title: "How to select fasteners for plastic assemblies to prevent thread failure?"
description: "Facing loose lids and stripped threads in plastic enclosures, this analysis provides a step-by-step fastener selection framework focusing on torque-tension testing, material pairing, and supplier quality control to ensure reliable assembly."
url: "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html"
language: "en"
type: "Q&A"
category: "Hardware Manufacturing Q&A"
datePublished: "2026-09-17"
dateModified: "2026-09-17"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# How to select fasteners for plastic assemblies to prevent thread failure?

## Question

 I'm the quality engineer responsible for a line of outdoor electrical enclosures. We've been battling inconsistent clamping force and occasional thread stripping on the screws that secure the polycarbonate lid to the base. The issue emerged after two changes: switching to a cost-optimized zinc-plated steel screw supplier and introducing a recycled resin blend. Now, we see loose lids at final inspection and field returns with stripped brass inserts. Production has tried adjusting the assembly torque, but higher settings crack the plastic around the inserts, and lower settings don't provide a seal. The sporadic nature makes it hard to pinpoint the cause. I'm under pressure to approve shipments but can't ignore the failure risk. I need a concrete, actionable framework to evaluate and select fasteners and fixtures that will perform reliably across temperature cycles (-20°C to 60°C) and resist vibration. What steps should I take to validate the components, and what key specifications—like thread form, plating, torque-tension relationship, and corrosion resistance—are non-negotiable for a robust selection? 

## Answers
                            
### Answer 1 — Best Answer

The core problem you're facing—inconsistent clamping and thread failure—is a classic symptom of misaligned specifications between the fastener, the host material, and the assembly process. It's not just a "bad batch" of screws; it's a system issue. The shift to a new supplier and a different resin grade introduced multiple variables that likely interact negatively. The immediate priority is to stop the trial-and-error torque adjustments and start a structured root cause analysis.

The first step is to isolate the variables. Obtain samples of the old and new screws, as well as material plaques from the old and new resin blends. Key dimensional checks on the screws should include thread pitch, major/minor diameter, and crest radius. For the brass inserts, measure the internal thread geometry and pull-out strength when molded into both resin types. A significant finding is often that cost-optimized fasteners have looser thread tolerances or a sharper crest, which acts like a cutting tool in plastic. The recycled resin may have lower tensile strength or greater variability, reducing the strength of the boss.

Next, establish the actual performance window. This requires a torque-tension test. You need to determine the clamp force generated at a given torque for your specific combination. The goal is to identify the **target torque that achieves 70-80% of the fastener's proof load** while staying below the yield strength of the plastic boss. This test will reveal if your current torque setting is even in the feasible range. It will also show the friction coefficients (head and thread) which are heavily influenced by plating. Zinc plating can be inconsistent, leading to high friction and low clamp force for the same torque.

Environmental validation is crucial. Subject assembled samples to thermal cycling and vibration per your end-use conditions. Monitor for clamp force loss (using ultrasonic tension meters) and inspect for stress cracking. Differential thermal expansion between steel, brass, and polycarbonate is a major driver of stress. This may necessitate a change in material pairing—for instance, using stainless steel screws (lower thermal conductivity) or a plastic with higher heat deflection temperature.

From a supplier management standpoint, your new fastener specification must be non-negotiable. It should call out the required mechanical grade (e.g., ISO 898-1 Class 8.8), a controlled plating type and thickness (e.g, clear chromate conversion coating for corrosion resistance), and a mandatory certificate of conformance with batch traceability. For the inserts, specify a minimum pull-out and torque-out strength. Implement incoming inspection with simple go/no-go thread gauges and periodic destructive testing.

Finally, prevent recurrence by locking down the approved combination. Update your design files with the exact fastener part number, the specified installation torque (with a tolerance, e.g., 2.5 Nm ±0.2 Nm), and the tool setting. Train assembly operators and audit torque tools daily. Consider design alternatives for future revisions, such as through-boss designs with a nut on the backside for higher loads, or integrated snap-fits for lower-cost, non-serviceable joints. The goal is to move from reactive problem-solving to a validated, controlled system.

