---
title: "How to Select a Reliable ODM Supplier for Heat-Resistant Home Appliance Housings?"
description: "Struggling to evaluate competing ODM suppliers for heat-resistant home appliance housing projects? Focus on core differences in mold design robustness, material validation, production scalability, and quality control to select a partner that delivers consistent, cost-effective results for high-volume production."
url: "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html"
language: "en"
type: "Q&A"
category: "Custom Manufacturing Q&A"
datePublished: "2026-09-17"
dateModified: "2026-09-17"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# How to Select a Reliable ODM Supplier for Heat-Resistant Home Appliance Housings?

## Question

 I’m a supply chain manager in charge of mold procurement for a mid-sized home appliance brand, currently evaluating three shortlisted ODM suppliers for our new countertop air fryer housing project. Our project requirements are strict: 500,000 annual production volume, first sample delivery within 6 weeks, heat resistance up to 180°C for the upper housing, and assembly tolerance of ±0.1mm for mating with the control panel and base. Supplier A offers a 15% lower mold cost but only a 6-month mold warranty and limited experience with heat-resistant engineering plastics. Supplier B has a proven track record in high-precision mold design and material validation, but their lead time for first samples is 8 weeks—two weeks over our target. Supplier C matches our lead time and price targets, but their quality audit report shows a 2.3% defect rate for similar housing parts, compared to Supplier B’s 0.8%. I’m struggling to prioritize these trade-offs to select a supplier that aligns with our project’s cost, quality, and timeline goals. What key criteria should I focus on, and how should I score each supplier against these criteria? 

## Answers
                            
### Answer 1 — Best Answer

The core differences between your shortlisted suppliers lie in three non-negotiable dimensions for home appliance ODM housing projects: mold design robustness, material validation capabilities, and production scalability. Supplier A’s low-cost offering comes with significant risks: a 6-month mold warranty is insufficient for a 500k annual volume run, as molds for heat-resistant materials experience faster wear from high melt temperatures. Their limited material expertise could lead to premature part degradation under the air fryer’s operating heat, resulting in field failures and costly recalls. Supplier B’s strength in mold design ensures consistent part tolerances and reduced defect rates over long production runs, while their material validation processes guarantee compliance with 180°C heat resistance requirements. The 2-week sample lead time delay is a manageable trade-off if aligned with your project’s overall launch timeline. Supplier C’s competitive lead time and price are undermined by their higher defect rate, which would increase rework costs and production bottlenecks in high-volume operations.

Each supplier aligns with distinct project scenarios: Supplier A is suitable for low-volume, non-heat-sensitive home appliance housing projects where cost is the primary driver. Supplier B is the ideal fit for complex, high-precision projects with long production runs and strict performance requirements, such as your air fryer housing. Supplier C may work for mid-volume projects with flexible defect tolerance and shorter production lifecycles, but it does not meet your quality standards for a high-volume, heat-sensitive product.

For your specific air fryer project, prioritize Supplier B with targeted negotiations to mitigate the lead time gap. **Request third-party material heat resistance test reports** to confirm their resin choices meet your 180°C requirement. **Conduct a mold design audit** to verify that cooling channels are optimized for heat dissipation and gate locations minimize part warping. Finally, negotiate a phased lead time reduction plan: ask for a prototype sample within 6 weeks for fit testing, with full production molds delivered by week 8. This approach balances your timeline needs with the quality and performance critical to your product’s success.

**status:** accepted
**Author:** Kevin Liu
**Date:** 2026-09-17

### Answer 2

When evaluating suppliers, focus on their ability to optimize injection process parameters for heat-resistant materials, which are more prone to defects like warping and sink marks. Ask each supplier to provide process capability studies (Cp/Cpk values) for critical features of the air fryer housing, such as the heat vent openings and mounting holes. A Cp/Cpk score of 1.33 or higher indicates a stable process that can maintain tolerances consistently across high-volume runs.

