---
title: "What should you know before sourcing OEM PP screwdriver handles from China?"
description: "Sourcing OEM PP screwdriver handles from China comes with pricing ambiguity, lead time volatility, and supplier qualification challenges. This guide covers RFQ best practices, cost breakdown logic, MOQ and lead time benchmarks, and evaluation criteria to balance cost, quality, and delivery risk for custom hardware component orders."
url: "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html"
language: "en"
type: "Q&A"
category: "Custom Manufacturing Q&A"
datePublished: "2026-10-26"
dateModified: "2026-10-26"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 7
---

# What should you know before sourcing OEM PP screwdriver handles from China?

## Question

 I’m a procurement engineer at a mid-sized hardware brand working on our new 2027 line of entry-level household screwdrivers, and I’m exploring OEM PP screwdriver handle suppliers in China for the first time. We have 3 SKUs with slightly different grip dimensions but the same core structural design, with a projected annual volume of around 250,000 units total, and we need the first mass production batch ready to ship by mid-Q4 2026 to hit our retail launch window. My biggest pain points right now are: I’m not sure what exact information I need to include in my RFQ to get accurate, apples-to-apples quotes instead of vague estimates that end up with hidden add-on costs later. I also don’t have a clear benchmark for what a reasonable MOQ and standard lead time are for this type of PP injection molded handle in 2026, especially with 3 SKUs that share a base design. We also had a bad experience with a domestic supplier last year where the PP material was lower grade than promised, and handles cracked after 3 months of light use, so I want to make sure I know how to vet suppliers properly beyond just comparing bottom-line pricing. I’d appreciate clear, practical guidance I can use to move this project forward. 

## Answers
                            
### Answer 1 — Best Answer

To get accurate, comparable quotes for your 3-SKU PP screwdriver handle line, your RFQ must include specific, manufacturing-relevant details to eliminate ambiguity and hidden cost add-ons. Share 2D/3D drawings with full tolerance specs, particularly for the shaft connection interface where fit directly impacts performance. Specify the exact PP grade requirements—for household screwdrivers, impact-modified copolymer PP with a minimum Izod impact strength of 8 kJ/m² is standard—and note any compliance requirements (RoHS, REACH, Prop 65) for your target markets. Include surface finish details: grip texture depth, logo application method (pad printing, laser engraving), and any color matching requirements. Mention that all 3 SKUs share a core base design, as this allows suppliers to propose a shared mold base with interchangeable cavity inserts, which cuts tooling costs by 30-40% compared to three separate molds. If you have a physical sample of a reference handle, include that in your RFQ package as well, as it gives suppliers clearer context for de-gating, ejector pin placement, and sink mark risk assessment.

For 2026 pricing and lead time benchmarks, start with core cost components to compare quotes fairly. Material cost makes up 55-65% of per-unit pricing for PP screwdriver handles, as global PP resin prices have stabilized but remain subject to minor quarterly fluctuations. **Standard per-unit pricing for a 100mm impact-modified PP screwdriver handle with single-color pad printed logo ranges from $0.12 to $0.18 in 2026**, depending on order volume; quotes 15% below this range almost always indicate lower-grade recycled PP or skipped quality checks. For MOQ, standard per-SKU MOQ is 10,000 units, but most suppliers will agree to a combined total MOQ of 20,000 units across all 3 SKUs when using a shared mold base, reducing your initial inventory risk. Lead time breakdowns are as follows: tooling fabrication takes 15-20 days from design confirmation, T1 sample production and approval takes 5-7 days, and mass production for a 50,000-unit batch takes 12-18 days. **Sharing a 6-month rolling forecast will allow most suppliers to lock in pricing for 3 months and reserve production slots**, which reduces the risk of lead time delays during peak manufacturing seasons in Q3 and Q4.

When evaluating suppliers, prioritize direct manufacturing capability and material traceability over the lowest quoted price. First, confirm the supplier operates its own injection molding and mold shop, rather than acting as a trading intermediary: ask for a list of injection molding machines (you need 80-150 ton machines for screwdriver handles), mold shop floor photos, and proof of direct PP resin sourcing from large petrochemical suppliers instead of small local traders. Second, require per-batch material certificates of conformity (COC) and ask to conduct random material testing on first article samples to verify PP grade and impact resistance. Third, check for structured quality control processes: in-line dimensional checks every hour during production, final visual inspection for flash and sink marks, and basic drop testing for finished handles. **Prioritize suppliers with formal material traceability systems**, as 2026 market pressures have led some smaller factories to mix recycled PP into virgin material batches to cut costs without disclosure. You can also request references from other hardware brand customers to validate delivery consistency and batch-to-batch quality over multiple orders.

