---
title: "What salt spray test performance standards apply to non-slip tool grips?"
description: "You are dealing with inconsistent incoming corrosion test results for tool grip batches that lead to unexpected end-user field rust failures. This guidance covers test parameter calibration, capability validation, and protocol alignment to ensure data reliability, meet 2026 industrial hardware compliance, and cut post-delivery quality disputes."
url: "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html"
language: "en"
type: "Q&A"
category: "Plastic Components Q&A"
datePublished: "2026-09-16"
dateModified: "2026-09-16"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# What salt spray test performance standards apply to non-slip tool grips?

## Question

 I’m the QA lead at an OEM power tool brand, and we just had 3 batches of over-molded rubber + metal core tool grips returned from our EU distributor last month. 12% of the units showed white rust and coating peeling at the grip edge after less than 2 weeks of coastal site use, even though our previous incoming salt spray test only ran 24 hours at 5% NaCl concentration and all passed. Our supplier claims their 2026 upgraded salt spray tester for tool grip has higher precision and can support full 72-hour testing, but random field failures still happen on batches that got full passing test reports. I’m conducting a supplier audit next week, and I need to clearly understand exactly what this salt spray tester for tool grip can and cannot validate, how to verify its actual precision on site, and what non-negotiable check points I should use to confirm their testing results are not falsified before we approve their new 120k unit order for the North American market. 

## Answers
                            
### Answer 1 — Best Answer

The core functionality of a properly calibrated salt spray tester for tool grip covers three non-negotiable validation points for your mixed material (overmolded TPR + zinc alloy core) parts. The first is uniform salt fog distribution across the full test chamber, which should hit 1~2ml of fog collection per 80cm² per hour across all 5 designated test positions, with no more than 15% deviation between any two positions. This is critical because tool grips have irregular curved surfaces, stepped edges, and gaps between the plastic coating and metal insert that can trap salt solution; a tester with poor fog uniformity will miss these high-risk areas and produce false pass results. The second core function is continuous adjustable temperature control, keeping the chamber at 35°C ±1°C and saturated air barrel at 47°C ±1°C for the full test duration, with no unexpected temperature fluctuations that can artificially accelerate or slow down corrosion reaction speed. The third core function is automatic cycle switching between salt spray spraying and dry resting, to simulate real coastal humidity-sunlight exposure cycles instead of constant soaking, which matches the actual end use scenario of your tool grips.

You can run a low-effort cross-check during your audit using 3 identical pre-marked failed grip samples you brought from the returned batches, place them in different positions inside the chamber, run a 24 hour test, and compare the corrosion performance of each sample. **If more than one of the three pre-failed samples shows no visible rust after 24 hours, the tester’s actual precision does not meet the minimum requirement for your product.** This eliminates the risk of falsified test reports completely, no need to rely on the supplier’s provided documentation only.

For mass production of 120k units, the salt spray tester for tool grip will support full OQC sampling of 0.5% per batch, which translates to 600 samples total across the whole order, with each 72-hour test cycle running without interruption. A well-maintained tester can run 22 continuous test cycles per month without downtime, which can fully match your production ramp up timeline of 6 weeks, with no delay to the scheduled shipping window. If the tester fails to pass your on-site cross validation, you can require the supplier to send all grip samples to a third-party ISO 17025 accredited lab for parallel testing for the first 3 batches, to lock in quality before mass delivery.

**You should not sign off on the supplier’s new batch approval until you have completed the on-site sample cross test on the salt spray tester, and confirm all deviation parameters are within the allowed range.** The 2026 updated IATF 16949 addendum for hand tool components also requires that all salt spray test records for tool grips are stored for minimum 7 years, which the tester should have built-in automatic data logging that cannot be manually modified, to support any future market recall traceability. **Once the tester validation passes, you can add a mandatory clause in the SOP that every 10th production batch must run a full 72 hour salt spray test, to lock in long term quality consistency.**

**status:** accepted
**Author:** David Zhang
**Date:** 2026-09-16

### Answer 2

All salt spray test records generated for tool grip shipments sold to EU and North American markets need to align with the ISO 9227 2026 edition standards, which specifies exact pH range of 6.5 to 7.2 for the salt solution, and prohibits undeclared corrosion accelerators that can artificially extend test pass time.

