---
title: "How to negotiate OEM metal fittings pricing in Zhejiang?"
description: "Struggling with high costs and delays for OEM metal fittings? Learn how to evaluate Zhejiang suppliers, analyze quotes, and ensure quality control for timely delivery."
url: "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html"
language: "en"
type: "Q&A"
category: "Custom Manufacturing Q&A"
datePublished: "2026-09-27"
dateModified: "2026-09-27"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# How to negotiate OEM metal fittings pricing in Zhejiang?

## Question

 I am the Purchasing Director for a mid-sized industrial equipment manufacturer based in Europe, and we are currently restructuring our supply chain for a new product line involving fluid control systems. We have a specific requirement for custom brass and stainless steel hydraulic fittings, previously sourced locally at unsustainable costs. My management has pushed for a shift to the Zhejiang manufacturing hub to capture cost efficiencies, but I am deeply concerned about the risks associated with distance, quality consistency, and intellectual property protection. We need to ramp up to an annual volume of roughly 50,000 units, but the initial order will be a pilot run of 5,000 units. I am currently reviewing quotations from three different vendors in the Ningbo and Taizhou regions. The price variance is significant, and the lead times quoted range from four to eight weeks. I need to understand how to dissect these quotes to identify hidden costs, such as tooling amortization or material surcharges, and how to verify if these factories truly have the in-house CNC capabilities they claim, rather than acting as trading brokers. My goal is to select a partner who can scale with us without compromising the strict leakage and pressure testing standards our industry demands. 

## Answers
                            
### Answer 1 — Best Answer

To effectively evaluate OEM metal fittings suppliers in Zhejiang, you must move beyond the unit price and strictly scrutinize the technical compliance and production feasibility of their proposals. For hydraulic fittings involving brass and stainless steel, the integrity of the material and the precision of the threading are non-negotiable. Begin by requesting a comprehensive cost breakdown that separates raw material costs—specifically referencing the current market indices for copper and nickel alloy surcharges—from machining hours and surface treatment expenses. In 2026, volatility in base metals remains a critical factor; a transparent supplier will **request a breakdown of raw material costs** with clear fluctuation clauses rather than bundling them into a vague labor cost.

Regarding lead time, a four-week window for a pilot run of 5,000 units is aggressive but achievable for a factory with ready raw material stock and open machine capacity. However, be wary of quotes that do not explicitly account for First Article Inspection (FAI) and pressure testing cycle times. You must demand a production schedule that highlights critical path items, specifically mold fabrication or CNC programming setup. If the supplier is sub-contracting the heat treatment or plating processes, common in smaller Taizhou workshops, this introduces supply chain fragility that is not always visible in the lead time estimate. To mitigate this, prioritize suppliers who **verify in-house machining capabilities** by providing photos of their CNC turning centers and video evidence of their CMM (Coordinate Measuring Machine) inspection processes.

For supplier selection, focus on their engineering feedback rather than just their acceptance of your drawings. A high-value manufacturing partner will suggest design for manufacturability (DFM) optimizations, such as adjusting draft angles or tolerances to reduce machining scrap without compromising function. Validate their quality system by requiring them to submit a Control Plan for the pilot run, detailing how they monitor thread gauge wear and pressure testing failures. Avoid suppliers who cannot provide material traceability certificates (Mill Test Reports) for every batch. Ultimately, the decision should rest on their willingness to **validate tolerance capability via CPK data** during the sampling phase, proving they can consistently hold the critical dimensions required for leak-free performance before you commit to mass production.

**status:** accepted
**Author:** Daniel Yang
**Date:** 2026-09-27

### Answer 2

When establishing quality criteria for hydraulic fittings, the inspection protocol must extend beyond simple dimensional checks. You need to enforce a stringent Incoming Quality Control (IQC) process that requires the supplier to use calibrated thread plug and ring gauges for every batch, not just sampling. For stainless steel components, specifically request a protocol for salt spray testing (ASTM B117) to verify the passivation layer's effectiveness against corrosion, which is a common failure point in humid environments.