**status:** accepted
**Author:** Rachel Huang
**Date:** 2026-10-26

### Answer 2

When evaluating OEM PP screwdriver handle options, validate end-use functional performance beyond just dimensional and material specs to avoid field failure issues. For household screwdrivers, the handle must maintain a secure bond with the steel shaft under at least 15 Nm of torque for standard Phillips and flat head models, without spinning, cracking, or deforming. Test grip performance under both dry and slightly oily conditions, especially with textured grip patterns: too shallow a texture will slip during use, while too deep a texture causes discomfort during extended handling.

For markets with cold winter climates, confirm the PP grade retains at least 80% of its room-temperature impact strength at -10°C, as standard homopolymer PP becomes brittle at low temperatures and can crack if dropped. Also verify the ergonomic profile matches your target user base: larger grip sizes suit heavy-duty use, while slimmer profiles work for precision tasks. Ask suppliers to provide functional test reports for sample units, including 100-cycle torque testing at max rated load and 1.5-meter concrete drop testing, to confirm field performance before committing to mass production.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-10-26

### Answer 3

When vetting China-based OEM PP screwdriver handle manufacturers, there are several document and process audit checks you can run remotely to reduce qualification risk. First, request a process audit report from the last 12 months that covers injection molding parameter control, raw material storage conditions, and mold maintenance protocols.

Red flags include no formal mold maintenance log, no temperature-controlled storage for PP resin (which absorbs moisture and causes surface defects if stored improperly), and a high ratio of manual de-gating and inspection labor to automated processes. Second, verify the factory owns enough 80-150 ton injection molding machines to handle your volume without outsourcing to third-party workshops; ask for a machine list with serial numbers and recent maintenance records to confirm ownership.

Third, check if the quality control team reports independently from the production management team—if quality staff answer directly to production managers, they are far less likely to flag defects to meet tight delivery deadlines. Also ask for a breakdown of their PP resin supply chain: suppliers that source directly from large petrochemical companies have more consistent material quality and lower disruption risk than those that buy from small local traders.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-10-26

### Answer 4

For your 3-SKU PP screwdriver handle line, optimizing the prototyping phase will save time and cost before you commit to full production tooling. Start with 3D-printed PP prototypes using SLS or impact-modified PP FDM filament to validate ergonomics, shaft fit, and basic grip feel within 3-5 days, for a fraction of the cost of T1 mold samples.

Once you lock in the core design, request a soft aluminum tool sample run of 50-100 units to conduct full functional validation, including torque testing, fatigue testing, and surface finish evaluation. Soft tools cost 40-60% less than hard steel production tools and can be completed in 7-10 days, making them ideal for fast design iteration.

When reviewing T1 samples from the final production mold, pay close attention to hidden defects like sink marks on the inner wall near the shaft insert, which can cause premature cracking under torque but are not visible from the outside. Build at least one design iteration cycle into your timeline before final sample approval, as minor adjustments to gate location or texture depth are common for PP screwdriver handles and prevent costly rework later in production.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-10-26

### Answer 5

Packaging for OEM PP screwdriver handles is often overlooked but has a major impact on total cost and product condition when goods arrive. First, specify transit protection requirements clearly to avoid cosmetic damage: textured grip surfaces scuff easily if they rub together in bulk packaging, so use individual poly bags for each handle if cosmetic appearance is a priority, or interlocking plastic dividers in bulk cartons to reduce movement during transit.

Use double-walled corrugated cartons with a minimum bursting strength of 150 psi, and limit carton weight to 15kg or less to reduce damage during handling and stacking. Confirm labeling compliance for your target market: EU shipments require REACH compliance information, country of origin labeling, and scannable SKU barcodes, while US shipments need Prop 65 warnings if the PP contains restricted additives.