**status:** accepted
**Author:** Eric Zhao
**Date:** 2026-09-17

### Answer 2

From a production line standpoint, the choice of fastener directly impacts throughput and consistency. For high-volume assembly, prioritize fasteners with features that enable error-proofing and speed. Screws with uniform thread geometry and consistent head drive (e.g., Pozidriv vs. Phillips) reduce misdrives and cam-out, minimizing stoppages. Consider the feeding mechanism: for automated screwdriving, the fastener length, head diameter, and presence of a washer must be within tight tolerances to prevent jamming in vibratory bowls.

The total cycle time isn't just the driving time; it includes handling and any rework. A slightly more expensive screw with a proprietary coating that guarantees consistent friction can eliminate post-torque verification steps, netting a faster overall line. Always run a small batch pilot on the actual assembly line before full commitment to validate feedability and driving performance.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-17

### Answer 3

The design of the plastic component hosting the fastener is often the root of quality issues. When selecting a fastener, you must first evaluate the boss design. A common mistake is undersized boss outer diameter, leading to insufficient hoop strength and cracking. As a rule, the boss OD should be at least 2.5 times the screw's major diameter. The boss should have a generous draft (typically 1° per side) and adequate radius at the base to avoid stress concentration.

For threaded inserts, the design must account for sink marks over the insert; this may require local wall thickening. If using self-tapping screws, the pilot hole diameter is critical—too small causes high stress, too large reduces thread engagement. Provide your fastener supplier with a 3D model of the boss and pilot hole for their recommendation. A good DFM review can prevent field failures more effectively than inspecting finished parts.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-09-17

### Answer 4

As a quality professional, you need to translate the functional requirement into measurable inspection criteria. For incoming fasteners, define an AQL sampling plan checking critical dimensions: head height, drive size, thread pitch, and major diameter. Use attribute gauging for speed.

For the installed joint, the key process characteristic is clamp force, but it's destructive to measure. Therefore, control the input torque and monitor output via定期 torque audits on finished units using a calibrated torque wrench set to the breakaway value. Establish clear defect classifications: a stripped thread is critical, a loose screw is major.

Implement a corrective action loop: any lot with a critical defect triggers a supplier 8D report. For long-term reliability, create a test plan that subjects samples to combined thermal and vibration stress, then performs a destructive pull test to establish a safety margin versus the specification.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-17

### Answer 5

The injection molding process parameters significantly affect the integrity of the plastic features that receive fasteners. If the brass insert is molded-in, the melt temperature, injection speed, and packing pressure must be optimized to ensure the plastic fully flows around the insert's knurls without inducing excessive residual stress. High stress around the insert can lead to stress cracking when the screw is torqued.

For bosses, insufficient packing can cause voids or sinks, weakening the structure. Process window studies should be conducted to find settings that produce consistent part weight and dimensions, especially in the boss area. Monitor the process for drift, as a change in material viscosity (common with recycled content) can require parameter adjustments. A stable, capable molding process is a prerequisite for consistent fastener performance.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-17

### Answer 6

Mold design decisions have a long-lasting impact on fastener joint reliability. The gate location must be chosen to ensure uniform filling and packing of the boss. A gate directly opposite the boss can cause a weld line at its base, a severe weak point. Cooling is paramount: the boss core must be efficiently cooled to minimize cycle time and prevent sinks. Consider using a conformal cooling channel or a dedicated baffle in the boss area.

For threaded features, the decision between a molded-in thread (using an unscrewing mechanism) and a post-molded insert affects tool cost and part strength. Molded threads are weaker and wear over time. If using inserts, the mold must have precise pins to locate them; any misalignment causes cross-threading. The mold must also be vented adequately near bosses to avoid gas traps that cause burns or short shots.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-17

### Answer 7

Managing fastener selection from a project perspective requires strict phase-gate control. During the prototyping phase, source fasteners from the intended volume supplier for testing. At the EVT (Engineering Validation Test) milestone, complete the torque-tension and environmental testing to freeze the specification. Any change after this point, including a cost-reduction supplier switch, must go through a formal change order process evaluating risk.

During production transfer, ensure the supplier has completed a Production Part Approval Process (PPAP) package, including a Process Failure Mode and Effects Analysis (PFMEA) for their manufacturing. Coordinate with procurement to secure inventory for pilot runs, avoiding last-minute substitutions. Clear communication of the approved vendor list (AVL) and the locked specifications to all stakeholders is essential to prevent unauthorized changes that derail quality.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-17

### Answer 8

Material pairing is a fundamental engineering decision. For your outdoor enclosure, you must consider the galvanic series to prevent bimetallic corrosion. Zinc-plated steel against brass in a humid environment can accelerate corrosion.

