# Is P20 steel a suitable material for inner tray injection molding tools?

## Question

 We just kicked off a new 2026 mass production project for custom ESD plastic component inner trays, with a total annual order volume of 1.2 million units across 8 different tray SKUs. Our current tier 1 mold supplier submitted a proposal using P20 steel for all 8 inner tray mold cavities, but we ran into 3 unplanned mold cracking incidents with a P20 tool for a similar tray line 6 months ago that caused 12 days of production delay and 7% scrap rate for that batch. Now my team is stuck during the incoming material audit: I don’t have clear, standardized pass/fail rules to confirm if the supplied P20 billet is genuine, properly pre-hardened, and fully fit for this high-volume inner tray use case, rather than being a lower cost recycled steel substitute. I also can’t justify to my project team whether approving P20 for these inner tray molds will lead to hidden quality risks or unnecessary overspend. What practical, actionable checks and decision frameworks can we use right now to resolve this dilemma? 

## Answers
                            
### Answer 1 — Best Answer

First, the root of your past P20 mold cracking issue for inner trays almost never comes from the base P20 grade itself, but from unvetted incoming material that fails to meet the standardized pre-hardening specification. Most low-cost non-conforming P20 billets sold in the 2026 market are recycled steel re-melted without strict desulfurization and degassing, which leaves scattered micro inclusions inside the steel matrix that become crack initiation points under repeated injection pressure cycles, especially for inner tray molds with thin rib features that create uneven stress distribution.

For immediate incoming material verification during your ongoing audit, run 3 sequential checks that require no third-party lab outsourcing. First, use a portable Rockwell hardness tester to test 5 random points across each P20 billet surface: **conforming P20 for inner tray molds must deliver a consistent 28-32 HRC hardness with no more than ±1.5 HRC deviation across all test points**. Any deviation larger than that means the steel did not go through proper integral pre-hardening, and will warp unevenly after 10,000 to 20,000 shots. Second, do a quick spark test against a reference sample of certified P20: non-conforming low-grade P20 will produce far more scattered, bright spark branches instead of the short, uniform orange spark pattern of standard P20. Third, cross check the material mill certificate number against the steel producer’s public database, which most formal P20 suppliers have updated to 2026 blockchain traceability systems for free verification.

For the use case of your 1.2 million annual inner tray volume, P20 is fully fit for purpose as long as it passes all 3 checks, as standard P20 has a documented 300,000 minimum shot life for general inner tray geometries with no sharp corners or ultra-thin walls. The common overspend mistake many teams make here is upgrading to fully hardened S136 steel for non-special inner trays that have no corrosive material contact, which adds 45% to 60% of upfront tool cost with no matching performance gain for this production volume.

To prevent repeat incidents long term, add 2 fixed clauses to all future P20 inner tray mold contracts. **The first clause requires the supplier to reserve 10mm x 10mm test coupon cut from the exact same P20 billet used for the mold, which your QA team can archive and re-test any time if mold performance shows abnormal signs during mass production**. The second clause sets a clear 12-month warranty coverage for any P20 material related mold failure, which eliminates unplanned maintenance cost for the full projected lifecycle of this inner tray project. You can also arrange a 24-hour continuous shot test on the first sample mold after T1, to confirm no uneven stress or micro crack forms after 2000 consecutive shots before full production ramp up.

For projects with inner tray volumes over 3 million units annually, you can choose P20 with a surface nitriding treatment to extend tool life to 800,000 shots, which only adds 8% of total tool cost and delivers far better cost performance than switching to full hardened steel. **All these checks and rules are aligned with 2026 mainstream injection molding industry standards for general inner tray production, no extra custom testing or over-spec investment is required**.

**status:** accepted
**Author:** Eric Zhao
**Date:** 2026-10-18

### Answer 2

All incoming P20 billet inspection for inner tray molds should have clear defect classification mapped to corrective actions, instead of vague pass/fail labels. Any P20 sample that shows hardness deviation over 2 HRC should be marked as non-conforming directly, with no secondary negotiation allowed. For inner tray molds, P20 related defects can be separated into 3 ranks: minor defects that only require surface polishing, medium defects that need full stress relief annealing before machining, and critical defects that force full billet replacement.