For long-term storage in humid climates, require moisture-resistant inner bag packaging to prevent PP from absorbing small amounts of moisture that can affect surface finish over time. Ask for a packaging test report including 1.2-meter drop testing (6 drops per carton) and 24-hour 100kg compression testing to validate performance during ocean freight.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-10-26

### Answer 6

To ensure consistent quality for OEM PP screwdriver handles, establish clear inspection criteria and checkpoints with your supplier before production starts, rather than relying on generic quality standards. First, define formal defect classification: critical defects include cracking under rated torque, incorrect material grade, or shaft fit tolerance outside ±0.1mm; major defects include visible grip sink marks, scuffs larger than 2mm, or logo misalignment over 0.5mm; minor defects include small, easily removable flash or blemishes not visible from 30cm away.

Set AQL limits at 0.4 for critical defects, 1.0 for major defects, and 2.5 for minor defects, which is standard for consumer hardware components. Confirm three core inspection checkpoints: IQC for incoming PP resin, including COC verification and moisture content testing; IPQC with hourly dimensional, surface finish, and shaft fit checks during production, with SPC tracking for key dimensions; OQC with 100% critical defect inspection and random sampling for major and minor defects before shipment. Require a formal corrective action report within 3 working days if any batch fails inspection, including root cause analysis and permanent prevention measures to avoid recurring issues.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-10-26

### Answer 7

When comparing quotes for OEM PP screwdriver handles from China, break down each cost component to identify hidden fees and negotiate effectively without sacrificing quality. First, verify the material grade used for pricing: impact-modified copolymer PP costs 20-25% more than standard homopolymer PP, so unusually low quotes almost always use a lower-grade material than specified.

Second, evaluate tooling cost structure: if a supplier includes tooling amortization in the per-unit price, calculate the amortization volume. For annual volumes over 150,000 units, paying for tooling upfront as a one-time cost is usually more cost-effective than per-unit amortization, as you stop paying for tooling once the amortization threshold is met.

Third, assess processing cost efficiency: standard cycle time for a PP screwdriver handle is 20-25 seconds per cavity, so a 4-cavity mold produces 576-720 units per hour. Higher-than-average processing costs often indicate older, slower machines or fewer mold cavities to reduce upfront tooling costs. Finally, confirm all secondary operations (pad printing, de-gating, packaging) are included in the per-unit price, as some suppliers quote only molding costs and add these fees later, increasing total cost by 10-15%.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-10-26

