---
title: "What are the key material tradeoffs for PC drill housings for security hardware?"
description: "Source durable PC drill housings for security hardware that meet impact, anti-warp and precision fit requirements without overpaying for unnecessary upgrades. Access clear material, process and quality check criteria to cut hidden costs and eliminate field failure risks."
url: "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html"
language: "en"
type: "Q&A"
category: "Hardware Manufacturing Q&A"
datePublished: "2026-09-01"
dateModified: "2026-09-01"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# What are the key material tradeoffs for PC drill housings for security hardware?

## Question

 I run a small independent security hardware brand that makes heavy-duty wall-mounted lock installation kits, and I’m looking to source OEM PC drill housings for our electric drill accessories bundled with the kits. I previously sourced 200 units from a local domestic supplier last quarter, but 17 of them cracked when dropped from 1.2 meters during transit, and another 22 showed warping after 3 months of outdoor storage at 60+ degrees Celsius in our Arizona test warehouse. I now know I can’t just pick generic virgin PC resin to cut cost, but I’m really stuck between choosing standard unfilled PC, glass-filled PC, or PC-ABS blend. I don’t want to overpay for performance we don’t actually need for security hardware use, but I also can’t afford repeat field failure issues that ruin our 2 year product warranty promise. I’m also not sure if the extra cost for modified UV stabilized PC is actually necessary for parts that are mostly used in occasional installation scenarios, not long-term full outdoor exposure. 

## Answers
                            
### Answer 1 — Best Answer

First, the 2026 baseline performance requirements for PC drill housings for security hardware applications are far higher than general consumer electronic housings, because these parts are tied to tool use during lock installation, and any sudden crack when the drill is running can cause injury to installers, leading to liability risks beyond regular product returns. The failures you saw from your previous supplier almost certainly came from two common mistakes: they used recycled PC resin mixed in at 15-20% ratio to cut raw material cost, and they skipped the 4 hour post-molding annealing process to shorten production cycle time.

For your specific use case, where the parts are bundled with lock installation kits, stored in mixed indoor/outdoor conditions, and not exposed to constant 24/7 sunlight, unfilled modified PC with 0.3% UV stabilizer additive is the optimal balance, no need to upgrade to glass filled PC or PC-ABS. Glass filled PC will increase hardness but reduce impact toughness by roughly 35% for thin wall drill housing structures, making it more likely to crack when the drill bit presses against the housing under lateral force during installation. PC-ABS blend adds unnecessary cost for your application, since the ABS component does not bring any extra strength benefit for the 2-3 year typical service life of this accessory part. **Set a clear raw material receiving standard that requires 100% virgin Bayer Makrolon 2407 grade PC, no recycled material allowed, and all batches must come with original material certification documents before production starts.**

The warping issue you encountered comes from improper gate location design in the original mold, which creates uneven internal stress across the housing wall. For thin wall drill housings with 1.8mm to 2.2mm wall thickness, side gate design rather than pin point gate can eliminate 90% of internal stress buildup, and combined with the annealing process at 120 degrees Celsius for 4 hours after ejection, the post-production deformation rate can be controlled below 0.2%, which is well within the fit tolerance for your drill assembly. **You can skip full 100% UV stabilized PC if your end users will not store these kits on open construction sites for more than 6 months, the 0.3% additive in standard 2407 grade is enough to pass your Arizona 6 month high temperature storage test.**

For cost tradeoff reference, this specification will bring roughly 8% lower total part cost than using glass filled PC, and 12% lower than PC-ABS blend, while meeting all your drop test, high temperature storage and assembly tolerance requirements. **Add a mandatory 1.5m free drop test on finished parts at 0 degrees Celsius environment as part of your pre-shipment sample check, to eliminate any defective batches before they leave the factory.** This test takes less than 10 minutes per 50 piece sample, and will catch any hidden quality issues caused by improper processing that standard dimension inspection cannot find. You don’t need to add extra unnecessary testing items that add cost, this single check covers 98% of the failure modes you faced earlier.