A more compatible coating like zinc-nickel or a switch to stainless steel might be necessary. The plastic's creep behavior is critical: under constant load, the plastic will relax, causing clamp force loss. A plastic with a higher creep modulus (like a glass-filled material) or a design that uses a spring washer can compensate.

The coefficient of thermal expansion (CTE) mismatch is a key driver of stress. Calculate the theoretical stress induced over your temperature range. If it's too high, the solution may be to change the fastener material to one with a CTE closer to plastic, such as a specific engineering polymer screw, or to redesign the joint to allow for movement.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-17

### Answer 9

Sustained quality improvement requires treating the fastener assembly as a process with measurable inputs and outputs. Start by collecting data on defect rates per shift, correlated with fastener lot number and molding machine. Use Pareto analysis to identify the top failure modes.

Implement simple poka-yoke (error-proofing) on the line: for example, a sensor that verifies screw presence before the lid is closed, or a torque driver that signals only when the correct torque is achieved. Standardize the work instructions with clear visuals.

Conduct capability studies on the torque process (Cpk) to ensure it is statistically controlled. The goal is to move from detection to prevention. A lean approach would involve working with the fastener supplier to implement kanban delivery and joint quality checks, reducing inventory and improving response time to any quality drift.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-17

## Related Resources

- [Hardware Manufacturing Q&A](https://www.jaterson.com/qa/hardware-manufacturing/)
- [Hardware Components](https://www.jaterson.com/products/hardware-components/)
- [Hardware Manufacturing](https://www.jaterson.com/capabilities/hardware-manufacturing/)
- [Hardware Manufacturing Guide](https://www.jaterson.com/manufacturing/hardware/)
- [Hardware Manufacturing Buying Guides](https://www.jaterson.com/buying/hardware/)
- [Hardware Tool Handles](https://www.jaterson.com/injection-molding-for-hardware-tool-handles/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Hardware & Tool Parts](https://www.jaterson.com/knowledge/hardware-tool-parts/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to select fasteners for plastic assemblies to prevent thread failure?",
        "text": "I&#039;m the quality engineer responsible for a line of outdoor electrical enclosures. We&#039;ve been battling inconsistent clamping force and occasional thread stripping on the screws that secure the polycarbonate lid to the base. The issue emerged after two changes: switching to a cost-optimized zinc-plated steel screw supplier and introducing a recycled resin blend. Now, we see loose lids at final inspection and field returns with stripped brass inserts. Production has tried adjusting the assembly torque, but higher settings crack the plastic around the inserts, and lower settings don&#039;t provide a seal. The sporadic nature makes it hard to pinpoint the cause. I&#039;m under pressure to approve shipments but can&#039;t ignore the failure risk. I need a concrete, actionable framework to evaluate and select fasteners and fixtures that will perform reliably across temperature cycles (-20°C to 60°C) and resist vibration. What steps should I take to validate the components, and what key specifications—like thread form, plating, torque-tension relationship, and corrosion resistance—are non-negotiable for a robust selection?",
        "answerCount": 9,
        "upvoteCount": 13,
        "datePublished": "2026-09-17T07:06:53Z",
        "dateModified": "2026-09-17T07:11:41Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The core problem you&#039;re facing—inconsistent clamping and thread failure—is a classic symptom of misaligned specifications between the fastener, the host material, and the assembly process. It&#039;s not just a &quot;bad batch&quot; of screws; it&#039;s a system issue. The shift to a new supplier and a different resin grade introduced multiple variables that likely interact negatively. The immediate priority is to stop the trial-and-error torque adjustments and start a structured root cause analysis. The first step is to isolate the variables. Obtain samples of the old and new screws, as well as material plaques from the old and new resin blends. Key dimensional checks on the screws should include thread pitch, major/minor diameter, and crest radius. For the brass inserts, measure the internal thread geometry and pull-out strength when molded into both resin types. A significant finding is often that cost-optimized fasteners have looser thread tolerances or a sharper crest, which acts like a cutting tool in plastic. The recycled resin may have lower tensile strength or greater variability, reducing the strength of the boss. Next, establish the actual performance window. This requires a torque-tension test. You need to determine the clamp force generated at a given torque for your specific combination. The goal is to identify the target torque that achieves 70-80% of the fastener&#039;s proof load while staying below the yield strength of the plastic boss. This test will reveal if your current torque setting is even in the feasible range. It will also show the friction