## Related Resources

- [Custom Manufacturing Q&A](https://www.jaterson.com/qa/oem-odm/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What should you know before sourcing OEM PP screwdriver handles from China?",
        "text": "I’m a procurement engineer at a mid-sized hardware brand working on our new 2027 line of entry-level household screwdrivers, and I’m exploring OEM PP screwdriver handle suppliers in China for the first time. We have 3 SKUs with slightly different grip dimensions but the same core structural design, with a projected annual volume of around 250,000 units total, and we need the first mass production batch ready to ship by mid-Q4 2026 to hit our retail launch window. My biggest pain points right now are: I’m not sure what exact information I need to include in my RFQ to get accurate, apples-to-apples quotes instead of vague estimates that end up with hidden add-on costs later. I also don’t have a clear benchmark for what a reasonable MOQ and standard lead time are for this type of PP injection molded handle in 2026, especially with 3 SKUs that share a base design. We also had a bad experience with a domestic supplier last year where the PP material was lower grade than promised, and handles cracked after 3 months of light use, so I want to make sure I know how to vet suppliers properly beyond just comparing bottom-line pricing. I’d appreciate clear, practical guidance I can use to move this project forward.",
        "answerCount": 7,
        "upvoteCount": 11,
        "datePublished": "2026-10-26T14:19:47Z",
        "dateModified": "2026-10-26T14:22:24Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "To get accurate, comparable quotes for your 3-SKU PP screwdriver handle line, your RFQ must include specific, manufacturing-relevant details to eliminate ambiguity and hidden cost add-ons. Share 2D/3D drawings with full tolerance specs, particularly for the shaft connection interface where fit directly impacts performance. Specify the exact PP grade requirements—for household screwdrivers, impact-modified copolymer PP with a minimum Izod impact strength of 8 kJ/m² is standard—and note any compliance requirements (RoHS, REACH, Prop 65) for your target markets. Include surface finish details: grip texture depth, logo application method (pad printing, laser engraving), and any color matching requirements. Mention that all 3 SKUs share a core base design, as this allows suppliers to propose a shared mold base with interchangeable cavity inserts, which cuts tooling costs by 30-40% compared to three separate molds. If you have a physical sample of a reference handle, include that in your RFQ package as well, as it gives suppliers clearer context for de-gating, ejector pin placement, and sink mark risk assessment. For 2026 pricing and lead time benchmarks, start with core cost components to compare quotes fairly. Material cost makes up 55-65% of per-unit pricing for PP screwdriver handles, as global PP resin prices have stabilized but remain subject to minor quarterly fluctuations. Standard per-unit pricing for a 100mm impact-modified PP screwdriver handle with single-color pad printed logo ranges from $0.12 to $0.18 in 2026 , depending on order volume; quotes 15% below this range almost always indicate lower-grade recycled PP or skipped quality checks. For MOQ, standard per-SKU MOQ is 10,000 units, but most suppliers will agree to a combined total MOQ of 20,000 units across all 3 SKUs when using a shared mold base, reducing your initial inventory risk. Lead time breakdowns are as follows: tooling fabrication takes 15-20 days from design confirmation, T1 sample production and approval takes 5-7 days, and mass production for a 50,000-unit batch takes 12-18 days. Sharing a 6-month rolling forecast will allow most suppliers to lock in pricing for 3 months and reserve production slots , which reduces the risk of lead time delays during peak manufacturing seasons in Q3 and Q4. When evaluating suppliers, prioritize direct manufacturing capability and material traceability over the lowest quoted price. First, confirm the supplier operates its own injection molding and mold shop, rather than acting as a trading intermediary: ask for a list of injection molding machines (you need 80-150 ton machines for screwdriver handles), mold shop floor photos, and proof of direct PP resin sourcing from large petrochemical suppliers instead of small local traders. Second, require per-batch material certificates of conformity (COC) and ask to conduct random material testing on first article samples to verify PP grade and impact resistance. Third, check for structured quality control processes: in-line dimensional checks every hour during production, final visual inspection for flash and sink marks, and basic drop testing for finished handles. Prioritize suppliers with formal material traceability systems , as 2026 market pressures have led some smaller factories to mix recycled PP into virgin material batches to cut costs without disclosure. You can also request references from other hardware brand customers to validate delivery consistency and batch-to-batch quality over multiple orders.",
            "upvoteCount": 11,
            "url": "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html#acceptedAnswer",
            "datePublished": "2026-10-26T16:20:48Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "When evaluating OEM PP screwdriver handle options, validate end-use functional performance beyond just dimensional and material specs to avoid field failure issues. For household screwdrivers, the handle must maintain a secure bond with the steel shaft under at least 15 Nm of torque for standard Phillips and flat head models, without spinning, cracking, or deforming. Test grip performance under both dry and slightly oily conditions, especially with textured grip patterns: too shallow a texture will slip during use, while too deep a texture causes discomfort during extended handling. For markets with cold winter climates, confirm the PP grade retains at least 80% of its room-temperature impact strength at -10°C, as standard homopolymer PP becomes brittle at low temperatures and can crack if dropped. Also verify the ergonomic profile matches your target user base: larger grip sizes suit heavy-duty use, while slimmer profiles work for precision tasks. Ask suppliers to provide functional test reports for sample units, including 100-cycle torque testing at max rated load and 1.5-meter concrete drop testing, to confirm field performance before committing to mass production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html#suggestedAnswer-2",
