title: "What are the must-have items for an OEM RFQ checklist for custom injection molding and hardware parts?"
description: "Navigating incomplete OEM RFQs often leads to hidden cost overruns, unplanned delivery delays, and quality non-conformities for new product launch projects. A structured OEM RFQ checklist standardizes requirement documentation, quote comparison criteria, and supplier qualification rules to cut sourcing risks and accelerate time-to-market."
url: "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html"
language: "en"
type: "Q&A"
category: "Custom Manufacturing Q&A"
datePublished: "2026-08-28"
dateModified: "2026-08-28"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# What are the must-have items for an OEM RFQ checklist for custom injection molding and hardware parts?

## Question

 I’m a project engineer leading the 2026 launch of a new line of power tool accessory sets, which include 7 custom injection molded plastic components and 3 stamped metal hardware parts, all produced via OEM. Last quarter, I ran a similar small-batch OEM project without a standardized RFQ checklist, and it led to multiple costly issues: 2 out of 4 suppliers quoted prices that excluded tooling amortization costs, one supplier failed to account for UL 94 flame resistance compliance required for our US market entry, quoted lead times varied by as much as 4 weeks across vendors with no clear justification, and we ultimately pushed the product launch back 3 weeks due to unplanned sample rework that missed our functional performance specs. This week I plan to send RFQs to 5 pre-vetted injection molding and hardware manufacturing vendors, and I need to build a complete, actionable OEM RFQ checklist to ensure all responses are apples-to-apples, no hidden costs or unstated requirements are missed, and I can evaluate quotes fairly to select the right mass production partner. I want to confirm exactly what mandatory items to include, how to structure requirements to eliminate ambiguous vendor responses, and what key validation points I should add to avoid repeating the same mistakes from my last project. 

## Answers
                            
### Answer 1 — Best Answer

Start the checklist with non-negotiable design and specification confirmation requirements. Mandate that all vendors explicitly confirm full receipt and understanding of 2D/3D CAD files, material grade specifications (including resin type, filler content, metal alloy grade), surface finish requirements, dimensional tolerance limits, and functional performance test standards (such as drop test, load bearing capacity) for each part. Require that any deviation from listed specs is noted as a separate alternative option in the quote, rather than being assumed as part of the base offering, to eliminate misalignment later in the project.

Next, include mandatory cost breakdown requirements to eliminate hidden fees. **Require separate line items for one-time tooling costs, tooling lifespan, unit part cost, secondary processing costs (printing, deburring, assembly), testing and certification fees, packaging costs, and freight terms.** Explicitly ask vendors to note if tooling is exclusive to your project, and what the amortization schedule is if tooling costs are spread across production batches. Also require vendors to state the cost impact of planned future design iterations you may roll out 6 months post-launch based on early customer feedback, to avoid unexpected change fees later.

Then add lead time and production capacity validation clauses. Clearly list your expected sample lead time, first article inspection (FAI) lead time, and mass production lead time for the initial order and subsequent repeat orders. Ask vendors to provide a breakdown of each lead time segment (mold manufacturing, sample production, testing, mass production, packaging) to identify potential bottlenecks. **Require written confirmation that vendors have available production capacity to meet your scheduled launch timeline, and what penalty terms apply for delivery delays outside of force majeure events.** Also ask for the maximum monthly production capacity for each part, to confirm they can support your projected 35% 2026 sales volume growth.

Finally, add supplier qualification criteria to guide post-quote evaluation. Cross-verify that all quoted costs align with 2026 material and processing cost benchmarks: for example, current ABS resin pricing sits at $1.7-1.9 per kg, cold rolled steel at $0.9-1.1 per kg, so unit costs far outside this range should be flagged for clarification. Prioritize vendors that include full IQC, IPQC, and OQC inspection checkpoints in their quote, as well as a clear corrective action process for non-conforming parts. **Only shortlist vendors that can provide documented proof of experience manufacturing similar power tool accessory components for at least 3 years, to reduce the risk of production quality issues.** Eliminate vendors that omit key compliance requirements from their quote, as this indicates they did not fully review your specification documents and will likely lead to rework or compliance failures later.

