industrial applications?"
description: "Procurement teams sourcing heavy-duty custom metal fittings for high-load equipment often struggle to compare suppliers, balance cost, lead time and avoid unqualified parts that cause costly unplanned downtime. This practical framework breaks down quotation evaluation, material verification, and supplier qualification workflows to cut procurement risks and ensure parts match long-term performance requirements."
url: "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html"
language: "en"
type: "Q&A"
category: "General Manufacturing Q&A"
datePublished: "2026-09-10"
dateModified: "2026-09-10"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# How to select heavy-duty custom metal fittings for high load industrial applications?

## Question

 I am a supply chain manager in charge of mold procurement, currently evaluating 4 potential suppliers for a batch of heavy-duty custom metal fittings that will be installed on 120-ton injection mold clamping units, each fitting needs to withstand 180kN cyclic shear load for over 1 million working cycles without deformation or fracture. Two of the suppliers quoted prices 32% lower than the other two, but they could not provide full load test reports for previous similar parts, and their stated MOQ is 800 units while our first trial order only needs 220 units. I have been stuck for a week because if I pick the low-price ones, there is a huge risk of on-site part failure that will cause unplanned downtime of our end customer’s production line, which costs more than $15,000 per hour. If I pick the higher-priced suppliers, my procurement budget for this quarter will exceed 18% and I need to provide clear justification to the management. I need a practical, actionable framework to evaluate these options, avoid purchasing mistakes, and get a fair balance between cost, lead time and performance. 

## Answers
                            
### Answer 1 — Best Answer

First, anchor your core non-negotiable requirements before comparing any quotations. The heavy-duty custom metal fittings for 120-ton clamping units have a clear performance red line: 180kN cyclic shear load over 1 million cycles, no permanent deformation. Any part that fails this standard will directly cause mold shift, flash on injection molded parts, and even safety hazards on the production floor. The first step to filter all supplier options is to eliminate any vendor that cannot provide third-party mechanical test reports matching your exact load and cycle parameters, for parts with the same or similar cross-sectional design you are requesting. Do not accept generic material test reports for raw steel, as that does not account for forging, heat treatment, and machining residual stress that directly impact final part performance.

Second, break down the quotation difference to find hidden cost factors that are often omitted by low-price bidders. The 32% lower quotation gap you see almost always comes from one or more of these adjustments: using hot-rolled steel without full stress relief instead of normalized forged steel, skipping the 3-cycle low temperature tempering process after quenching, using standard tolerance machining instead of the IT7 tolerance required for fitting mounting holes, or skipping 100% load sampling testing before shipment. **The actual hidden failure cost of a single bad fitting is at least 120 times the unit price difference between high and low quotations**, so cutting corners on these processes is never worth the risk. For your 220 unit trial order, the higher MOQ requirement from low-price suppliers is usually a sign they run standard part production only, and cannot switch their machining lines to small batch custom runs without disrupting their existing mass production schedule, which means your order will likely be deprioritized if any larger client places an urgent order.

Third, establish a clear 3-step supplier qualification workflow to make your procurement decision and justify it to management. First, shortlist 2 suppliers from the higher-priced group, and request 5 free sample parts from each for independent third-party load testing, the total cost of this testing will be less than 0.5% of your total order value. Second, negotiate with the shortlisted suppliers to adjust the unit price for the first 220 trial units by 7-10% in exchange for a 12-month forecast of total 1200 units of repeat orders, most qualified hardware manufacturing shops will accept this term to lock in long-term stable business. **The qualified lead time for this type of heavy-duty custom metal fittings for small batch runs should be 18-22 working days**, any supplier that promises delivery less than 14 days is almost certainly skipping necessary heat treatment holding time. **You can reserve 15% of the total budget as a performance holdback, to be paid 30 days after all parts pass your on-site installation load test**, this clause will push all suppliers to fully comply with your quality requirements, and give you full leverage if any non-conformance issues show up. At the end of this process, you will have clear documented test data, negotiated cost that is within 5% of your initial budget, and full protection against unexpected performance risks, so you can present a fully justified report to management without any vague assumptions.