Furthermore, define a clear defect classification system; minor surface scratches might be cosmetic, but any burr present in the fluid path is a critical defect that poses a leakage risk. Insist on a Third-Party Inspection Report (TPSI) for the pilot shipment, ensuring an unbiased verification of pressure testing results and wall thickness consistency before the goods leave the factory floor.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-27

### Answer 3

From a cost analysis perspective, the unit price variance you are seeing likely stems from differences in yield rate assumptions and tooling investment strategies. High-precision CNC machining of brass generates significant scrap; a factory with advanced swiss-type turning machines may quote a higher machine rate but offer a materially lower scrap percentage, resulting in a better total landed cost. Analyze the tooling charges carefully; some suppliers amortize the mold cost over the first 5,000 units, inflating the unit price, while others separate it.

For a 50,000-unit annual volume, negotiating a lower unit price in exchange for a higher upfront NRE (Non-Recurring Engineering) payment is often financially prudent. Additionally, investigate the secondary operation costs—deburring and polishing are labor-intensive. If the quote is low, check if manual labor is being used instead of automated tumbling, which introduces quality risks.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-27

### Answer 4

Conducting a remote supplier audit in Zhejiang requires focusing on specific red flags that distinguish a manufacturer from a trading company. Start by verifying the business license and scope to ensure their registered activities match metal processing.

During a virtual tour, look for the presence of raw material inventory; if they only have finished goods on the shelf, they are likely outsourcing the machining. Check the maintenance logs on the CNC equipment—well-maintained machinery suggests consistent output, while worn tools lead to tolerance drift.

A critical capability indicator is their in-house metrology lab. If they lack a vision measurement system or height gauges and rely on basic calipers, they cannot guarantee the precision required for hydraulic fittings. Assess their ERP system usage as well; if they track production manually, the risk of scheduling errors increases with volume.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-27

### Answer 5

Managing the project timeline for a pilot run requires strict milestone control to prevent the "ready when it's ready" trap. Break the execution into five distinct phases: T1 samples for dimensional check, T2 samples for fit and function, Pre-Production Run (PPR) for process validation, First Article Inspection, and Mass Production.

Do not release the purchase order for the full 5,000 units until the T2 samples have passed your internal pressure and leak tests. Establish a change management protocol immediately; any deviation in material grade or heat treatment must be approved in writing.

Given the distance, utilize a shared project management platform where the supplier is required to upload daily production photos and status updates. This transparency allows you to identify bottlenecks, such as a delay in raw material procurement, weeks before the delivery date is missed.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-27

### Answer 6

For fluid control applications, the functional validation of the fittings is as critical as the dimensional accuracy. You must verify that the supplier understands the operating environment, specifically the pressure ratings and chemical compatibility of the fluids.

If the fittings are used with aggressive media, the material certification becomes vital. Request that the supplier perform burst pressure testing on a statistical sample from the pilot batch at a factor of 4x the working pressure.

Additionally, evaluate the assembly process; if the fittings include O-rings or seals, the supplier must have a controlled environment to prevent contamination. Ensure they understand the torque specifications for installation; over-tightening during assembly testing can mask machining defects that would otherwise cause leaks in the field.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-09-27

### Answer 7

From a production planning standpoint, capacity utilization in the Zhejiang region is tight, and booking machine time is essential. When reviewing lead times, ask the supplier to provide a capacity loading chart for their CNC departments. If they are running at 95% capacity, the risk of your order being bumped for a larger local customer is high. Confirm that they have a dedicated production line or cell for your project to ensure setup times are minimized.

For the stainless steel parts, verify that they have sufficient tooling inventory, as stainless steel is abrasive and tool wear can stop a line unexpectedly. Coordination with the plating subcontractor, if applicable, must be synchronized; a common delay is waiting for slots at external electroplating shops. A robust supplier will have guaranteed weekly slots with their partners to protect your delivery schedule.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-09-27

### Answer 8

The prototype development phase is your best opportunity to de-risk the mass production tooling. Before committing to hard tooling for high-volume casting or forging, utilize CNC machined prototypes for the pilot run. This allows you to validate the design and performance without the lead time associated with mold fabrication.