**status:** accepted
**Author:** Olivia Chen
**Date:** 2026-08-28

### Answer 2

All quotes should include explicit notes on raw material sourcing locations and price validity periods, as 2026 global resin and metal commodity prices are still subject to 5-8% monthly fluctuation for certain grades. Ask vendors to specify if they lock in material pricing for 30, 60, or 90 days post quote submission, and what the adjustment formula is for orders placed after the price validity window ends.

For tooling costs, require vendors to break down mold material (P20, H13, etc.), machining hours, and post-processing costs, so you can verify that the quoted tooling price aligns with the expected lifespan and complexity of your parts. Also ask for the per-unit processing cost breakdown, including machine hourly rate, labor cost, and overhead allocation, to identify if any vendors are inflating overhead costs to compensate for artificially low quoted unit prices.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-08-28

### Answer 3

Add a section to your checklist requiring vendors to submit their proposed defect classification standard for your parts, including acceptable quality limits (AQL) for critical, major, and minor defects that align with your internal quality requirements. Ask for explicit details on all inspection checkpoints: incoming material inspection for raw material grade and composition, in-process inspection for dimensional accuracy after every 100 parts produced, and final outgoing inspection for surface finish, functional performance, and packaging integrity before shipment.

Also require vendors to outline their corrective and preventive action (CAPA) process for non-conforming batches, including response time for quality issues, rework procedures, and root cause analysis documentation requirements, so you can ensure any quality problems are resolved quickly without delaying your production schedule.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-08-28

### Answer 4

Include a requirement for vendors to share their current production schedule load for the next 3 months, so you can confirm that your project will not be deprioritized in favor of larger, higher-volume customer orders. Ask vendors to identify any potential production bottlenecks for your parts, such as limited availability of specific injection molding machine tonnage or metal stamping equipment, and what contingency plans they have in place if those assets are unexpectedly out of service for maintenance.

Also require confirmation that the vendor will assign a dedicated point of contact for your project who can coordinate between engineering, production, and quality teams to resolve any issues within 24 hours, to avoid delays caused by slow cross-department communication.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-08-28

### Answer 5

Add packaging requirements to your RFQ checklist to avoid unplanned damage during transit and non-compliance with regional labeling rules. Require vendors to specify the packaging material type (corrugated box grade, inner cushioning material), maximum carton weight, and stacking load limit for shipping your parts, as well as test data proving the packaging can withstand 1.2m drop tests and 72 hours of high-humidity storage for ocean freight shipments to the US.

Ask for details on labeling content, including part number, lot number, production date, and country of origin marking, to ensure it complies with US customs and retail shelf labeling requirements. Also confirm if the packaging materials are recyclable, as your brand has committed to 100% recyclable shipping packaging for all 2026 product launches.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-08-28

### Answer 6

Include a section in your checklist requiring vendors to disclose any recent third-party manufacturing process audit reports from the past 12 months, as well as any non-conformities identified during those audits and the corrective actions taken to resolve them. Ask vendors to confirm they have no outstanding labor, environmental, or safety violations in their local jurisdiction, as these can lead to unexpected factory shutdowns that delay your order.

Also require vendors to provide references from 2 current customers who produce similar power tool accessory components, so you can verify their track record of on-time delivery and consistent quality over at least a 12 month period. Flag any vendors that refuse to provide audit reports or customer references, as this is a high risk signal of potential capability gaps or compliance issues.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-08-28

### Answer 7

Add requirements for functional validation of pre-production samples to your RFQ checklist, to ensure the parts meet end-use performance requirements before mass production starts. Require vendors to confirm they can conduct all specified functional tests on site, including load bearing tests for the metal hardware components, cycle life tests for moving plastic parts, and flame resistance tests for materials used in high-heat areas of the power tool.

Ask for details on how they will verify that the parts fit correctly with the other components of your power tool accessory set, including whether they can conduct trial assembly with your provided mating parts if requested. Also require confirmation that the parts will meet your expected field lifespan of at least 3 years under normal use conditions, to avoid post-launch product failure and warranty claims.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-08-28

### Answer 8

Make sure your RFQ checklist explicitly lists all mandatory regulatory certifications required for your target markets, including UL 94 for plastic parts, RoHS and REACH compliance for all materials sold in the EU, and FCC requirements if any components include electronic parts. Require vendors to confirm they can provide all necessary test reports and certification documentation from ISO 17025 accredited laboratories, and that all certifications are valid for at least 12 months from the date of your first shipment.