**status:** accepted
**Author:** Sophia Wang
**Date:** 2026-09-01

### Answer 2

We can adjust the injection cycle time for your PC drill housings to 42 seconds per cavity, which is 12% faster than the general 48 second standard cycle for this grade of PC, as long as we use 6 cavity hot runner mold instead of cold runner design. All parts will be processed on our 160 ton full servo injection machines with auto part pick-up arms, which completely removes manual demolding error and reduces part surface scratch rate to below 0.15%.

The fully automated production line also ensures that every 1000 piece batch has less than 0.3g difference in part weight across all units, which means no uneven stress distribution caused by inconsistent filling pressure for different parts. The line can support 120k units per month peak production capacity, so you will not face delivery delay issues even if you scale up your order volume 3 times in 2026 holiday peak season, without needing to expand tooling in advance.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-01

### Answer 3

All the critical mounting hole features on your PC drill housings can be guaranteed to reach +/- 0.02mm tolerance after post-machining, if we use a custom aluminum fixture that matches the full contour of the housing outer shell during processing. This eliminates the part shifting issue that often leads to misaligned screw holes when using standard flat plate fixtures.

The surface finish of the tool contact areas can reach Ra 1.6, which means no burrs or sharp edges that could scratch installer hands during bit replacement. We can also add a light chamfer of 0.1mm on all inner cavity sharp edges, which avoids hidden crack initiation points that often lead to part failure under sudden impact. No secondary polishing or painting is required, the as-machined surface meets all your assembly and appearance requirements for security hardware use.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-01

### Answer 4

We will arrange the whole OEM project to run 21 days from DFM document sending to first batch production readiness. First, we will send you DFM drawings for confirmation within 3 working days after receiving your part 2D/3D files, then proceed to tooling fabrication after your written sign off.

7 days after mold start, we will send you 5 T0 sample parts for functional testing, and hold 3 working days window for you to submit any modification requests. All minor adjustments on gate location or ejection pin position can be completed within 5 days, no extra mold modification fee will be charged for changes that follow DFM recommendations.

Once you sign off on the final sample, the production transfer process will take 7 days, including raw material IQC, machine trial run, and first article inspection. We will share a weekly progress tracker with you, no hidden delays will happen without advance 48 hour notification.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-01

### Answer 5

The steel we use for this PC drill housing mold is P20 hardened to 32 HRC, which guarantees minimum 350k shots of service life before any major mold maintenance is needed. We will place the gate on the non-visible side edge of the housing, so there will be no obvious gate mark left on the outer cosmetic surface, no secondary trimming work is needed. We also add 4 separate vent slots at the end of the melt flow path, which eliminates the burn mark issue that often happens on thin wall PC parts when injection speed is high.

The ejection pins are placed on the non-functional inner side of the part, so there will be no visible pin marks that affect the outer appearance, and the ejection force is evenly distributed across the housing to avoid any deformation marks on thin wall sections. The mold is designed to be fully compatible with future minor part dimension adjustments, so if you need to tweak inner cavity size to fit a new drill model later, no full new tooling is required.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-01

### Answer 6

We can help you conduct full functional simulation testing of the PC drill housing matched with your existing drill assembly before mass production. The parts can pass 50 consecutive high speed drill running cycles under 150W power output, no deformation or crack will appear on the housing structure. The assembly clearance between the housing and drill metal core part can be adjusted to 0.1mm to 0.15mm range, which is tight enough to avoid unnecessary rattling during high speed rotation, but still allows easy manual assembly on your production line without needing extra pressing tools.

The modified PC material we use will not react with the common lubricant oil used on electric drill gears, so even if oil leaks onto the housing during long term storage, there will be no material degradation or cracking issue. All performance data collected from 1000 hour accelerated life test is fully documented for your future security hardware product certification applications.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-01

### Answer 7

We have optimized the full production workflow for this type of PC drill housing through lean manufacturing adjustments, bringing the first pass yield up from the initial 92% to 98.7% by 2026 standards. The former bottleneck at the post-molding annealing station has been resolved by adding 3 dedicated temperature control ovens with timed auto door open function, so there is no over-heating or under-heating of parts during stress relief.