**status:** accepted
**Author:** Jason Zhou
**Date:** 2026-09-10

### Answer 2

All heavy-duty custom metal fittings for clamping unit applications have a direct interaction with mating mounting surfaces and locating pins on the mold base. Even if the bulk material meets load requirements, any mismatch in perpendicularity between the fitting mounting face and the pin hole will create uneven load distribution, making the actual load on a single point 3 times higher than the designed 180kN rating.

Before running full order production, you should ask the supplier to provide CMM inspection reports for 3 critical dimensions: locating pin hole position tolerance, mounting face flatness, and overall part perpendicularity. Parts that fail these geometric tolerance checks will still break under rated load even if the material hardness and strength meet all published standards. It is also recommended to run a 72-hour continuous on-site trial with the sample parts installed on your existing 120-ton machine, to collect real operation performance data instead of only relying on lab test results.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-10

### Answer 3

The residual stress left inside heavy-duty custom metal fittings after machining is one of the most common hidden failure causes that no raw material test can catch. Suppliers that use high speed feed rates on CNC machining centers without subsequent stress relief will leave micro cracks on the part shearing surface, which are not visible under normal visual inspection, but will expand rapidly after 200,000 to 300,000 load cycles and cause sudden fracture.

All qualified parts for this high cycle load application must go through a vibratory stress relief process after finish machining, to eliminate 90% or more of the internal residual stress from cutting. You can ask each supplier to provide process records showing the exact duration and frequency of the stress relief step for your specific batch, and confirm that no parts from the batch skip this process to shorten lead time.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-10

### Answer 4

When you install 8 of these heavy-duty custom metal fittings on a single mold platen, the cumulative tolerance of all fitting mounting positions directly affects the parallelism of the entire clamping platen movement. If the total tolerance stack up exceeds 0.08mm across the platen, the clamping force will not be distributed evenly across the entire mold parting surface, leading to unbalanced wear on all 8 fittings and earlier than expected failure.

All custom fitting designs should have their tolerance values optimized for cumulative assembly, rather than setting each individual dimension to the loosest possible acceptable standard. Before finalizing the order, you can share your full mold platen CAD file with the supplier engineering team, and ask them to run a full tolerance stack simulation for the assembly, to confirm that all dimension settings are compatible with your existing assembly process, and no fit issues will appear during mass installation.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-10

### Answer 5

The forging die used to produce the blank of your heavy-duty custom metal fittings directly determines the internal grain flow structure of the final part. Suppliers that use old, worn forging dies over 5000 strokes past their service life will produce parts with interrupted grain flow at the high shear area, which reduces the part fatigue resistance by more than 40% even if the material chemical composition is 100% correct.

You can ask the supplier to provide the last maintenance date and total production stroke count of the forging die that will be used to produce your batch. If they plan to use a shared public die that has been used for hundreds of different client parts, there is a very high risk of inconsistent part performance across different units of your order. Dedicating a new or fully reconditioned forging die for your batch will increase the unit cost by around 7%, but it eliminates almost all unexpected fatigue failure risks.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-10

### Answer 6

The steel grade selection for heavy-duty custom metal fittings should not be picked based on maximum static strength alone. For applications that require over 1 million cyclic shear loads, 42CrMo alloy steel with quenching hardness controlled between HRC 48 to HRC 52 provides the best balance of strength, toughness and impact resistance. Many low cost suppliers use ordinary 45# carbon steel with surface induction hardening to cut material cost, but the core of the part remains soft, which will slowly deform under repeated cyclic load after 300,000 cycles.

You can ask the supplier to provide batch material mill certificates that show the exact alloy composition, and confirm that the hardening depth is at least 3mm at the high shear cross section. The total expected service life of the qualified part should be at least 1.5 million cycles, which reduces your annual spare part replacement cost by more than 60%.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-10

### Answer 7

Many original part designs for heavy-duty custom metal fittings include sharp internal corners at the transition between the shearing face and the mounting face, which creates a natural stress concentration point that will fracture under repeated cyclic load even if all other material and process parameters are fully compliant. Adding a 2mm to 3mm radius on all internal sharp corners reduces the local stress concentration by more than 60%, and does not affect any of the existing assembly or functional performance of the part.