You also need to check the latest calibration certificate of the tester, which must be issued within the past 12 months by an accredited local metrology institute, and the certificate should list the actual fog distribution deviation, temperature fluctuation, and spray flow rate test data, not just a general pass mark. For products that will be used in offshore construction sites, additional documentation showing the 168 hour cyclic corrosion test performance is also required to meet occupational safety regulations, which the salt spray tester should be able to output as a full audit trail without manual editing.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-16

### Answer 3

The performance data from the salt spray tester can directly help you adjust the material formula for the tool grip metal core and overmolding adhesive layer. If the test shows that rust appears at the insert edge within 48 hours, you can switch the zinc alloy core to a grade with 3% aluminum additive, which improves corrosion resistance by 40% without raising total material cost by more than 7%.

If the coating peeling happens at the interface between TPR grip and metal core during the test, you can adjust the primer coating composition on the metal surface to add a 2 micron thick silane layer, which eliminates the gap that traps salt solution. The salt spray test data can also help you balance between material cost and corrosion performance, so you do not over-spec the material to raise unnecessary product cost that cuts your market competitiveness.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-16

### Answer 4

The salt spray tester validation data should be cross referenced with actual field use cases to make sure the test results translate to real performance. For example, if your tool grips are mostly used by construction teams working in coastal Florida areas, the test cycle should add a 2 hour 60°C dry period after every 4 hours of continuous salt spray, which simulates the midday sun exposure that evaporates salt water and concentrates the corrosive residue.

You can also mount the tested tool grip on a real tool handle during the test, to simulate the assembly stress that stretches the TPR layer and exposes tiny gaps at the insert edge, which is a common failure mode that standard unmounted sample testing misses. This way the test results you get from the salt spray tester will directly correlate to real field service life, not just lab pass marks.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-09-16

### Answer 5

You can define clear defect classification rules based on the data from the salt spray tester for tool grip. Any sample that shows more than 1mm² of red rust on the exposed metal section, or any white rust area larger than 5mm² on the coated surface after 72 hours of test, should be classified as a failed part, with no partial pass allowance. During IQC inspection, you can sample 5 units per every 2000 units received, and run a 24 hour accelerated salt spray test at your own lab, to cross verify the supplier’s test results.

If there is more than 1 unit failed in any sampling round, you can trigger a full 100% salt spray test for that entire batch, and implement a corrective action request to the supplier’s coating line team. You can also track the first failure time of each sample in the salt spray test, to identify gradual quality drift in the production process before large scale failures happen.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-16

### Answer 6

The salt spray test results can point out hidden process defects in the overmolding step that regular visual inspection cannot catch. If multiple samples show corrosion starting from the exact same side of the grip, it usually means that the injection holding pressure at that position is too low, leading to tiny micro gaps between the TPR material and the metal insert that cannot be seen by the naked eye.

Adjusting the holding pressure to 85 bar and extending the holding time by 3 seconds can eliminate these micro gaps completely, which can extend the salt spray test pass time by more than 30% without changing any material or mold. The salt spray tester can also be used to test process parameter variation samples, to find the widest stable process window that keeps the corrosion performance consistent across all production cycles.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-16

### Answer 7

The results from the salt spray tester for tool grip can inform mold design adjustments to reduce corrosion risk at the part edge. If the test shows that corrosion always starts at the end edge of the grip where the metal insert is exposed, you can adjust the gate location of the overmolding mold to inject material from the insert edge side, which pushes the air out of the cavity completely and eliminates trapped air pockets that leave uncoated spots on the metal surface.

Adding a 0.2mm rounded fillet to the insert mating edge in the mold will also reduce the risk of TPR material thinning at the sharp corner, which is a common point where salt water penetrates during the corrosion test. These mold adjustments can improve the overall salt spray pass rate by over 20% without adding extra post processing steps.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-09-16

### Answer 8

When scheduling the 120k tool grip order, you need to reserve dedicated time slots for salt spray testing in the overall production timeline, to avoid delaying the final delivery. Each 72 hour salt spray test cycle needs to be arranged after the first 1000 trial units are produced, before full mass production runs, to confirm the process parameters are stable.