All P20 test data must be logged into the IQC system with timestamp and operator signature, so any mold failure later can be traced back to the exact incoming inspection record. Teams can also add a 10% random sample pull for destructive microstructure test for every 10 batches of incoming P20 material, to catch low-concentration micro inclusions that portable hardness testers cannot pick up easily.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-10-18

### Answer 3

P20 steel for inner tray molds has a proven maintenance cycle that can be pre-planned to avoid unplanned downtime. For standard inner tray geometries with no deep undercuts, P20 molds only require a full disassembly, cleaning and stress relief annealing after every 120,000 shots, which takes no more than 8 working hours and can be arranged during scheduled production gaps.

Avoid running P20 inner tray molds at injection pressure over 120 bar continuously, as that will accelerate stress accumulation inside the mold steel and cut projected tool life by nearly 40%. Regular surface stoning on the cavity surface every 20,000 shots will also prevent plastic residue buildup that causes uneven wear on the inner tray edge features, keeping part dimensional consistency for the full tool lifecycle.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-10-18

### Answer 4

P20 inner tray molds support far higher production line efficiency than most low-grade unhardened steel alternatives. The consistent hardness of certified P20 allows for faster cycle time optimization, as there is no need to add extra cooling waiting time to avoid mold surface deformation.

For general PP or ABS inner trays, P20 molds can run at a 28 second full cycle time, compared to 38 seconds for unhardened 45# steel molds, which lifts total line output by more than 25% without any extra machine investment. P20 also has excellent compatibility with automated part picking systems, as the mold cavity surface will not develop sharp burrs easily after long run periods that can scratch the inner tray edges and trigger unplanned line stops.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-10-18

### Answer 5

Using certified P20 for inner tray molds eliminates most tolerance stack-up issues that happen at mass assembly stage. The dimensional stability of properly pre-hardened P20 ensures that all inner tray cavity dimensions stay within ±0.02mm tolerance for over 200,000 shots, so every produced inner tray will have consistent pocket depth and edge flatness that matches the original 2D drawing specification.

This removes the need for secondary manual sorting for parts that do not fit the automated assembly fixture, which can cut assembly line scrap rate by around 6% for high volume projects. For inner trays that are designed to hold precision electronic components, the consistent flatness from P20 molds also prevents component tilting during assembly that causes functional failure later.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-10-18

### Answer 6

P20 steel’s good machinability opens up more flexible mold design options for inner tray projects. Since P20 can be machined to a very smooth surface finish without hard spots, gate location for inner tray molds can be placed at the invisible bottom edge of the tray instead of the visible top surface, which removes the need for secondary gate trimming operation on every produced part.

P20 also supports proper cooling line layout that can be drilled very close to the cavity surface without risk of steel cracking, which delivers even temperature distribution across the full inner tray geometry and eliminates common warp issues on the long edge of thin wall trays. For inner trays with multiple small pockets, P20 can also support small vent slots machined directly on the cavity insert without deformation.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-10-18

### Answer 7

Clear P20 material verification milestones should be added to your inner tray project timeline to avoid unexpected delay. The P20 incoming inspection should be completed within 3 working days right after the mold supplier receives the steel billet, before any CNC machining operation starts, so no working hours are wasted on processing non-conforming material.

The P20 test coupon sign off can be arranged as a formal checkpoint before T1 sample production, so both parties confirm material qualification before any sample is produced. Any P20 material related change request must go through formal change management process, with full impact assessment on tool cost, lead time and projected shot life submitted before approval. This will keep the 2026 inner tray project delivery on track without unplanned overruns.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-10-18

### Answer 8

P20 steel for inner tray molds has optimized machining parameters that can cut total mold manufacturing time by nearly 20% compared to pre-hardened H13 steel. Standard P20 can be milled at 1200 RPM cutting speed with a 0.3mm feed rate, which leaves a surface finish of Ra 0.8 directly after roughing and finishing, requiring only minimal manual polishing work afterwards.