Additionally, inquire about their real-time monitoring systems for melt temperature, injection pressure, and cooling time—suppliers with automated monitoring can adjust parameters dynamically to prevent defects before they occur. For Supplier B, even with a longer lead time, their process optimization for heat-resistant resins will reduce scrap rates and rework costs over the 500k production volume, offsetting any initial timeline delays.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-17

### Answer 3

Tolerance stack-up is a critical factor for your air fryer housing, as it involves mating with three distinct components: the control panel, base, and lid. Ask each supplier to provide a detailed tolerance stack-up analysis for the entire assembly, not just individual housing parts.

This analysis should map how variations in the housing’s dimensions (like the alignment of screw holes and the flatness of the mating surface) will affect overall fit. Suppliers who use statistical process control (SPC) to track tolerance variations during production are better equipped to maintain consistency.

For example, Supplier C’s 2.3% defect rate may include parts that fail assembly due to misaligned holes, leading to manual rework or rejected batches. Prioritize suppliers who can demonstrate experience with tight-tolerance assembly for home appliances, as this will reduce production bottlenecks and ensure smooth line integration.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-17

### Answer 4

The precision of mold machining directly impacts the quality and durability of your home appliance housing. Inquire about each supplier’s CNC machining strategy for mold cores and cavities. Suppliers using 5-axis CNC machines can achieve tighter tolerances and more complex geometries, which is essential for the air fryer’s curved housing and precise heat vent slots.

Additionally, ask about their fixture design—custom fixtures ensure consistent positioning of mold components during machining, reducing variation in part dimensions. For heat-resistant housing molds, precise machining of cooling channels is critical to minimize cycle time and prevent part warping. Supplier B’s high-precision mold design expertise likely includes advanced CNC machining capabilities, which will result in a mold that maintains dimensional accuracy over thousands of production cycles.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-17

### Answer 5

Early design-for-manufacture (DFM) feedback is key to reducing mold costs and production risks for your air fryer housing. Ask each supplier to provide a DFM review of your current housing design, focusing on factors like draft angles, wall thickness uniformity, and rib placement. Suppliers who proactively suggest design modifications—such as increasing draft angles for easier part ejection or adding reinforcing ribs to eliminate sink marks without increasing wall thickness—are more valuable long-term partners.

For example, Supplier A may not offer detailed DFM feedback, leading to unexpected mold adjustments or production delays later. Prioritize suppliers who integrate DFM into their initial project assessment, as this will ensure your design is optimized for high-volume injection molding and meets all performance requirements.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-09-17

### Answer 6

Mold structure decisions directly affect part quality, production efficiency, and mold lifespan. Inquire about each supplier’s gate location and runner system design for your air fryer housing. For heat-resistant materials, hot runner systems are preferable to cold runners because they reduce material waste and ensure uniform melt temperature, minimizing part warping.

Additionally, ask about mold steel selection—suppliers using high-grade tool steel like H13 for mold cores and cavities will have molds that withstand the high temperatures of heat-resistant resins, extending mold lifespan. Supplier B’s proven mold design track record likely includes optimized gate locations and durable steel selection, which will reduce maintenance costs and ensure consistent part quality over the 500k production volume.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-17

### Answer 7

Choosing the right resin grade is critical for meeting your air fryer housing’s heat resistance requirement of 180°C. Ask each supplier to provide a cost-performance analysis of potential materials, such as modified PP with heat stabilizers, PPS, or PET-G.

While modified PP is more cost-effective, PPS offers superior heat resistance and chemical stability, making it ideal for long-term use in air fryers. Inquire about their material testing processes—suppliers who conduct heat aging tests (per ISO 188) and impact resistance tests can confirm that the material will not degrade or become brittle over time.

Supplier A’s limited experience with heat-resistant plastics may lead them to select a cheaper resin that fails under operating conditions, resulting in field failures. Prioritize suppliers who can demonstrate expertise in matching materials to end-use requirements.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-09-17

### Answer 8

Production line efficiency and scalability are essential for meeting your 500k annual volume target. Ask each supplier about their injection molding machine capacity, including the number of machines with sufficient tonnage for your housing (typically 200-300 tons for mid-sized home appliance housings).