Ask for details on who is responsible for covering certification renewal costs if you continue production after the initial certification expires, and whether the vendor can provide documentation of material composition for all parts to support your product compliance filings with US and EU regulatory bodies. Also confirm that all supply chain documentation is available for customs clearance, including country of origin certificates and material safety data sheets for all materials used.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-08-28

### Answer 9

Include clear requirements for prototype and pre-production sample development in your RFQ checklist, to speed up your design iteration process and reduce pre-production risks. Ask vendors to specify their lead time for rapid prototype samples using 3D printing or soft tooling, if you need to test design changes before finalizing hard tooling for mass production.

Require vendors to provide a detailed sample development timeline, including milestones for first sample submission, functional testing, and revision iteration, as well as the cost for each additional sample revision requested after the first 2 free revisions. Also confirm that the vendor can implement minor design tweaks to tooling within 3 working days, to avoid delaying your launch timeline if you identify small fit or performance issues during sample testing.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-08-28

### Answer 10

Add clear project milestone and change management requirements to your RFQ checklist, to ensure all parties are aligned on expectations throughout the project lifecycle. Require vendors to confirm they will adhere to your specified milestone schedule, including tooling completion, first article inspection (FAI) submission, sample sign-off, and mass production start dates, and that any deviations from the schedule will be communicated at least 3 working days in advance.

Ask for details on their change management process, including the lead time and cost impact of any design or specification changes requested after tooling production starts, to avoid unplanned cost overruns. Also require confirmation that the vendor will provide a full production handover package after sample sign-off, including tooling maintenance records, process parameter documentation, and quality control standards, to ensure consistent production quality across repeat orders.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-08-28