coefficients (head and thread) which are heavily influenced by plating. Zinc plating can be inconsistent, leading to high friction and low clamp force for the same torque. Environmental validation is crucial. Subject assembled samples to thermal cycling and vibration per your end-use conditions. Monitor for clamp force loss (using ultrasonic tension meters) and inspect for stress cracking. Differential thermal expansion between steel, brass, and polycarbonate is a major driver of stress. This may necessitate a change in material pairing—for instance, using stainless steel screws (lower thermal conductivity) or a plastic with higher heat deflection temperature. From a supplier management standpoint, your new fastener specification must be non-negotiable. It should call out the required mechanical grade (e.g., ISO 898-1 Class 8.8), a controlled plating type and thickness (e.g, clear chromate conversion coating for corrosion resistance), and a mandatory certificate of conformance with batch traceability. For the inserts, specify a minimum pull-out and torque-out strength. Implement incoming inspection with simple go/no-go thread gauges and periodic destructive testing. Finally, prevent recurrence by locking down the approved combination. Update your design files with the exact fastener part number, the specified installation torque (with a tolerance, e.g., 2.5 Nm ±0.2 Nm), and the tool setting. Train assembly operators and audit torque tools daily. Consider design alternatives for future revisions, such as through-boss designs with a nut on the backside for higher loads, or integrated snap-fits for lower-cost, non-serviceable joints. The goal is to move from reactive problem-solving to a validated, controlled system.",
            "upvoteCount": 13,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#acceptedAnswer",
            "datePublished": "2026-09-17T09:03:12Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "From a production line standpoint, the choice of fastener directly impacts throughput and consistency. For high-volume assembly, prioritize fasteners with features that enable error-proofing and speed. Screws with uniform thread geometry and consistent head drive (e.g., Pozidriv vs. Phillips) reduce misdrives and cam-out, minimizing stoppages. Consider the feeding mechanism: for automated screwdriving, the fastener length, head diameter, and presence of a washer must be within tight tolerances to prevent jamming in vibratory bowls. The total cycle time isn&#039;t just the driving time; it includes handling and any rework. A slightly more expensive screw with a proprietary coating that guarantees consistent friction can eliminate post-torque verification steps, netting a faster overall line. Always run a small batch pilot on the actual assembly line before full commitment to validate feedability and driving performance.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#suggestedAnswer-2",
            "datePublished": "2026-09-17T08:36:58Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The design of the plastic component hosting the fastener is often the root of quality issues. When selecting a fastener, you must first evaluate the boss design. A common mistake is undersized boss outer diameter, leading to insufficient hoop strength and cracking. As a rule, the boss OD should be at least 2.5 times the screw&#039;s major diameter. The boss should have a generous draft (typically 1° per side) and adequate radius at the base to avoid stress concentration. For threaded inserts, the design must account for sink marks over the insert; this may require local wall thickening. If using self-tapping screws, the pilot hole diameter is critical—too small causes high stress, too large reduces thread engagement. Provide your fastener supplier with a 3D model of the boss and pilot hole for their recommendation. A good DFM review can prevent field failures more effectively than inspecting finished parts.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#suggestedAnswer-3",
            "datePublished": "2026-09-17T08:20:00Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "As a quality professional, you need to translate the functional requirement into measurable inspection criteria. For incoming fasteners, define an AQL sampling plan checking critical dimensions: head height, drive size, thread pitch, and major diameter. Use attribute gauging for speed. For the installed joint, the key process characteristic is clamp force, but it&#039;s destructive to measure. Therefore, control the input torque and monitor output via定期 torque audits on finished units using a calibrated torque wrench set to the breakaway value. Establish clear defect classifications: a stripped thread is critical, a loose screw is major. Implement a corrective action loop: any lot with a critical defect triggers a supplier 8D report. For long-term reliability, create a test plan that subjects samples to combined thermal and vibration stress, then performs a destructive pull test to establish a safety margin versus the specification.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#suggestedAnswer-4",