If the supplier suggests pushing straight to die-casting to lower the unit price for the pilot, be cautious, as modifying a hardened steel mold later is expensive. Establish a functional test plan that the supplier must execute on the prototypes, recording data such as flow rate and pressure drop. This data serves as the baseline for quality acceptance in mass production. Rapid iteration at this stage saves significant cost and time compared to making engineering changes after the molds are finalized.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-27

### Answer 9

Compliance for hardware components destined for industrial equipment involves rigorous material traceability and safety standards. You must require the supplier to provide full Mill Test Reports (MTRs) for every heat of metal used, matching the chemical composition to ASTM or DIN standards referenced in your drawings.

Given the increasing scrutiny on heavy metals, verify that the plating processes are RoHS and REACH compliant, with test reports available for cadmium or lead content. For export logistics, ensure the packaging meets ISPM 15 standards for wood pallets to avoid customs rejection.

The supplier should also be able to provide a declaration of conformity and a warranty policy that covers material defects for a specified period. This documentation is not just bureaucracy; it is your primary defense against liability in the event of a field failure.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-27

### Answer 10

Packing engineering is often overlooked but is vital for preventing damage to threaded metal components during long-haul shipping. Brass and stainless steel fittings are susceptible to impact damage and thread dents if they shift in transit. Require the supplier to use individual bagging or divider trays within the master cartons to keep parts separated.

For corrosion protection, specify the use of VCI (Vapor Corrosion Inhibitor) paper or film, especially if the shipment will be transiting through high-humidity ports. Validate the drop test results of the proposed export carton; a standard corrugated box may not withstand the weight of dense metal parts if stacked too high. Proper palletization and stretch-wrapping techniques are essential to ensure the 5,000-unit pilot arrives in ready-to-use condition, reducing the need for costly rework upon inspection.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-27