You can ask each supplier to provide DFM feedback for your existing part design, any vendor that does not point out this obvious stress concentration issue without your prompting is very likely to lack sufficient experience in high load custom metal fitting production. Modifying this small design detail will not add any extra cost, but can extend the average service life of the part by more than 2 times.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-09-10

### Answer 8

For this type of high criticality custom metal fitting order, it is important to break the entire production timeline into 5 clear checkpoints that require formal sign off before the supplier moves to the next step. The checkpoints in order are raw material incoming inspection, forging blank inspection, post heat treatment hardness test, finish machining dimension verification, and final batch load sampling test.

If any checkpoint fails, the supplier has to resolve the non-conformance before proceeding, instead of finishing all production first and then waiting for your inspection. Any change to the process, material or timeline after the order is confirmed must be documented in a formal change notice, and the impact on part performance has to be evaluated by both engineering teams before the change is approved. This step by step sign off mechanism avoids most unexpected delays and quality issues that show up at the very end of production.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-10

### Answer 9

Establish a clear non-conformance acceptance limit for heavy-duty custom metal fittings before production starts, to avoid unnecessary rejection of qualified parts or passing of defective units. For IQC, all incoming raw steel bars must have alloy composition deviation below 0.05% for key elements chromium and molybdenum.

For IPQC, 2 parts per every 50 units must be tested for hardness across the full cross section to confirm hardening depth meets requirement. For OQC, at least 2 units from every batch of 100 parts must go through full 1.2x rated load 10,000 cycle impact test, no crack or deformation is allowed after testing.

All inspection data for every batch must be provided together with the shipping documents, and any part that lacks matching inspection records should be treated as unqualified and rejected directly. This multi level inspection system reduces the risk of defective parts being sent to your site to below 0.2%.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-10