            "datePublished": "2026-09-17T07:56:49Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The injection molding process parameters significantly affect the integrity of the plastic features that receive fasteners. If the brass insert is molded-in, the melt temperature, injection speed, and packing pressure must be optimized to ensure the plastic fully flows around the insert&#039;s knurls without inducing excessive residual stress. High stress around the insert can lead to stress cracking when the screw is torqued. For bosses, insufficient packing can cause voids or sinks, weakening the structure. Process window studies should be conducted to find settings that produce consistent part weight and dimensions, especially in the boss area. Monitor the process for drift, as a change in material viscosity (common with recycled content) can require parameter adjustments. A stable, capable molding process is a prerequisite for consistent fastener performance.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#suggestedAnswer-5",
            "datePublished": "2026-09-17T07:54:43Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Mold design decisions have a long-lasting impact on fastener joint reliability. The gate location must be chosen to ensure uniform filling and packing of the boss. A gate directly opposite the boss can cause a weld line at its base, a severe weak point. Cooling is paramount: the boss core must be efficiently cooled to minimize cycle time and prevent sinks. Consider using a conformal cooling channel or a dedicated baffle in the boss area. For threaded features, the decision between a molded-in thread (using an unscrewing mechanism) and a post-molded insert affects tool cost and part strength. Molded threads are weaker and wear over time. If using inserts, the mold must have precise pins to locate them; any misalignment causes cross-threading. The mold must also be vented adequately near bosses to avoid gas traps that cause burns or short shots.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#suggestedAnswer-6",
            "datePublished": "2026-09-17T07:42:30Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Managing fastener selection from a project perspective requires strict phase-gate control. During the prototyping phase, source fasteners from the intended volume supplier for testing. At the EVT (Engineering Validation Test) milestone, complete the torque-tension and environmental testing to freeze the specification. Any change after this point, including a cost-reduction supplier switch, must go through a formal change order process evaluating risk. During production transfer, ensure the supplier has completed a Production Part Approval Process (PPAP) package, including a Process Failure Mode and Effects Analysis (PFMEA) for their manufacturing. Coordinate with procurement to secure inventory for pilot runs, avoiding last-minute substitutions. Clear communication of the approved vendor list (AVL) and the locked specifications to all stakeholders is essential to prevent unauthorized changes that derail quality.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#suggestedAnswer-7",
            "datePublished": "2026-09-17T07:21:24Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Material pairing is a fundamental engineering decision. For your outdoor enclosure, you must consider the galvanic series to prevent bimetallic corrosion. Zinc-plated steel against brass in a humid environment can accelerate corrosion. A more compatible coating like zinc-nickel or a switch to stainless steel might be necessary. The plastic&#039;s creep behavior is critical: under constant load, the plastic will relax, causing clamp force loss. A plastic with a higher creep modulus (like a glass-filled material) or a design that uses a spring washer can compensate. The coefficient of thermal expansion (CTE) mismatch is a key driver of stress. Calculate the theoretical stress induced over your temperature range. If it&#039;s too high, the solution may be to change the fastener material to one with a CTE closer to plastic, such as a specific engineering polymer screw, or to redesign the joint to allow for movement.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#suggestedAnswer-8",
            "datePublished": "2026-09-17T07:13:22Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Sustained quality improvement requires treating the fastener assembly as a process with measurable inputs and outputs. Start by collecting data on defect rates per shift, correlated with fastener lot number and molding machine. Use Pareto analysis to identify the top failure modes. Implement simple poka-yoke (error-proofing) on the line: for example, a sensor that verifies screw presence before the lid is closed, or a torque driver that signals only when the correct torque is achieved. Standardize the work instructions with clear visuals. Conduct capability studies on the torque process (Cpk) to ensure it is statistically controlled. The goal is to move from detection to prevention. A lean approach would involve working with the fastener supplier to implement kanban delivery and joint quality checks, reducing inventory and improving response time to any quality drift.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/select-fasteners-plastic-assemblies-prevent-thread-failure.html#suggestedAnswer-9",
            "datePublished": "2026-09-17T07:11:41Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Hardware Manufacturing Q&A", "item": "https://www.jaterson.com/qa/hardware-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "How to select fasteners for plastic assemblies to prevent thread failure?"}
      ]
    }
]
```