## Related Resources

- [Custom Manufacturing Q&A](https://www.jaterson.com/qa/oem-odm/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What are the must-have items for an OEM RFQ checklist for custom injection molding and hardware parts?",
        "text": "I’m a project engineer leading the 2026 launch of a new line of power tool accessory sets, which include 7 custom injection molded plastic components and 3 stamped metal hardware parts, all produced via OEM. Last quarter, I ran a similar small-batch OEM project without a standardized RFQ checklist, and it led to multiple costly issues: 2 out of 4 suppliers quoted prices that excluded tooling amortization costs, one supplier failed to account for UL 94 flame resistance compliance required for our US market entry, quoted lead times varied by as much as 4 weeks across vendors with no clear justification, and we ultimately pushed the product launch back 3 weeks due to unplanned sample rework that missed our functional performance specs. This week I plan to send RFQs to 5 pre-vetted injection molding and hardware manufacturing vendors, and I need to build a complete, actionable OEM RFQ checklist to ensure all responses are apples-to-apples, no hidden costs or unstated requirements are missed, and I can evaluate quotes fairly to select the right mass production partner. I want to confirm exactly what mandatory items to include, how to structure requirements to eliminate ambiguous vendor responses, and what key validation points I should add to avoid repeating the same mistakes from my last project.",
        "answerCount": 10,
        "upvoteCount": 13,
        "datePublished": "2026-08-28T13:33:05Z",
        "dateModified": "2026-08-28T13:51:16Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "Start the checklist with non-negotiable design and specification confirmation requirements. Mandate that all vendors explicitly confirm full receipt and understanding of 2D/3D CAD files, material grade specifications (including resin type, filler content, metal alloy grade), surface finish requirements, dimensional tolerance limits, and functional performance test standards (such as drop test, load bearing capacity) for each part. Require that any deviation from listed specs is noted as a separate alternative option in the quote, rather than being assumed as part of the base offering, to eliminate misalignment later in the project. Next, include mandatory cost breakdown requirements to eliminate hidden fees. Require separate line items for one-time tooling costs, tooling lifespan, unit part cost, secondary processing costs (printing, deburring, assembly), testing and certification fees, packaging costs, and freight terms. Explicitly ask vendors to note if tooling is exclusive to your project, and what the amortization schedule is if tooling costs are spread across production batches. Also require vendors to state the cost impact of planned future design iterations you may roll out 6 months post-launch based on early customer feedback, to avoid unexpected change fees later. Then add lead time and production capacity validation clauses. Clearly list your expected sample lead time, first article inspection (FAI) lead time, and mass production lead time for the initial order and subsequent repeat orders. Ask vendors to provide a breakdown of each lead time segment (mold manufacturing, sample production, testing, mass production, packaging) to identify potential bottlenecks. Require written confirmation that vendors have available production capacity to meet your scheduled launch timeline, and what penalty terms apply for delivery delays outside of force majeure events. Also ask for the maximum monthly production capacity for each part, to confirm they can support your projected 35% 2026 sales volume growth. Finally, add supplier qualification criteria to guide post-quote evaluation. Cross-verify that all quoted costs align with 2026 material and processing cost benchmarks: for example, current ABS resin pricing sits at $1.7-1.9 per kg, cold rolled steel at $0.9-1.1 per kg, so unit costs far outside this range should be flagged for clarification. Prioritize vendors that include full IQC, IPQC, and OQC inspection checkpoints in their quote, as well as a clear corrective action process for non-conforming parts. Only shortlist vendors that can provide documented proof of experience manufacturing similar power tool accessory components for at least 3 years, to reduce the risk of production quality issues. Eliminate vendors that omit key compliance requirements from their quote, as this indicates they did not fully review your specification documents and will likely lead to rework or compliance failures later.",
            "upvoteCount": 13,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#acceptedAnswer",
            "datePublished": "2026-08-28T16:15:07Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "All quotes should include explicit notes on raw material sourcing locations and price validity periods, as 2026 global resin and metal commodity prices are still subject to 5-8% monthly fluctuation for certain grades. Ask vendors to specify if they lock in material pricing for 30, 60, or 90 days post quote submission, and what the adjustment formula is for orders placed after the price validity window ends. For tooling costs, require vendors to break down mold material (P20, H13, etc.), machining hours, and post-processing costs, so you can verify that the quoted tooling price aligns with the expected lifespan and complexity of your parts. Also ask for the per-unit processing cost breakdown, including machine hourly rate, labor cost, and overhead allocation, to identify if any vendors are inflating overhead costs to compensate for artificially low quoted unit prices.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-2",
            "datePublished": "2026-08-28T15:59:34Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Add a section to your checklist requiring vendors to submit their proposed defect classification standard for your parts, including acceptable quality limits (AQL) for critical, major, and minor defects that align with your internal quality requirements. Ask for explicit details on all inspection checkpoints: incoming material inspection for raw material grade and composition, in-process inspection for dimensional accuracy after every 100 parts produced, and final outgoing inspection for surface finish, functional performance, and packaging integrity before shipment. Also require vendors to outline their corrective and preventive action (CAPA) process for non-conforming batches, including response time for quality issues, rework procedures, and root cause analysis documentation requirements, so you can ensure any quality problems are resolved quickly without delaying your production schedule.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-3",