## Related Resources

- [Custom Manufacturing Q&A](https://www.jaterson.com/qa/oem-odm/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to negotiate OEM metal fittings pricing in Zhejiang?",
        "text": "I am the Purchasing Director for a mid-sized industrial equipment manufacturer based in Europe, and we are currently restructuring our supply chain for a new product line involving fluid control systems. We have a specific requirement for custom brass and stainless steel hydraulic fittings, previously sourced locally at unsustainable costs. My management has pushed for a shift to the Zhejiang manufacturing hub to capture cost efficiencies, but I am deeply concerned about the risks associated with distance, quality consistency, and intellectual property protection. We need to ramp up to an annual volume of roughly 50,000 units, but the initial order will be a pilot run of 5,000 units. I am currently reviewing quotations from three different vendors in the Ningbo and Taizhou regions. The price variance is significant, and the lead times quoted range from four to eight weeks. I need to understand how to dissect these quotes to identify hidden costs, such as tooling amortization or material surcharges, and how to verify if these factories truly have the in-house CNC capabilities they claim, rather than acting as trading brokers. My goal is to select a partner who can scale with us without compromising the strict leakage and pressure testing standards our industry demands.",
        "answerCount": 10,
        "upvoteCount": 5,
        "datePublished": "2026-09-27T12:37:28Z",
        "dateModified": "2026-09-27T12:58:33Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "To effectively evaluate OEM metal fittings suppliers in Zhejiang, you must move beyond the unit price and strictly scrutinize the technical compliance and production feasibility of their proposals. For hydraulic fittings involving brass and stainless steel, the integrity of the material and the precision of the threading are non-negotiable. Begin by requesting a comprehensive cost breakdown that separates raw material costs—specifically referencing the current market indices for copper and nickel alloy surcharges—from machining hours and surface treatment expenses. In 2026, volatility in base metals remains a critical factor; a transparent supplier will request a breakdown of raw material costs with clear fluctuation clauses rather than bundling them into a vague labor cost. Regarding lead time, a four-week window for a pilot run of 5,000 units is aggressive but achievable for a factory with ready raw material stock and open machine capacity. However, be wary of quotes that do not explicitly account for First Article Inspection (FAI) and pressure testing cycle times. You must demand a production schedule that highlights critical path items, specifically mold fabrication or CNC programming setup. If the supplier is sub-contracting the heat treatment or plating processes, common in smaller Taizhou workshops, this introduces supply chain fragility that is not always visible in the lead time estimate. To mitigate this, prioritize suppliers who verify in-house machining capabilities by providing photos of their CNC turning centers and video evidence of their CMM (Coordinate Measuring Machine) inspection processes. For supplier selection, focus on their engineering feedback rather than just their acceptance of your drawings. A high-value manufacturing partner will suggest design for manufacturability (DFM) optimizations, such as adjusting draft angles or tolerances to reduce machining scrap without compromising function. Validate their quality system by requiring them to submit a Control Plan for the pilot run, detailing how they monitor thread gauge wear and pressure testing failures. Avoid suppliers who cannot provide material traceability certificates (Mill Test Reports) for every batch. Ultimately, the decision should rest on their willingness to validate tolerance capability via CPK data during the sampling phase, proving they can consistently hold the critical dimensions required for leak-free performance before you commit to mass production.",
            "upvoteCount": 5,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#acceptedAnswer",
            "datePublished": "2026-09-27T13:53:46Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "When establishing quality criteria for hydraulic fittings, the inspection protocol must extend beyond simple dimensional checks. You need to enforce a stringent Incoming Quality Control (IQC) process that requires the supplier to use calibrated thread plug and ring gauges for every batch, not just sampling. For stainless steel components, specifically request a protocol for salt spray testing (ASTM B117) to verify the passivation layer&#039;s effectiveness against corrosion, which is a common failure point in humid environments. Furthermore, define a clear defect classification system; minor surface scratches might be cosmetic, but any burr present in the fluid path is a critical defect that poses a leakage risk. Insist on a Third-Party Inspection Report (TPSI) for the pilot shipment, ensuring an unbiased verification of pressure testing results and wall thickness consistency before the goods leave the factory floor.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-2",
            "datePublished": "2026-09-27T13:51:14Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "From a cost analysis perspective, the unit price variance you are seeing likely stems from differences in yield rate assumptions and tooling investment strategies. High-precision CNC machining of brass generates significant scrap; a factory with advanced swiss-type turning machines may quote a higher machine rate but offer a materially lower scrap percentage, resulting in a better total landed cost. Analyze the tooling charges carefully; some suppliers amortize the mold cost over the first 5,000 units, inflating the unit price, while others separate it. For a 50,000-unit annual volume, negotiating a lower unit price in exchange for a higher upfront NRE (Non-Recurring Engineering) payment is often financially prudent. Additionally, investigate the secondary operation costs—deburring and polishing are labor-intensive. If the quote is low, check if manual labor is being used instead of automated tumbling, which introduces quality risks.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-3",