Inquire about their use of automation, such as robotic part handlers and conveyor systems, which reduce cycle time and human error. Suppliers who can achieve a cycle time of under 45 seconds per part will be able to meet your volume requirements without adding extra shifts.

Supplier C’s higher defect rate may indicate inefficient production processes, leading to longer cycle times and increased scrap. Prioritize suppliers who can demonstrate a track record of scaling production for high-volume home appliance projects.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-17

### Answer 9

End-use functional validation is critical to ensure your air fryer housing performs as intended in real-world conditions. Ask each supplier to provide test reports for similar home appliance components, including thermal cycling tests (exposing parts to repeated 180°C and room temperature cycles) and drop tests (simulating accidental falls). Suppliers who conduct field validation with actual end-users can identify potential issues, such as heat buildup in specific areas or difficulty cleaning, that may not be caught in lab tests.

Additionally, inquire about their support for prototype testing—suppliers who offer iterative design adjustments based on functional feedback will help you refine the housing before full production. Supplier B’s experience with high-precision home appliance components likely includes comprehensive functional validation, reducing the risk of post-launch issues.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-17

### Answer 10

Robust quality control processes are essential for maintaining consistent part quality across high-volume production. Ask each supplier to detail their inspection criteria and checkpoint schedule, including incoming quality control (IQC) for resin batches, in-process quality control (IPQC) during production, and outgoing quality control (OQC) for finished parts.

Suppliers who use coordinate measuring machines (CMM) for dimensional checks and visual inspection systems for surface defects can ensure compliance with your ±0.1mm tolerance requirement. Inquire about their defect classification system and corrective action process (CAPA)—suppliers who document and address defects promptly will reduce rework costs and production delays.

Supplier C’s 2.3% defect rate suggests gaps in their IPQC processes, which will be costly to address in a 500k volume run. Prioritize suppliers with a documented ISO 9001 quality management system and a track record of low defect rates.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-17