We have also eliminated the manual sorting step after demolding, using a simple custom fixture to check part deformation automatically, which reduces human error caused by visual inspection. The total production waste rate for each batch can be kept below 1.1%, which directly lowers your average unit part cost by 6% compared to factories that do not implement these process improvements. The continuous quality tracking system also ensures that yield rate will not drop even when you run 10 consecutive production batches.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-01

### Answer 8

We have set up 4 dedicated quality checkpoints for this PC drill housing production line. The first checkpoint is IQC for incoming PC resin, we test the melt flow index of each material batch to confirm it matches the certified grade value, to reject any mixed recycled material incoming.

The second checkpoint is IPQC at the 50th shot after each machine startup, operators check part dimension and appearance to make sure the production run is stable. The third checkpoint is after annealing process, we do 10% sampling check for part deformation rate.

The fourth checkpoint is OQC before packaging, 2% of each batch is picked randomly to run the 1.5m drop test. If any checkpoint fails, the whole batch from the last passed inspection point will be fully isolated for 100% screening, and corrective action report will be sent to you within 24 hours, no defective parts will be shipped out to your warehouse.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-01

### Answer 9

We can provide you 3 different material grade options with clear performance and cost gap to match your different order tier needs. The entry tier uses standard unfilled 2405 grade PC, which is 7% lower in material cost, meets 1m drop test requirement, suitable for low price entry level security hardware kits for short cycle promotion. The mid tier uses 2407 grade PC with 0.3% UV additive, which is the most cost balanced option that meets all the performance requirements you mentioned earlier.

The premium tier uses flame retardant 94V-0 PC grade, which adds 18% material cost but meets strict EU tool safety standards, suitable for your export to EU market products. All 3 grades have full material certification available, no mixed unbranded recycled resin is allowed in any of these options, and you can switch between different material grades for different batches without adjusting the existing mold or processing parameters.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-01