            "datePublished": "2026-09-27T13:44:44Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Conducting a remote supplier audit in Zhejiang requires focusing on specific red flags that distinguish a manufacturer from a trading company. Start by verifying the business license and scope to ensure their registered activities match metal processing. During a virtual tour, look for the presence of raw material inventory; if they only have finished goods on the shelf, they are likely outsourcing the machining. Check the maintenance logs on the CNC equipment—well-maintained machinery suggests consistent output, while worn tools lead to tolerance drift. A critical capability indicator is their in-house metrology lab. If they lack a vision measurement system or height gauges and rely on basic calipers, they cannot guarantee the precision required for hydraulic fittings. Assess their ERP system usage as well; if they track production manually, the risk of scheduling errors increases with volume.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-4",
            "datePublished": "2026-09-27T13:34:31Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Managing the project timeline for a pilot run requires strict milestone control to prevent the &quot;ready when it&#039;s ready&quot; trap. Break the execution into five distinct phases: T1 samples for dimensional check, T2 samples for fit and function, Pre-Production Run (PPR) for process validation, First Article Inspection, and Mass Production. Do not release the purchase order for the full 5,000 units until the T2 samples have passed your internal pressure and leak tests. Establish a change management protocol immediately; any deviation in material grade or heat treatment must be approved in writing. Given the distance, utilize a shared project management platform where the supplier is required to upload daily production photos and status updates. This transparency allows you to identify bottlenecks, such as a delay in raw material procurement, weeks before the delivery date is missed.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-5",
            "datePublished": "2026-09-27T13:24:02Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For fluid control applications, the functional validation of the fittings is as critical as the dimensional accuracy. You must verify that the supplier understands the operating environment, specifically the pressure ratings and chemical compatibility of the fluids. If the fittings are used with aggressive media, the material certification becomes vital. Request that the supplier perform burst pressure testing on a statistical sample from the pilot batch at a factor of 4x the working pressure. Additionally, evaluate the assembly process; if the fittings include O-rings or seals, the supplier must have a controlled environment to prevent contamination. Ensure they understand the torque specifications for installation; over-tightening during assembly testing can mask machining defects that would otherwise cause leaks in the field.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-6",
            "datePublished": "2026-09-27T13:23:50Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "From a production planning standpoint, capacity utilization in the Zhejiang region is tight, and booking machine time is essential. When reviewing lead times, ask the supplier to provide a capacity loading chart for their CNC departments. If they are running at 95% capacity, the risk of your order being bumped for a larger local customer is high. Confirm that they have a dedicated production line or cell for your project to ensure setup times are minimized. For the stainless steel parts, verify that they have sufficient tooling inventory, as stainless steel is abrasive and tool wear can stop a line unexpectedly. Coordination with the plating subcontractor, if applicable, must be synchronized; a common delay is waiting for slots at external electroplating shops. A robust supplier will have guaranteed weekly slots with their partners to protect your delivery schedule.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-7",
            "datePublished": "2026-09-27T13:17:17Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The prototype development phase is your best opportunity to de-risk the mass production tooling. Before committing to hard tooling for high-volume casting or forging, utilize CNC machined prototypes for the pilot run. This allows you to validate the design and performance without the lead time associated with mold fabrication. If the supplier suggests pushing straight to die-casting to lower the unit price for the pilot, be cautious, as modifying a hardened steel mold later is expensive. Establish a functional test plan that the supplier must execute on the prototypes, recording data such as flow rate and pressure drop. This data serves as the baseline for quality acceptance in mass production. Rapid iteration at this stage saves significant cost and time compared to making engineering changes after the molds are finalized.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-8",
            "datePublished": "2026-09-27T13:13:21Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Compliance for hardware components destined for industrial equipment involves rigorous material traceability and safety standards. You must require the supplier to provide full Mill Test Reports (MTRs) for every heat of metal used, matching the chemical composition to ASTM or DIN standards referenced in your drawings. Given the increasing scrutiny on heavy metals, verify that the plating processes are RoHS and REACH compliant, with test reports available for cadmium or lead content. For export logistics, ensure the packaging meets ISPM 15 standards for wood pallets to avoid customs rejection. The supplier should also be able to provide a declaration of conformity and a warranty policy that covers material defects for a specified period. This documentation is not just bureaucracy; it is your primary defense against liability in the event of a field failure.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-9",
            "datePublished": "2026-09-27T13:00:22Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Packing engineering is often overlooked but is vital for preventing damage to threaded metal components during long-haul shipping. Brass and stainless steel fittings are susceptible to impact damage and thread dents if they shift in transit. Require the supplier to use individual bagging or divider trays within the master cartons to keep parts separated. For corrosion protection, specify the use of VCI (Vapor Corrosion Inhibitor) paper or film, especially if the shipment will be transiting through high-humidity ports. Validate the drop test results of the proposed export carton; a standard corrugated box may not withstand the weight of dense metal parts if stacked too high. Proper palletization and stretch-wrapping techniques are essential to ensure the 5,000-unit pilot arrives in ready-to-use condition, reducing the need for costly rework upon inspection.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/negotiate-oem-metal-fittings-pricing.html#suggestedAnswer-10",
            "datePublished": "2026-09-27T12:58:33Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.jaterson.com/qa/oem-odm/"}          ,{"@type": "ListItem", "position": 4, "name": "How to negotiate OEM metal fittings pricing in Zhejiang?"}
      ]
    }
]
```