Fixture design for P20 billet machining is also far simpler, as the material has very low machining stress that will not warp or shift during cutting, so no extra customized heavy duty fixture is required. This also reduces the risk of dimensional error during mold machining, so the final inner tray cavity dimension will match drawing specification on the first run, no secondary rework is needed.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-10-18

### Answer 9

The cost performance ratio of P20 for inner tray molds stands out clearly when you calculate total lifecycle cost instead of just upfront tool cost. Standard certified P20 steel is only 15% more expensive than common unhardened 45# steel, but delivers 5 times longer tool life, which brings down the per unit mold amortization cost significantly for mass production inner tray projects.

For inner trays made of general ABS, PP or even recycled engineering plastic, P20 has more than enough wear resistance to meet production requirements, and there is no need to select higher cost specialty steel unless the tray material contains more than 20% glass fiber additive. Even for glass fiber filled inner trays, P20 with a 0.02mm surface chrome plating can deliver 300,000 shot life at less than 30% extra total tool cost.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-10-18

### Answer 10

P20 inner tray molds have a very wide stable processing window that reduces the risk of common part defects. Unlike unhardened steel molds that deform easily when process parameters drift slightly, P20 molds can absorb minor fluctuations in melt temperature, injection pressure and cooling time without changing cavity dimension, so the process team does not need to make frequent adjustments to keep part quality consistent.

This greatly reduces the rate of common inner tray defects including sink marks on the pocket bottom, warped long edges, and flash on the parting line, which cuts overall production scrap rate by around 4% during long run mass production. The wide process window also makes it far easier to train new machine operators to run the inner tray line, no highly skilled senior technician is required for daily production operations.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-10-18