            "datePublished": "2026-08-28T15:28:58Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Include a requirement for vendors to share their current production schedule load for the next 3 months, so you can confirm that your project will not be deprioritized in favor of larger, higher-volume customer orders. Ask vendors to identify any potential production bottlenecks for your parts, such as limited availability of specific injection molding machine tonnage or metal stamping equipment, and what contingency plans they have in place if those assets are unexpectedly out of service for maintenance. Also require confirmation that the vendor will assign a dedicated point of contact for your project who can coordinate between engineering, production, and quality teams to resolve any issues within 24 hours, to avoid delays caused by slow cross-department communication.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-4",
            "datePublished": "2026-08-28T15:15:05Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Add packaging requirements to your RFQ checklist to avoid unplanned damage during transit and non-compliance with regional labeling rules. Require vendors to specify the packaging material type (corrugated box grade, inner cushioning material), maximum carton weight, and stacking load limit for shipping your parts, as well as test data proving the packaging can withstand 1.2m drop tests and 72 hours of high-humidity storage for ocean freight shipments to the US. Ask for details on labeling content, including part number, lot number, production date, and country of origin marking, to ensure it complies with US customs and retail shelf labeling requirements. Also confirm if the packaging materials are recyclable, as your brand has committed to 100% recyclable shipping packaging for all 2026 product launches.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-5",
            "datePublished": "2026-08-28T15:07:53Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Include a section in your checklist requiring vendors to disclose any recent third-party manufacturing process audit reports from the past 12 months, as well as any non-conformities identified during those audits and the corrective actions taken to resolve them. Ask vendors to confirm they have no outstanding labor, environmental, or safety violations in their local jurisdiction, as these can lead to unexpected factory shutdowns that delay your order. Also require vendors to provide references from 2 current customers who produce similar power tool accessory components, so you can verify their track record of on-time delivery and consistent quality over at least a 12 month period. Flag any vendors that refuse to provide audit reports or customer references, as this is a high risk signal of potential capability gaps or compliance issues.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-6",
            "datePublished": "2026-08-28T14:40:10Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Add requirements for functional validation of pre-production samples to your RFQ checklist, to ensure the parts meet end-use performance requirements before mass production starts. Require vendors to confirm they can conduct all specified functional tests on site, including load bearing tests for the metal hardware components, cycle life tests for moving plastic parts, and flame resistance tests for materials used in high-heat areas of the power tool. Ask for details on how they will verify that the parts fit correctly with the other components of your power tool accessory set, including whether they can conduct trial assembly with your provided mating parts if requested. Also require confirmation that the parts will meet your expected field lifespan of at least 3 years under normal use conditions, to avoid post-launch product failure and warranty claims.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-7",
            "datePublished": "2026-08-28T14:25:36Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Make sure your RFQ checklist explicitly lists all mandatory regulatory certifications required for your target markets, including UL 94 for plastic parts, RoHS and REACH compliance for all materials sold in the EU, and FCC requirements if any components include electronic parts. Require vendors to confirm they can provide all necessary test reports and certification documentation from ISO 17025 accredited laboratories, and that all certifications are valid for at least 12 months from the date of your first shipment. Ask for details on who is responsible for covering certification renewal costs if you continue production after the initial certification expires, and whether the vendor can provide documentation of material composition for all parts to support your product compliance filings with US and EU regulatory bodies. Also confirm that all supply chain documentation is available for customs clearance, including country of origin certificates and material safety data sheets for all materials used.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-8",
            "datePublished": "2026-08-28T14:03:26Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Include clear requirements for prototype and pre-production sample development in your RFQ checklist, to speed up your design iteration process and reduce pre-production risks. Ask vendors to specify their lead time for rapid prototype samples using 3D printing or soft tooling, if you need to test design changes before finalizing hard tooling for mass production. Require vendors to provide a detailed sample development timeline, including milestones for first sample submission, functional testing, and revision iteration, as well as the cost for each additional sample revision requested after the first 2 free revisions. Also confirm that the vendor can implement minor design tweaks to tooling within 3 working days, to avoid delaying your launch timeline if you identify small fit or performance issues during sample testing.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-9",
            "datePublished": "2026-08-28T13:58:32Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Add clear project milestone and change management requirements to your RFQ checklist, to ensure all parties are aligned on expectations throughout the project lifecycle. Require vendors to confirm they will adhere to your specified milestone schedule, including tooling completion, first article inspection (FAI) submission, sample sign-off, and mass production start dates, and that any deviations from the schedule will be communicated at least 3 working days in advance. Ask for details on their change management process, including the lead time and cost impact of any design or specification changes requested after tooling production starts, to avoid unplanned cost overruns. Also require confirmation that the vendor will provide a full production handover package after sample sign-off, including tooling maintenance records, process parameter documentation, and quality control standards, to ensure consistent production quality across repeat orders.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/must-have-items-oem-rfq-checklist-custom-injection-molding-hardware-parts.html#suggestedAnswer-10",
            "datePublished": "2026-08-28T13:51:16Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.jaterson.com/qa/oem-odm/"}          ,{"@type": "ListItem", "position": 4, "name": "What are the must-have items for an OEM RFQ checklist for custom injection molding and hardware parts?"}
      ]
    }
]
```