## Related Resources

- [General Manufacturing Q&A](https://www.jaterson.com/qa/general-manufacturing/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to select heavy-duty custom metal fittings for high load industrial applications?",
        "text": "I am a supply chain manager in charge of mold procurement, currently evaluating 4 potential suppliers for a batch of heavy-duty custom metal fittings that will be installed on 120-ton injection mold clamping units, each fitting needs to withstand 180kN cyclic shear load for over 1 million working cycles without deformation or fracture. Two of the suppliers quoted prices 32% lower than the other two, but they could not provide full load test reports for previous similar parts, and their stated MOQ is 800 units while our first trial order only needs 220 units. I have been stuck for a week because if I pick the low-price ones, there is a huge risk of on-site part failure that will cause unplanned downtime of our end customer’s production line, which costs more than $15,000 per hour. If I pick the higher-priced suppliers, my procurement budget for this quarter will exceed 18% and I need to provide clear justification to the management. I need a practical, actionable framework to evaluate these options, avoid purchasing mistakes, and get a fair balance between cost, lead time and performance.",
        "answerCount": 9,
        "upvoteCount": 6,
        "datePublished": "2026-09-10T07:29:19Z",
        "dateModified": "2026-09-10T07:32:48Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "First, anchor your core non-negotiable requirements before comparing any quotations. The heavy-duty custom metal fittings for 120-ton clamping units have a clear performance red line: 180kN cyclic shear load over 1 million cycles, no permanent deformation. Any part that fails this standard will directly cause mold shift, flash on injection molded parts, and even safety hazards on the production floor. The first step to filter all supplier options is to eliminate any vendor that cannot provide third-party mechanical test reports matching your exact load and cycle parameters, for parts with the same or similar cross-sectional design you are requesting. Do not accept generic material test reports for raw steel, as that does not account for forging, heat treatment, and machining residual stress that directly impact final part performance. Second, break down the quotation difference to find hidden cost factors that are often omitted by low-price bidders. The 32% lower quotation gap you see almost always comes from one or more of these adjustments: using hot-rolled steel without full stress relief instead of normalized forged steel, skipping the 3-cycle low temperature tempering process after quenching, using standard tolerance machining instead of the IT7 tolerance required for fitting mounting holes, or skipping 100% load sampling testing before shipment. The actual hidden failure cost of a single bad fitting is at least 120 times the unit price difference between high and low quotations , so cutting corners on these processes is never worth the risk. For your 220 unit trial order, the higher MOQ requirement from low-price suppliers is usually a sign they run standard part production only, and cannot switch their machining lines to small batch custom runs without disrupting their existing mass production schedule, which means your order will likely be deprioritized if any larger client places an urgent order. Third, establish a clear 3-step supplier qualification workflow to make your procurement decision and justify it to management. First, shortlist 2 suppliers from the higher-priced group, and request 5 free sample parts from each for independent third-party load testing, the total cost of this testing will be less than 0.5% of your total order value. Second, negotiate with the shortlisted suppliers to adjust the unit price for the first 220 trial units by 7-10% in exchange for a 12-month forecast of total 1200 units of repeat orders, most qualified hardware manufacturing shops will accept this term to lock in long-term stable business. The qualified lead time for this type of heavy-duty custom metal fittings for small batch runs should be 18-22 working days , any supplier that promises delivery less than 14 days is almost certainly skipping necessary heat treatment holding time. You can reserve 15% of the total budget as a performance holdback, to be paid 30 days after all parts pass your on-site installation load test , this clause will push all suppliers to fully comply with your quality requirements, and give you full leverage if any non-conformance issues show up. At the end of this process, you will have clear documented test data, negotiated cost that is within 5% of your initial budget, and full protection against unexpected performance risks, so you can present a fully justified report to management without any vague assumptions.",
            "upvoteCount": 6,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#acceptedAnswer",
            "datePublished": "2026-09-10T08:54:03Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "All heavy-duty custom metal fittings for clamping unit applications have a direct interaction with mating mounting surfaces and locating pins on the mold base. Even if the bulk material meets load requirements, any mismatch in perpendicularity between the fitting mounting face and the pin hole will create uneven load distribution, making the actual load on a single point 3 times higher than the designed 180kN rating. Before running full order production, you should ask the supplier to provide CMM inspection reports for 3 critical dimensions: locating pin hole position tolerance, mounting face flatness, and overall part perpendicularity. Parts that fail these geometric tolerance checks will still break under rated load even if the material hardness and strength meet all published standards. It is also recommended to run a 72-hour continuous on-site trial with the sample parts installed on your existing 120-ton machine, to collect real operation performance data instead of only relying on lab test results.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#suggestedAnswer-2",
            "datePublished": "2026-09-10T08:40:34Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The residual stress left inside heavy-duty custom metal fittings after machining is one of the most common hidden failure causes that no raw material test can catch. Suppliers that use high speed feed rates on CNC machining centers without subsequent stress relief will leave micro cracks on the part shearing surface, which are not visible under normal visual inspection, but will expand rapidly after 200,000 to 300,000 load cycles and cause sudden fracture. All qualified parts for this high cycle load application must go through a vibratory stress relief process after finish machining, to eliminate 90% or more of the internal residual stress from cutting. You can ask each supplier to provide process records showing the exact duration and frequency of the stress relief step for your specific batch, and confirm that no parts from the batch skip this process to shorten lead time.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#suggestedAnswer-3",