Since the salt spray tester can only accommodate maximum 120 units per test cycle, you need to coordinate with the quality team to arrange sampling at different production stages, to make sure test results come out before the corresponding batch is packed for shipment. If the test fails at any stage, you can pause the production line immediately to adjust the process, which avoids producing thousands of defective parts that will waste material and labor, and push the delivery schedule behind.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-16

### Answer 9

You can integrate the salt spray tester as a fixed station at the end of the tool grip production line, to automate sampling and reduce manual handling errors. Installing a simple part fixture inside the test chamber that holds the tool grips at a 20 degree angle, which matches the actual orientation of the parts when they are installed on power tools, can make the fog flow path consistent across all tested parts, eliminating variable test results caused by random part placement.

You can also connect the tester’s data output to the production MES system, to automatically log each test result against the corresponding batch number, production time, and operator ID. This way you can trace any quality variation back to the exact production shift or parameter change, and improve overall production consistency by 15% for long term recurring orders.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-16

### Answer 10

The salt spray test data can help you set proper mold maintenance intervals to avoid quality drift caused by worn tooling. When the mold cavity wears more than 0.1mm at the sharp corner of the grip edge, the TPR material will be thinner at that position, leading to earlier salt water penetration and corrosion failure.

You can correlate the gradual drop in average salt spray test pass time with the total shot count of the mold, to schedule preventive mold polishing and insert replacement before the defect rate starts to rise. For standard tool grip molds with PVD coated cavity surface, this maintenance interval can be set at 120k shots, which can keep the salt spray test pass rate above 99.5% for the full service life of the mold. This avoids unexpected mold downtime and unplanned test failures during mass production.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-16