## Related Resources

- [Custom Manufacturing Q&A](https://www.jaterson.com/qa/oem-odm/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to Select a Reliable ODM Supplier for Heat-Resistant Home Appliance Housings?",
        "text": "I’m a supply chain manager in charge of mold procurement for a mid-sized home appliance brand, currently evaluating three shortlisted ODM suppliers for our new countertop air fryer housing project. Our project requirements are strict: 500,000 annual production volume, first sample delivery within 6 weeks, heat resistance up to 180°C for the upper housing, and assembly tolerance of ±0.1mm for mating with the control panel and base. Supplier A offers a 15% lower mold cost but only a 6-month mold warranty and limited experience with heat-resistant engineering plastics. Supplier B has a proven track record in high-precision mold design and material validation, but their lead time for first samples is 8 weeks—two weeks over our target. Supplier C matches our lead time and price targets, but their quality audit report shows a 2.3% defect rate for similar housing parts, compared to Supplier B’s 0.8%. I’m struggling to prioritize these trade-offs to select a supplier that aligns with our project’s cost, quality, and timeline goals. What key criteria should I focus on, and how should I score each supplier against these criteria?",
        "answerCount": 10,
        "upvoteCount": 6,
        "datePublished": "2026-09-17T20:28:13Z",
        "dateModified": "2026-09-17T20:38:26Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The core differences between your shortlisted suppliers lie in three non-negotiable dimensions for home appliance ODM housing projects: mold design robustness, material validation capabilities, and production scalability. Supplier A’s low-cost offering comes with significant risks: a 6-month mold warranty is insufficient for a 500k annual volume run, as molds for heat-resistant materials experience faster wear from high melt temperatures. Their limited material expertise could lead to premature part degradation under the air fryer’s operating heat, resulting in field failures and costly recalls. Supplier B’s strength in mold design ensures consistent part tolerances and reduced defect rates over long production runs, while their material validation processes guarantee compliance with 180°C heat resistance requirements. The 2-week sample lead time delay is a manageable trade-off if aligned with your project’s overall launch timeline. Supplier C’s competitive lead time and price are undermined by their higher defect rate, which would increase rework costs and production bottlenecks in high-volume operations. Each supplier aligns with distinct project scenarios: Supplier A is suitable for low-volume, non-heat-sensitive home appliance housing projects where cost is the primary driver. Supplier B is the ideal fit for complex, high-precision projects with long production runs and strict performance requirements, such as your air fryer housing. Supplier C may work for mid-volume projects with flexible defect tolerance and shorter production lifecycles, but it does not meet your quality standards for a high-volume, heat-sensitive product. For your specific air fryer project, prioritize Supplier B with targeted negotiations to mitigate the lead time gap. Request third-party material heat resistance test reports to confirm their resin choices meet your 180°C requirement. Conduct a mold design audit to verify that cooling channels are optimized for heat dissipation and gate locations minimize part warping. Finally, negotiate a phased lead time reduction plan: ask for a prototype sample within 6 weeks for fit testing, with full production molds delivered by week 8. This approach balances your timeline needs with the quality and performance critical to your product’s success.",
            "upvoteCount": 6,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#acceptedAnswer",
            "datePublished": "2026-09-17T21:40:07Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "When evaluating suppliers, focus on their ability to optimize injection process parameters for heat-resistant materials, which are more prone to defects like warping and sink marks. Ask each supplier to provide process capability studies (Cp/Cpk values) for critical features of the air fryer housing, such as the heat vent openings and mounting holes. A Cp/Cpk score of 1.33 or higher indicates a stable process that can maintain tolerances consistently across high-volume runs. Additionally, inquire about their real-time monitoring systems for melt temperature, injection pressure, and cooling time—suppliers with automated monitoring can adjust parameters dynamically to prevent defects before they occur. For Supplier B, even with a longer lead time, their process optimization for heat-resistant resins will reduce scrap rates and rework costs over the 500k production volume, offsetting any initial timeline delays.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-2",
            "datePublished": "2026-09-17T21:38:39Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Tolerance stack-up is a critical factor for your air fryer housing, as it involves mating with three distinct components: the control panel, base, and lid. Ask each supplier to provide a detailed tolerance stack-up analysis for the entire assembly, not just individual housing parts. This analysis should map how variations in the housing’s dimensions (like the alignment of screw holes and the flatness of the mating surface) will affect overall fit. Suppliers who use statistical process control (SPC) to track tolerance variations during production are better equipped to maintain consistency. For example, Supplier C’s 2.3% defect rate may include parts that fail assembly due to misaligned holes, leading to manual rework or rejected batches. Prioritize suppliers who can demonstrate experience with tight-tolerance assembly for home appliances, as this will reduce production bottlenecks and ensure smooth line integration.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-3",
            "datePublished": "2026-09-17T21:35:16Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The precision of mold machining directly impacts the quality and durability of your home appliance housing. Inquire about each supplier’s CNC machining strategy for mold cores and cavities. Suppliers using 5-axis CNC machines can achieve tighter tolerances and more complex geometries, which is essential for the air fryer’s curved housing and precise heat vent slots. Additionally, ask about their fixture design—custom fixtures ensure consistent positioning of mold components during machining, reducing variation in part dimensions. For heat-resistant housing molds, precise machining of cooling channels is critical to minimize cycle time and prevent part warping. Supplier B’s high-precision mold design expertise likely includes advanced CNC machining capabilities, which will result in a mold that maintains dimensional accuracy over thousands of production cycles.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-4",