            "datePublished": "2026-09-10T08:35:08Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When you install 8 of these heavy-duty custom metal fittings on a single mold platen, the cumulative tolerance of all fitting mounting positions directly affects the parallelism of the entire clamping platen movement. If the total tolerance stack up exceeds 0.08mm across the platen, the clamping force will not be distributed evenly across the entire mold parting surface, leading to unbalanced wear on all 8 fittings and earlier than expected failure. All custom fitting designs should have their tolerance values optimized for cumulative assembly, rather than setting each individual dimension to the loosest possible acceptable standard. Before finalizing the order, you can share your full mold platen CAD file with the supplier engineering team, and ask them to run a full tolerance stack simulation for the assembly, to confirm that all dimension settings are compatible with your existing assembly process, and no fit issues will appear during mass installation.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#suggestedAnswer-4",
            "datePublished": "2026-09-10T08:33:06Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The forging die used to produce the blank of your heavy-duty custom metal fittings directly determines the internal grain flow structure of the final part. Suppliers that use old, worn forging dies over 5000 strokes past their service life will produce parts with interrupted grain flow at the high shear area, which reduces the part fatigue resistance by more than 40% even if the material chemical composition is 100% correct. You can ask the supplier to provide the last maintenance date and total production stroke count of the forging die that will be used to produce your batch. If they plan to use a shared public die that has been used for hundreds of different client parts, there is a very high risk of inconsistent part performance across different units of your order. Dedicating a new or fully reconditioned forging die for your batch will increase the unit cost by around 7%, but it eliminates almost all unexpected fatigue failure risks.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#suggestedAnswer-5",
            "datePublished": "2026-09-10T08:30:40Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The steel grade selection for heavy-duty custom metal fittings should not be picked based on maximum static strength alone. For applications that require over 1 million cyclic shear loads, 42CrMo alloy steel with quenching hardness controlled between HRC 48 to HRC 52 provides the best balance of strength, toughness and impact resistance. Many low cost suppliers use ordinary 45# carbon steel with surface induction hardening to cut material cost, but the core of the part remains soft, which will slowly deform under repeated cyclic load after 300,000 cycles. You can ask the supplier to provide batch material mill certificates that show the exact alloy composition, and confirm that the hardening depth is at least 3mm at the high shear cross section. The total expected service life of the qualified part should be at least 1.5 million cycles, which reduces your annual spare part replacement cost by more than 60%.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#suggestedAnswer-6",
            "datePublished": "2026-09-10T08:19:14Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Many original part designs for heavy-duty custom metal fittings include sharp internal corners at the transition between the shearing face and the mounting face, which creates a natural stress concentration point that will fracture under repeated cyclic load even if all other material and process parameters are fully compliant. Adding a 2mm to 3mm radius on all internal sharp corners reduces the local stress concentration by more than 60%, and does not affect any of the existing assembly or functional performance of the part. You can ask each supplier to provide DFM feedback for your existing part design, any vendor that does not point out this obvious stress concentration issue without your prompting is very likely to lack sufficient experience in high load custom metal fitting production. Modifying this small design detail will not add any extra cost, but can extend the average service life of the part by more than 2 times.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#suggestedAnswer-7",
            "datePublished": "2026-09-10T08:11:18Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For this type of high criticality custom metal fitting order, it is important to break the entire production timeline into 5 clear checkpoints that require formal sign off before the supplier moves to the next step. The checkpoints in order are raw material incoming inspection, forging blank inspection, post heat treatment hardness test, finish machining dimension verification, and final batch load sampling test. If any checkpoint fails, the supplier has to resolve the non-conformance before proceeding, instead of finishing all production first and then waiting for your inspection. Any change to the process, material or timeline after the order is confirmed must be documented in a formal change notice, and the impact on part performance has to be evaluated by both engineering teams before the change is approved. This step by step sign off mechanism avoids most unexpected delays and quality issues that show up at the very end of production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#suggestedAnswer-8",
            "datePublished": "2026-09-10T07:41:53Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Establish a clear non-conformance acceptance limit for heavy-duty custom metal fittings before production starts, to avoid unnecessary rejection of qualified parts or passing of defective units. For IQC, all incoming raw steel bars must have alloy composition deviation below 0.05% for key elements chromium and molybdenum. For IPQC, 2 parts per every 50 units must be tested for hardness across the full cross section to confirm hardening depth meets requirement. For OQC, at least 2 units from every batch of 100 parts must go through full 1.2x rated load 10,000 cycle impact test, no crack or deformation is allowed after testing. All inspection data for every batch must be provided together with the shipping documents, and any part that lacks matching inspection records should be treated as unqualified and rejected directly. This multi level inspection system reduces the risk of defective parts being sent to your site to below 0.2%.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-heavy-duty-custom-metal-fittings-high-load-industrial-applications.html#suggestedAnswer-9",
            "datePublished": "2026-09-10T07:32:48Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "General Manufacturing Q&A", "item": "https://www.jaterson.com/qa/general-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "How to select heavy-duty custom metal fittings for high load industrial applications?"}
      ]
    }
]
```