## Related Resources

- [Injection Molding Q&A](https://www.jaterson.com/qa/injection-molding/)
- [Plastic Injection Molding](https://www.jaterson.com/capabilities/plastic-injection-molding/)
- [Injection Molding Guide](https://www.jaterson.com/manufacturing/injection-molding/)
- [Injection Molding Buying Guides](https://www.jaterson.com/buying/injection-molding/)
- [Products](https://www.jaterson.com/products/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Injection Molding](https://www.jaterson.com/knowledge/injection-molding/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "Is P20 steel a suitable material for inner tray injection molding tools?",
        "text": "We just kicked off a new 2026 mass production project for custom ESD plastic component inner trays, with a total annual order volume of 1.2 million units across 8 different tray SKUs. Our current tier 1 mold supplier submitted a proposal using P20 steel for all 8 inner tray mold cavities, but we ran into 3 unplanned mold cracking incidents with a P20 tool for a similar tray line 6 months ago that caused 12 days of production delay and 7% scrap rate for that batch. Now my team is stuck during the incoming material audit: I don’t have clear, standardized pass/fail rules to confirm if the supplied P20 billet is genuine, properly pre-hardened, and fully fit for this high-volume inner tray use case, rather than being a lower cost recycled steel substitute. I also can’t justify to my project team whether approving P20 for these inner tray molds will lead to hidden quality risks or unnecessary overspend. What practical, actionable checks and decision frameworks can we use right now to resolve this dilemma?",
        "answerCount": 10,
        "upvoteCount": 9,
        "datePublished": "2026-10-18T00:42:14Z",
        "dateModified": "2026-10-18T00:43:40Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "First, the root of your past P20 mold cracking issue for inner trays almost never comes from the base P20 grade itself, but from unvetted incoming material that fails to meet the standardized pre-hardening specification. Most low-cost non-conforming P20 billets sold in the 2026 market are recycled steel re-melted without strict desulfurization and degassing, which leaves scattered micro inclusions inside the steel matrix that become crack initiation points under repeated injection pressure cycles, especially for inner tray molds with thin rib features that create uneven stress distribution. For immediate incoming material verification during your ongoing audit, run 3 sequential checks that require no third-party lab outsourcing. First, use a portable Rockwell hardness tester to test 5 random points across each P20 billet surface: conforming P20 for inner tray molds must deliver a consistent 28-32 HRC hardness with no more than ±1.5 HRC deviation across all test points . Any deviation larger than that means the steel did not go through proper integral pre-hardening, and will warp unevenly after 10,000 to 20,000 shots. Second, do a quick spark test against a reference sample of certified P20: non-conforming low-grade P20 will produce far more scattered, bright spark branches instead of the short, uniform orange spark pattern of standard P20. Third, cross check the material mill certificate number against the steel producer’s public database, which most formal P20 suppliers have updated to 2026 blockchain traceability systems for free verification. For the use case of your 1.2 million annual inner tray volume, P20 is fully fit for purpose as long as it passes all 3 checks, as standard P20 has a documented 300,000 minimum shot life for general inner tray geometries with no sharp corners or ultra-thin walls. The common overspend mistake many teams make here is upgrading to fully hardened S136 steel for non-special inner trays that have no corrosive material contact, which adds 45% to 60% of upfront tool cost with no matching performance gain for this production volume. To prevent repeat incidents long term, add 2 fixed clauses to all future P20 inner tray mold contracts. The first clause requires the supplier to reserve 10mm x 10mm test coupon cut from the exact same P20 billet used for the mold, which your QA team can archive and re-test any time if mold performance shows abnormal signs during mass production . The second clause sets a clear 12-month warranty coverage for any P20 material related mold failure, which eliminates unplanned maintenance cost for the full projected lifecycle of this inner tray project. You can also arrange a 24-hour continuous shot test on the first sample mold after T1, to confirm no uneven stress or micro crack forms after 2000 consecutive shots before full production ramp up. For projects with inner tray volumes over 3 million units annually, you can choose P20 with a surface nitriding treatment to extend tool life to 800,000 shots, which only adds 8% of total tool cost and delivers far better cost performance than switching to full hardened steel. All these checks and rules are aligned with 2026 mainstream injection molding industry standards for general inner tray production, no extra custom testing or over-spec investment is required .",
            "upvoteCount": 9,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#acceptedAnswer",
            "datePublished": "2026-10-18T01:28:12Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "All incoming P20 billet inspection for inner tray molds should have clear defect classification mapped to corrective actions, instead of vague pass/fail labels. Any P20 sample that shows hardness deviation over 2 HRC should be marked as non-conforming directly, with no secondary negotiation allowed. For inner tray molds, P20 related defects can be separated into 3 ranks: minor defects that only require surface polishing, medium defects that need full stress relief annealing before machining, and critical defects that force full billet replacement. All P20 test data must be logged into the IQC system with timestamp and operator signature, so any mold failure later can be traced back to the exact incoming inspection record. Teams can also add a 10% random sample pull for destructive microstructure test for every 10 batches of incoming P20 material, to catch low-concentration micro inclusions that portable hardness testers cannot pick up easily.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-2",
            "datePublished": "2026-10-18T01:21:57Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "P20 steel for inner tray molds has a proven maintenance cycle that can be pre-planned to avoid unplanned downtime. For standard inner tray geometries with no deep undercuts, P20 molds only require a full disassembly, cleaning and stress relief annealing after every 120,000 shots, which takes no more than 8 working hours and can be arranged during scheduled production gaps. Avoid running P20 inner tray molds at injection pressure over 120 bar continuously, as that will accelerate stress accumulation inside the mold steel and cut projected tool life by nearly 40%. Regular surface stoning on the cavity surface every 20,000 shots will also prevent plastic residue buildup that causes uneven wear on the inner tray edge features, keeping part dimensional consistency for the full tool lifecycle.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-3",