            "datePublished": "2026-09-17T21:33:01Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Early design-for-manufacture (DFM) feedback is key to reducing mold costs and production risks for your air fryer housing. Ask each supplier to provide a DFM review of your current housing design, focusing on factors like draft angles, wall thickness uniformity, and rib placement. Suppliers who proactively suggest design modifications—such as increasing draft angles for easier part ejection or adding reinforcing ribs to eliminate sink marks without increasing wall thickness—are more valuable long-term partners. For example, Supplier A may not offer detailed DFM feedback, leading to unexpected mold adjustments or production delays later. Prioritize suppliers who integrate DFM into their initial project assessment, as this will ensure your design is optimized for high-volume injection molding and meets all performance requirements.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-5",
            "datePublished": "2026-09-17T21:14:04Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Mold structure decisions directly affect part quality, production efficiency, and mold lifespan. Inquire about each supplier’s gate location and runner system design for your air fryer housing. For heat-resistant materials, hot runner systems are preferable to cold runners because they reduce material waste and ensure uniform melt temperature, minimizing part warping. Additionally, ask about mold steel selection—suppliers using high-grade tool steel like H13 for mold cores and cavities will have molds that withstand the high temperatures of heat-resistant resins, extending mold lifespan. Supplier B’s proven mold design track record likely includes optimized gate locations and durable steel selection, which will reduce maintenance costs and ensure consistent part quality over the 500k production volume.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-6",
            "datePublished": "2026-09-17T21:08:54Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Choosing the right resin grade is critical for meeting your air fryer housing’s heat resistance requirement of 180°C. Ask each supplier to provide a cost-performance analysis of potential materials, such as modified PP with heat stabilizers, PPS, or PET-G. While modified PP is more cost-effective, PPS offers superior heat resistance and chemical stability, making it ideal for long-term use in air fryers. Inquire about their material testing processes—suppliers who conduct heat aging tests (per ISO 188) and impact resistance tests can confirm that the material will not degrade or become brittle over time. Supplier A’s limited experience with heat-resistant plastics may lead them to select a cheaper resin that fails under operating conditions, resulting in field failures. Prioritize suppliers who can demonstrate expertise in matching materials to end-use requirements.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-7",
            "datePublished": "2026-09-17T20:51:15Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Production line efficiency and scalability are essential for meeting your 500k annual volume target. Ask each supplier about their injection molding machine capacity, including the number of machines with sufficient tonnage for your housing (typically 200-300 tons for mid-sized home appliance housings). Inquire about their use of automation, such as robotic part handlers and conveyor systems, which reduce cycle time and human error. Suppliers who can achieve a cycle time of under 45 seconds per part will be able to meet your volume requirements without adding extra shifts. Supplier C’s higher defect rate may indicate inefficient production processes, leading to longer cycle times and increased scrap. Prioritize suppliers who can demonstrate a track record of scaling production for high-volume home appliance projects.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-8",
            "datePublished": "2026-09-17T20:46:46Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "End-use functional validation is critical to ensure your air fryer housing performs as intended in real-world conditions. Ask each supplier to provide test reports for similar home appliance components, including thermal cycling tests (exposing parts to repeated 180°C and room temperature cycles) and drop tests (simulating accidental falls). Suppliers who conduct field validation with actual end-users can identify potential issues, such as heat buildup in specific areas or difficulty cleaning, that may not be caught in lab tests. Additionally, inquire about their support for prototype testing—suppliers who offer iterative design adjustments based on functional feedback will help you refine the housing before full production. Supplier B’s experience with high-precision home appliance components likely includes comprehensive functional validation, reducing the risk of post-launch issues.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-9",
            "datePublished": "2026-09-17T20:43:18Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Robust quality control processes are essential for maintaining consistent part quality across high-volume production. Ask each supplier to detail their inspection criteria and checkpoint schedule, including incoming quality control (IQC) for resin batches, in-process quality control (IPQC) during production, and outgoing quality control (OQC) for finished parts. Suppliers who use coordinate measuring machines (CMM) for dimensional checks and visual inspection systems for surface defects can ensure compliance with your ±0.1mm tolerance requirement. Inquire about their defect classification system and corrective action process (CAPA)—suppliers who document and address defects promptly will reduce rework costs and production delays. Supplier C’s 2.3% defect rate suggests gaps in their IPQC processes, which will be costly to address in a 500k volume run. Prioritize suppliers with a documented ISO 9001 quality management system and a track record of low defect rates.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/reliable-odm-supplier-heat-resistant-home-appliance-housings.html#suggestedAnswer-10",
            "datePublished": "2026-09-17T20:38:26Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.jaterson.com/qa/oem-odm/"}          ,{"@type": "ListItem", "position": 4, "name": "How to Select a Reliable ODM Supplier for Heat-Resistant Home Appliance Housings?"}
      ]
    }
]
```