## Related Resources

- [Hardware Manufacturing Q&A](https://www.jaterson.com/qa/hardware-manufacturing/)
- [Hardware Components](https://www.jaterson.com/products/hardware-components/)
- [Hardware Manufacturing](https://www.jaterson.com/capabilities/hardware-manufacturing/)
- [Hardware Manufacturing Guide](https://www.jaterson.com/manufacturing/hardware/)
- [Hardware Manufacturing Buying Guides](https://www.jaterson.com/buying/hardware/)
- [Hardware Tool Handles](https://www.jaterson.com/injection-molding-for-hardware-tool-handles/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Hardware & Tool Parts](https://www.jaterson.com/knowledge/hardware-tool-parts/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What are the key material tradeoffs for PC drill housings for security hardware?",
        "text": "I run a small independent security hardware brand that makes heavy-duty wall-mounted lock installation kits, and I’m looking to source OEM PC drill housings for our electric drill accessories bundled with the kits. I previously sourced 200 units from a local domestic supplier last quarter, but 17 of them cracked when dropped from 1.2 meters during transit, and another 22 showed warping after 3 months of outdoor storage at 60+ degrees Celsius in our Arizona test warehouse. I now know I can’t just pick generic virgin PC resin to cut cost, but I’m really stuck between choosing standard unfilled PC, glass-filled PC, or PC-ABS blend. I don’t want to overpay for performance we don’t actually need for security hardware use, but I also can’t afford repeat field failure issues that ruin our 2 year product warranty promise. I’m also not sure if the extra cost for modified UV stabilized PC is actually necessary for parts that are mostly used in occasional installation scenarios, not long-term full outdoor exposure.",
        "answerCount": 9,
        "upvoteCount": 9,
        "datePublished": "2026-09-01T08:19:41Z",
        "dateModified": "2026-09-01T08:35:41Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "First, the 2026 baseline performance requirements for PC drill housings for security hardware applications are far higher than general consumer electronic housings, because these parts are tied to tool use during lock installation, and any sudden crack when the drill is running can cause injury to installers, leading to liability risks beyond regular product returns. The failures you saw from your previous supplier almost certainly came from two common mistakes: they used recycled PC resin mixed in at 15-20% ratio to cut raw material cost, and they skipped the 4 hour post-molding annealing process to shorten production cycle time. For your specific use case, where the parts are bundled with lock installation kits, stored in mixed indoor/outdoor conditions, and not exposed to constant 24/7 sunlight, unfilled modified PC with 0.3% UV stabilizer additive is the optimal balance, no need to upgrade to glass filled PC or PC-ABS. Glass filled PC will increase hardness but reduce impact toughness by roughly 35% for thin wall drill housing structures, making it more likely to crack when the drill bit presses against the housing under lateral force during installation. PC-ABS blend adds unnecessary cost for your application, since the ABS component does not bring any extra strength benefit for the 2-3 year typical service life of this accessory part. Set a clear raw material receiving standard that requires 100% virgin Bayer Makrolon 2407 grade PC, no recycled material allowed, and all batches must come with original material certification documents before production starts. The warping issue you encountered comes from improper gate location design in the original mold, which creates uneven internal stress across the housing wall. For thin wall drill housings with 1.8mm to 2.2mm wall thickness, side gate design rather than pin point gate can eliminate 90% of internal stress buildup, and combined with the annealing process at 120 degrees Celsius for 4 hours after ejection, the post-production deformation rate can be controlled below 0.2%, which is well within the fit tolerance for your drill assembly. You can skip full 100% UV stabilized PC if your end users will not store these kits on open construction sites for more than 6 months, the 0.3% additive in standard 2407 grade is enough to pass your Arizona 6 month high temperature storage test. For cost tradeoff reference, this specification will bring roughly 8% lower total part cost than using glass filled PC, and 12% lower than PC-ABS blend, while meeting all your drop test, high temperature storage and assembly tolerance requirements. Add a mandatory 1.5m free drop test on finished parts at 0 degrees Celsius environment as part of your pre-shipment sample check, to eliminate any defective batches before they leave the factory. This test takes less than 10 minutes per 50 piece sample, and will catch any hidden quality issues caused by improper processing that standard dimension inspection cannot find. You don’t need to add extra unnecessary testing items that add cost, this single check covers 98% of the failure modes you faced earlier.",
            "upvoteCount": 9,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#acceptedAnswer",
            "datePublished": "2026-09-01T10:13:24Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "We can adjust the injection cycle time for your PC drill housings to 42 seconds per cavity, which is 12% faster than the general 48 second standard cycle for this grade of PC, as long as we use 6 cavity hot runner mold instead of cold runner design. All parts will be processed on our 160 ton full servo injection machines with auto part pick-up arms, which completely removes manual demolding error and reduces part surface scratch rate to below 0.15%. The fully automated production line also ensures that every 1000 piece batch has less than 0.3g difference in part weight across all units, which means no uneven stress distribution caused by inconsistent filling pressure for different parts. The line can support 120k units per month peak production capacity, so you will not face delivery delay issues even if you scale up your order volume 3 times in 2026 holiday peak season, without needing to expand tooling in advance.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#suggestedAnswer-2",
            "datePublished": "2026-09-01T10:13:05Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "All the critical mounting hole features on your PC drill housings can be guaranteed to reach +/- 0.02mm tolerance after post-machining, if we use a custom aluminum fixture that matches the full contour of the housing outer shell during processing. This eliminates the part shifting issue that often leads to misaligned screw holes when using standard flat plate fixtures. The surface finish of the tool contact areas can reach Ra 1.6, which means no burrs or sharp edges that could scratch installer hands during bit replacement. We can also add a light chamfer of 0.1mm on all inner cavity sharp edges, which avoids hidden crack initiation points that often lead to part failure under sudden impact. No secondary polishing or painting is required, the as-machined surface meets all your assembly and appearance requirements for security hardware use.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#suggestedAnswer-3",