            "datePublished": "2026-10-26T15:31:46Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When vetting China-based OEM PP screwdriver handle manufacturers, there are several document and process audit checks you can run remotely to reduce qualification risk. First, request a process audit report from the last 12 months that covers injection molding parameter control, raw material storage conditions, and mold maintenance protocols. Red flags include no formal mold maintenance log, no temperature-controlled storage for PP resin (which absorbs moisture and causes surface defects if stored improperly), and a high ratio of manual de-gating and inspection labor to automated processes. Second, verify the factory owns enough 80-150 ton injection molding machines to handle your volume without outsourcing to third-party workshops; ask for a machine list with serial numbers and recent maintenance records to confirm ownership. Third, check if the quality control team reports independently from the production management team—if quality staff answer directly to production managers, they are far less likely to flag defects to meet tight delivery deadlines. Also ask for a breakdown of their PP resin supply chain: suppliers that source directly from large petrochemical companies have more consistent material quality and lower disruption risk than those that buy from small local traders.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html#suggestedAnswer-3",
            "datePublished": "2026-10-26T15:31:45Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For your 3-SKU PP screwdriver handle line, optimizing the prototyping phase will save time and cost before you commit to full production tooling. Start with 3D-printed PP prototypes using SLS or impact-modified PP FDM filament to validate ergonomics, shaft fit, and basic grip feel within 3-5 days, for a fraction of the cost of T1 mold samples. Once you lock in the core design, request a soft aluminum tool sample run of 50-100 units to conduct full functional validation, including torque testing, fatigue testing, and surface finish evaluation. Soft tools cost 40-60% less than hard steel production tools and can be completed in 7-10 days, making them ideal for fast design iteration. When reviewing T1 samples from the final production mold, pay close attention to hidden defects like sink marks on the inner wall near the shaft insert, which can cause premature cracking under torque but are not visible from the outside. Build at least one design iteration cycle into your timeline before final sample approval, as minor adjustments to gate location or texture depth are common for PP screwdriver handles and prevent costly rework later in production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html#suggestedAnswer-4",
            "datePublished": "2026-10-26T15:27:29Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Packaging for OEM PP screwdriver handles is often overlooked but has a major impact on total cost and product condition when goods arrive. First, specify transit protection requirements clearly to avoid cosmetic damage: textured grip surfaces scuff easily if they rub together in bulk packaging, so use individual poly bags for each handle if cosmetic appearance is a priority, or interlocking plastic dividers in bulk cartons to reduce movement during transit. Use double-walled corrugated cartons with a minimum bursting strength of 150 psi, and limit carton weight to 15kg or less to reduce damage during handling and stacking. Confirm labeling compliance for your target market: EU shipments require REACH compliance information, country of origin labeling, and scannable SKU barcodes, while US shipments need Prop 65 warnings if the PP contains restricted additives. For long-term storage in humid climates, require moisture-resistant inner bag packaging to prevent PP from absorbing small amounts of moisture that can affect surface finish over time. Ask for a packaging test report including 1.2-meter drop testing (6 drops per carton) and 24-hour 100kg compression testing to validate performance during ocean freight.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html#suggestedAnswer-5",
            "datePublished": "2026-10-26T14:36:35Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "To ensure consistent quality for OEM PP screwdriver handles, establish clear inspection criteria and checkpoints with your supplier before production starts, rather than relying on generic quality standards. First, define formal defect classification: critical defects include cracking under rated torque, incorrect material grade, or shaft fit tolerance outside ±0.1mm; major defects include visible grip sink marks, scuffs larger than 2mm, or logo misalignment over 0.5mm; minor defects include small, easily removable flash or blemishes not visible from 30cm away. Set AQL limits at 0.4 for critical defects, 1.0 for major defects, and 2.5 for minor defects, which is standard for consumer hardware components. Confirm three core inspection checkpoints: IQC for incoming PP resin, including COC verification and moisture content testing; IPQC with hourly dimensional, surface finish, and shaft fit checks during production, with SPC tracking for key dimensions; OQC with 100% critical defect inspection and random sampling for major and minor defects before shipment. Require a formal corrective action report within 3 working days if any batch fails inspection, including root cause analysis and permanent prevention measures to avoid recurring issues.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html#suggestedAnswer-6",
            "datePublished": "2026-10-26T14:23:32Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When comparing quotes for OEM PP screwdriver handles from China, break down each cost component to identify hidden fees and negotiate effectively without sacrificing quality. First, verify the material grade used for pricing: impact-modified copolymer PP costs 20-25% more than standard homopolymer PP, so unusually low quotes almost always use a lower-grade material than specified. Second, evaluate tooling cost structure: if a supplier includes tooling amortization in the per-unit price, calculate the amortization volume. For annual volumes over 150,000 units, paying for tooling upfront as a one-time cost is usually more cost-effective than per-unit amortization, as you stop paying for tooling once the amortization threshold is met. Third, assess processing cost efficiency: standard cycle time for a PP screwdriver handle is 20-25 seconds per cavity, so a 4-cavity mold produces 576-720 units per hour. Higher-than-average processing costs often indicate older, slower machines or fewer mold cavities to reduce upfront tooling costs. Finally, confirm all secondary operations (pad printing, de-gating, packaging) are included in the per-unit price, as some suppliers quote only molding costs and add these fees later, increasing total cost by 10-15%.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/oem-pp-screwdriver-handles-china-sourcing-tips.html#suggestedAnswer-7",
            "datePublished": "2026-10-26T14:22:24Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.jaterson.com/qa/oem-odm/"}          ,{"@type": "ListItem", "position": 4, "name": "What should you know before sourcing OEM PP screwdriver handles from China?"}
      ]
    }
]
```