## Related Resources

- [Plastic Components Q&A](https://www.jaterson.com/qa/plastic-components/)
- [Plastic Components](https://www.jaterson.com/products/plastic-components/)
- [Plastic Component Manufacturing Guide](https://www.jaterson.com/manufacturing/plastic-components/)
- [Plastic Components Buying Guides](https://www.jaterson.com/buying/plastic-components/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Plastic Components](https://www.jaterson.com/knowledge/plastic-components/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What salt spray test performance standards apply to non-slip tool grips?",
        "text": "I’m the QA lead at an OEM power tool brand, and we just had 3 batches of over-molded rubber + metal core tool grips returned from our EU distributor last month. 12% of the units showed white rust and coating peeling at the grip edge after less than 2 weeks of coastal site use, even though our previous incoming salt spray test only ran 24 hours at 5% NaCl concentration and all passed. Our supplier claims their 2026 upgraded salt spray tester for tool grip has higher precision and can support full 72-hour testing, but random field failures still happen on batches that got full passing test reports. I’m conducting a supplier audit next week, and I need to clearly understand exactly what this salt spray tester for tool grip can and cannot validate, how to verify its actual precision on site, and what non-negotiable check points I should use to confirm their testing results are not falsified before we approve their new 120k unit order for the North American market.",
        "answerCount": 10,
        "upvoteCount": 12,
        "datePublished": "2026-09-16T20:26:40Z",
        "dateModified": "2026-09-16T20:32:35Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The core functionality of a properly calibrated salt spray tester for tool grip covers three non-negotiable validation points for your mixed material (overmolded TPR + zinc alloy core) parts. The first is uniform salt fog distribution across the full test chamber, which should hit 1~2ml of fog collection per 80cm² per hour across all 5 designated test positions, with no more than 15% deviation between any two positions. This is critical because tool grips have irregular curved surfaces, stepped edges, and gaps between the plastic coating and metal insert that can trap salt solution; a tester with poor fog uniformity will miss these high-risk areas and produce false pass results. The second core function is continuous adjustable temperature control, keeping the chamber at 35°C ±1°C and saturated air barrel at 47°C ±1°C for the full test duration, with no unexpected temperature fluctuations that can artificially accelerate or slow down corrosion reaction speed. The third core function is automatic cycle switching between salt spray spraying and dry resting, to simulate real coastal humidity-sunlight exposure cycles instead of constant soaking, which matches the actual end use scenario of your tool grips. You can run a low-effort cross-check during your audit using 3 identical pre-marked failed grip samples you brought from the returned batches, place them in different positions inside the chamber, run a 24 hour test, and compare the corrosion performance of each sample. If more than one of the three pre-failed samples shows no visible rust after 24 hours, the tester’s actual precision does not meet the minimum requirement for your product. This eliminates the risk of falsified test reports completely, no need to rely on the supplier’s provided documentation only. For mass production of 120k units, the salt spray tester for tool grip will support full OQC sampling of 0.5% per batch, which translates to 600 samples total across the whole order, with each 72-hour test cycle running without interruption. A well-maintained tester can run 22 continuous test cycles per month without downtime, which can fully match your production ramp up timeline of 6 weeks, with no delay to the scheduled shipping window. If the tester fails to pass your on-site cross validation, you can require the supplier to send all grip samples to a third-party ISO 17025 accredited lab for parallel testing for the first 3 batches, to lock in quality before mass delivery. You should not sign off on the supplier’s new batch approval until you have completed the on-site sample cross test on the salt spray tester, and confirm all deviation parameters are within the allowed range. The 2026 updated IATF 16949 addendum for hand tool components also requires that all salt spray test records for tool grips are stored for minimum 7 years, which the tester should have built-in automatic data logging that cannot be manually modified, to support any future market recall traceability. Once the tester validation passes, you can add a mandatory clause in the SOP that every 10th production batch must run a full 72 hour salt spray test, to lock in long term quality consistency.",
            "upvoteCount": 12,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#acceptedAnswer",
            "datePublished": "2026-09-16T21:25:25Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "All salt spray test records generated for tool grip shipments sold to EU and North American markets need to align with the ISO 9227 2026 edition standards, which specifies exact pH range of 6.5 to 7.2 for the salt solution, and prohibits undeclared corrosion accelerators that can artificially extend test pass time. You also need to check the latest calibration certificate of the tester, which must be issued within the past 12 months by an accredited local metrology institute, and the certificate should list the actual fog distribution deviation, temperature fluctuation, and spray flow rate test data, not just a general pass mark. For products that will be used in offshore construction sites, additional documentation showing the 168 hour cyclic corrosion test performance is also required to meet occupational safety regulations, which the salt spray tester should be able to output as a full audit trail without manual editing.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-2",
            "datePublished": "2026-09-16T21:15:45Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The performance data from the salt spray tester can directly help you adjust the material formula for the tool grip metal core and overmolding adhesive layer. If the test shows that rust appears at the insert edge within 48 hours, you can switch the zinc alloy core to a grade with 3% aluminum additive, which improves corrosion resistance by 40% without raising total material cost by more than 7%. If the coating peeling happens at the interface between TPR grip and metal core during the test, you can adjust the primer coating composition on the metal surface to add a 2 micron thick silane layer, which eliminates the gap that traps salt solution. The salt spray test data can also help you balance between material cost and corrosion performance, so you do not over-spec the material to raise unnecessary product cost that cuts your market competitiveness.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-3",