            "datePublished": "2026-10-18T01:19:00Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "P20 inner tray molds support far higher production line efficiency than most low-grade unhardened steel alternatives. The consistent hardness of certified P20 allows for faster cycle time optimization, as there is no need to add extra cooling waiting time to avoid mold surface deformation. For general PP or ABS inner trays, P20 molds can run at a 28 second full cycle time, compared to 38 seconds for unhardened 45# steel molds, which lifts total line output by more than 25% without any extra machine investment. P20 also has excellent compatibility with automated part picking systems, as the mold cavity surface will not develop sharp burrs easily after long run periods that can scratch the inner tray edges and trigger unplanned line stops.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-4",
            "datePublished": "2026-10-18T01:11:47Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Using certified P20 for inner tray molds eliminates most tolerance stack-up issues that happen at mass assembly stage. The dimensional stability of properly pre-hardened P20 ensures that all inner tray cavity dimensions stay within ±0.02mm tolerance for over 200,000 shots, so every produced inner tray will have consistent pocket depth and edge flatness that matches the original 2D drawing specification. This removes the need for secondary manual sorting for parts that do not fit the automated assembly fixture, which can cut assembly line scrap rate by around 6% for high volume projects. For inner trays that are designed to hold precision electronic components, the consistent flatness from P20 molds also prevents component tilting during assembly that causes functional failure later.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-5",
            "datePublished": "2026-10-18T01:04:58Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "P20 steel’s good machinability opens up more flexible mold design options for inner tray projects. Since P20 can be machined to a very smooth surface finish without hard spots, gate location for inner tray molds can be placed at the invisible bottom edge of the tray instead of the visible top surface, which removes the need for secondary gate trimming operation on every produced part. P20 also supports proper cooling line layout that can be drilled very close to the cavity surface without risk of steel cracking, which delivers even temperature distribution across the full inner tray geometry and eliminates common warp issues on the long edge of thin wall trays. For inner trays with multiple small pockets, P20 can also support small vent slots machined directly on the cavity insert without deformation.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-6",
            "datePublished": "2026-10-18T01:04:22Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Clear P20 material verification milestones should be added to your inner tray project timeline to avoid unexpected delay. The P20 incoming inspection should be completed within 3 working days right after the mold supplier receives the steel billet, before any CNC machining operation starts, so no working hours are wasted on processing non-conforming material. The P20 test coupon sign off can be arranged as a formal checkpoint before T1 sample production, so both parties confirm material qualification before any sample is produced. Any P20 material related change request must go through formal change management process, with full impact assessment on tool cost, lead time and projected shot life submitted before approval. This will keep the 2026 inner tray project delivery on track without unplanned overruns.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-7",
            "datePublished": "2026-10-18T01:02:35Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "P20 steel for inner tray molds has optimized machining parameters that can cut total mold manufacturing time by nearly 20% compared to pre-hardened H13 steel. Standard P20 can be milled at 1200 RPM cutting speed with a 0.3mm feed rate, which leaves a surface finish of Ra 0.8 directly after roughing and finishing, requiring only minimal manual polishing work afterwards. Fixture design for P20 billet machining is also far simpler, as the material has very low machining stress that will not warp or shift during cutting, so no extra customized heavy duty fixture is required. This also reduces the risk of dimensional error during mold machining, so the final inner tray cavity dimension will match drawing specification on the first run, no secondary rework is needed.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-8",
            "datePublished": "2026-10-18T01:02:05Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The cost performance ratio of P20 for inner tray molds stands out clearly when you calculate total lifecycle cost instead of just upfront tool cost. Standard certified P20 steel is only 15% more expensive than common unhardened 45# steel, but delivers 5 times longer tool life, which brings down the per unit mold amortization cost significantly for mass production inner tray projects. For inner trays made of general ABS, PP or even recycled engineering plastic, P20 has more than enough wear resistance to meet production requirements, and there is no need to select higher cost specialty steel unless the tray material contains more than 20% glass fiber additive. Even for glass fiber filled inner trays, P20 with a 0.02mm surface chrome plating can deliver 300,000 shot life at less than 30% extra total tool cost.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-9",
            "datePublished": "2026-10-18T01:00:46Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "P20 inner tray molds have a very wide stable processing window that reduces the risk of common part defects. Unlike unhardened steel molds that deform easily when process parameters drift slightly, P20 molds can absorb minor fluctuations in melt temperature, injection pressure and cooling time without changing cavity dimension, so the process team does not need to make frequent adjustments to keep part quality consistent. This greatly reduces the rate of common inner tray defects including sink marks on the pocket bottom, warped long edges, and flash on the parting line, which cuts overall production scrap rate by around 4% during long run mass production. The wide process window also makes it far easier to train new machine operators to run the inner tray line, no highly skilled senior technician is required for daily production operations.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/p20-steel-suitable-inner-tray-injection-molding-tools.html#suggestedAnswer-10",
            "datePublished": "2026-10-18T00:43:40Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Injection Molding Q&A", "item": "https://www.jaterson.com/qa/injection-molding/"}          ,{"@type": "ListItem", "position": 4, "name": "Is P20 steel a suitable material for inner tray injection molding tools?"}
      ]
    }
]
```