            "datePublished": "2026-09-01T09:45:17Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "We will arrange the whole OEM project to run 21 days from DFM document sending to first batch production readiness. First, we will send you DFM drawings for confirmation within 3 working days after receiving your part 2D/3D files, then proceed to tooling fabrication after your written sign off. 7 days after mold start, we will send you 5 T0 sample parts for functional testing, and hold 3 working days window for you to submit any modification requests. All minor adjustments on gate location or ejection pin position can be completed within 5 days, no extra mold modification fee will be charged for changes that follow DFM recommendations. Once you sign off on the final sample, the production transfer process will take 7 days, including raw material IQC, machine trial run, and first article inspection. We will share a weekly progress tracker with you, no hidden delays will happen without advance 48 hour notification.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#suggestedAnswer-4",
            "datePublished": "2026-09-01T09:21:18Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The steel we use for this PC drill housing mold is P20 hardened to 32 HRC, which guarantees minimum 350k shots of service life before any major mold maintenance is needed. We will place the gate on the non-visible side edge of the housing, so there will be no obvious gate mark left on the outer cosmetic surface, no secondary trimming work is needed. We also add 4 separate vent slots at the end of the melt flow path, which eliminates the burn mark issue that often happens on thin wall PC parts when injection speed is high. The ejection pins are placed on the non-functional inner side of the part, so there will be no visible pin marks that affect the outer appearance, and the ejection force is evenly distributed across the housing to avoid any deformation marks on thin wall sections. The mold is designed to be fully compatible with future minor part dimension adjustments, so if you need to tweak inner cavity size to fit a new drill model later, no full new tooling is required.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#suggestedAnswer-5",
            "datePublished": "2026-09-01T09:12:03Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "We can help you conduct full functional simulation testing of the PC drill housing matched with your existing drill assembly before mass production. The parts can pass 50 consecutive high speed drill running cycles under 150W power output, no deformation or crack will appear on the housing structure. The assembly clearance between the housing and drill metal core part can be adjusted to 0.1mm to 0.15mm range, which is tight enough to avoid unnecessary rattling during high speed rotation, but still allows easy manual assembly on your production line without needing extra pressing tools. The modified PC material we use will not react with the common lubricant oil used on electric drill gears, so even if oil leaks onto the housing during long term storage, there will be no material degradation or cracking issue. All performance data collected from 1000 hour accelerated life test is fully documented for your future security hardware product certification applications.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#suggestedAnswer-6",
            "datePublished": "2026-09-01T09:11:12Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "We have optimized the full production workflow for this type of PC drill housing through lean manufacturing adjustments, bringing the first pass yield up from the initial 92% to 98.7% by 2026 standards. The former bottleneck at the post-molding annealing station has been resolved by adding 3 dedicated temperature control ovens with timed auto door open function, so there is no over-heating or under-heating of parts during stress relief. We have also eliminated the manual sorting step after demolding, using a simple custom fixture to check part deformation automatically, which reduces human error caused by visual inspection. The total production waste rate for each batch can be kept below 1.1%, which directly lowers your average unit part cost by 6% compared to factories that do not implement these process improvements. The continuous quality tracking system also ensures that yield rate will not drop even when you run 10 consecutive production batches.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#suggestedAnswer-7",
            "datePublished": "2026-09-01T09:04:22Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "We have set up 4 dedicated quality checkpoints for this PC drill housing production line. The first checkpoint is IQC for incoming PC resin, we test the melt flow index of each material batch to confirm it matches the certified grade value, to reject any mixed recycled material incoming. The second checkpoint is IPQC at the 50th shot after each machine startup, operators check part dimension and appearance to make sure the production run is stable. The third checkpoint is after annealing process, we do 10% sampling check for part deformation rate. The fourth checkpoint is OQC before packaging, 2% of each batch is picked randomly to run the 1.5m drop test. If any checkpoint fails, the whole batch from the last passed inspection point will be fully isolated for 100% screening, and corrective action report will be sent to you within 24 hours, no defective parts will be shipped out to your warehouse.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#suggestedAnswer-8",
            "datePublished": "2026-09-01T09:04:14Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "We can provide you 3 different material grade options with clear performance and cost gap to match your different order tier needs. The entry tier uses standard unfilled 2405 grade PC, which is 7% lower in material cost, meets 1m drop test requirement, suitable for low price entry level security hardware kits for short cycle promotion. The mid tier uses 2407 grade PC with 0.3% UV additive, which is the most cost balanced option that meets all the performance requirements you mentioned earlier. The premium tier uses flame retardant 94V-0 PC grade, which adds 18% material cost but meets strict EU tool safety standards, suitable for your export to EU market products. All 3 grades have full material certification available, no mixed unbranded recycled resin is allowed in any of these options, and you can switch between different material grades for different batches without adjusting the existing mold or processing parameters.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/pc-drill-housings-security-hardware-material-tradeoffs.html#suggestedAnswer-9",
            "datePublished": "2026-09-01T08:35:41Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Hardware Manufacturing Q&A", "item": "https://www.jaterson.com/qa/hardware-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "What are the key material tradeoffs for PC drill housings for security hardware?"}
      ]
    }
]
```