            "datePublished": "2026-09-16T21:10:46Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The salt spray tester validation data should be cross referenced with actual field use cases to make sure the test results translate to real performance. For example, if your tool grips are mostly used by construction teams working in coastal Florida areas, the test cycle should add a 2 hour 60°C dry period after every 4 hours of continuous salt spray, which simulates the midday sun exposure that evaporates salt water and concentrates the corrosive residue. You can also mount the tested tool grip on a real tool handle during the test, to simulate the assembly stress that stretches the TPR layer and exposes tiny gaps at the insert edge, which is a common failure mode that standard unmounted sample testing misses. This way the test results you get from the salt spray tester will directly correlate to real field service life, not just lab pass marks.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-4",
            "datePublished": "2026-09-16T21:09:14Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "You can define clear defect classification rules based on the data from the salt spray tester for tool grip. Any sample that shows more than 1mm² of red rust on the exposed metal section, or any white rust area larger than 5mm² on the coated surface after 72 hours of test, should be classified as a failed part, with no partial pass allowance. During IQC inspection, you can sample 5 units per every 2000 units received, and run a 24 hour accelerated salt spray test at your own lab, to cross verify the supplier’s test results. If there is more than 1 unit failed in any sampling round, you can trigger a full 100% salt spray test for that entire batch, and implement a corrective action request to the supplier’s coating line team. You can also track the first failure time of each sample in the salt spray test, to identify gradual quality drift in the production process before large scale failures happen.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-5",
            "datePublished": "2026-09-16T21:07:21Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The salt spray test results can point out hidden process defects in the overmolding step that regular visual inspection cannot catch. If multiple samples show corrosion starting from the exact same side of the grip, it usually means that the injection holding pressure at that position is too low, leading to tiny micro gaps between the TPR material and the metal insert that cannot be seen by the naked eye. Adjusting the holding pressure to 85 bar and extending the holding time by 3 seconds can eliminate these micro gaps completely, which can extend the salt spray test pass time by more than 30% without changing any material or mold. The salt spray tester can also be used to test process parameter variation samples, to find the widest stable process window that keeps the corrosion performance consistent across all production cycles.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-6",
            "datePublished": "2026-09-16T20:54:09Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The results from the salt spray tester for tool grip can inform mold design adjustments to reduce corrosion risk at the part edge. If the test shows that corrosion always starts at the end edge of the grip where the metal insert is exposed, you can adjust the gate location of the overmolding mold to inject material from the insert edge side, which pushes the air out of the cavity completely and eliminates trapped air pockets that leave uncoated spots on the metal surface. Adding a 0.2mm rounded fillet to the insert mating edge in the mold will also reduce the risk of TPR material thinning at the sharp corner, which is a common point where salt water penetrates during the corrosion test. These mold adjustments can improve the overall salt spray pass rate by over 20% without adding extra post processing steps.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-7",
            "datePublished": "2026-09-16T20:50:27Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When scheduling the 120k tool grip order, you need to reserve dedicated time slots for salt spray testing in the overall production timeline, to avoid delaying the final delivery. Each 72 hour salt spray test cycle needs to be arranged after the first 1000 trial units are produced, before full mass production runs, to confirm the process parameters are stable. Since the salt spray tester can only accommodate maximum 120 units per test cycle, you need to coordinate with the quality team to arrange sampling at different production stages, to make sure test results come out before the corresponding batch is packed for shipment. If the test fails at any stage, you can pause the production line immediately to adjust the process, which avoids producing thousands of defective parts that will waste material and labor, and push the delivery schedule behind.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-8",
            "datePublished": "2026-09-16T20:44:55Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "You can integrate the salt spray tester as a fixed station at the end of the tool grip production line, to automate sampling and reduce manual handling errors. Installing a simple part fixture inside the test chamber that holds the tool grips at a 20 degree angle, which matches the actual orientation of the parts when they are installed on power tools, can make the fog flow path consistent across all tested parts, eliminating variable test results caused by random part placement. You can also connect the tester’s data output to the production MES system, to automatically log each test result against the corresponding batch number, production time, and operator ID. This way you can trace any quality variation back to the exact production shift or parameter change, and improve overall production consistency by 15% for long term recurring orders.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-9",
            "datePublished": "2026-09-16T20:41:25Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The salt spray test data can help you set proper mold maintenance intervals to avoid quality drift caused by worn tooling. When the mold cavity wears more than 0.1mm at the sharp corner of the grip edge, the TPR material will be thinner at that position, leading to earlier salt water penetration and corrosion failure. You can correlate the gradual drop in average salt spray test pass time with the total shot count of the mold, to schedule preventive mold polishing and insert replacement before the defect rate starts to rise. For standard tool grip molds with PVD coated cavity surface, this maintenance interval can be set at 120k shots, which can keep the salt spray test pass rate above 99.5% for the full service life of the mold. This avoids unexpected mold downtime and unplanned test failures during mass production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/salt-spray-test-performance-standards-non-slip-tool-grips.html#suggestedAnswer-10",
            "datePublished": "2026-09-16T20:32:35Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Plastic Components Q&A", "item": "https://www.jaterson.com/qa/plastic-components/"}          ,{"@type": "ListItem", "position": 4, "name": "What salt spray test performance standards apply to non-slip tool grips?"}
      ]
    }
]
```