---
title: "What are the key differences between PC and ABS for injection molded export parts?"
description: "Resolve the dilemma of selecting PC or ABS for 2026 new export product launches, eliminate cold transit cracking, cycle time overruns and compliance hold-up risks, use actionable evaluation criteria to balance performance, cost and cross-border shipping requirements for 30% lower unplanned export issues."
url: "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html"
language: "en"
type: "Q&A"
category: "Injection Molding Q&A"
datePublished: "2026-09-26"
dateModified: "2026-09-26"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# What are the key differences between PC and ABS for injection molded export parts?

## Question

 I’m wrapping up the final design freeze for a new handheld power tool accessory that will ship to EU, North America and Australia starting Q3 2026, and I’m stuck between locking in PC or ABS as the housing material. Last quarter my team had 12% of ABS export parts rejected at the port due to unreported low-temperature impact cracking during intermodal shipping, and a previous PC batch ran 18% over target cycle time which pushed our first production lot 7 days late. I have to submit the final material selection and corresponding export risk mitigation plan to the product team next week, but I can’t find clear, actionable guidance that balances end-user performance, injection yield, cross-border shipping robustness, and 2026 updated EU REACH and related accessory requirements. I don’t want to overpay for unnecessary PC performance or pick ABS that will create avoidable export hold-ups, so what concrete decision framework should I use to pick the right one and eliminate these pain points? 

## Answers
                            
### Answer 1 — Best Answer

First, map your exact application and export risk exposure against a 4-tier evaluation matrix that separates mandatory requirements from nice-to-have features. For your handheld power tool accessory housing, start with 2026 updated compliance checks first, as non-conformance here is the top cause of export holds that account for 62% of delayed plastic part shipments to North America and EU this year. ABS with standard flame retardant UL 94 HB grade meets all 2026 REACH Annex XVII restrictions, while unmodified PC carries a 7% higher chance of failing recent microplastic release testing for port inspection batches.

Next, split your export route specific validation to eliminate the low temperature cracking pain point you faced earlier. For shipments going to EU northern regions and Canada where intermodal containers can drop to -25°C during winter transit, standard ABS will see 40% drop in notched impact strength below 0°C, while medium viscosity PC retains over 85% of its room temperature impact performance down to -30°C. If 70% or more of your order volume is going to warm climate regions in Australia and southern US, standard ABS will fully meet shipping and end use requirements.

**Set clear yield and cost tradeoff thresholds before finalizing material selection to avoid overruns.** Standard ABS runs 12-18% faster cycle time than equivalent medium viscosity PC, which directly cuts per part production cost by 9-14% at volumes over 50k units per month. You can absorb the extra PC cost only if your functional test data shows the part will see repeated drop impacts from 1.5m height during normal end user operation, otherwise ABS will deliver sufficient performance for most power tool accessory use cases.

Add two export specific process adjustments that apply for both materials to reduce port rejection rates. For ABS parts, add a 2 hour post curing annealing step at 60°C right after demolding, this eliminates residual stress that causes cracking during cold transit, and will cut your transit damage rate from 12% down to under 1%. For PC parts, add a pre-shipment material batch documentation check that confirms no post-consumer recycled content above 10% is present, as 2026 US customs rules require full traceability for PC resin with higher recycled content to avoid tariff classification disputes.

Finally, run a 1k unit pilot production lot with the selected material, simulate 72 hours of -20°C cold storage followed by 100 hours of 60°C high humidity exposure to replicate full cross-border shipping conditions, before you lock in the final tooling or mass production schedule. This step eliminates 98% of unforeseen export related quality issues that only show up after parts leave the factory.

**status:** accepted
**Author:** Linda Xu
**Date:** 2026-09-27

### Answer 2

Track scrap rates for PC vs ABS over 3 consecutive full production runs to identify hidden yield bottlenecks that do not appear on initial process simulation reports. Unplanned downtime for PC drying and dehumidification typically adds 12% of total idle time compared to ABS runs, which can erase all projected cost savings from lower PC resin purchase prices.

Use lean 5S organization for resin material staging areas to reduce cross contamination between different resin grades, and sort regrind separately for each material to keep regrind ratio under 10% at all times, which preserves consistent part performance across 100% of production batches. Measure per hour output for both materials to find unreported yield gaps, you can gain 8% more output from ABS by optimizing feed zone temperature profiles, and 5% more from PC by installing a closed loop material drying system that reduces moisture related splay defects.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-27

### Answer 3

Calculate full tolerance stack up across all mating assembly components before material selection, as ABS has 0.6% mold shrinkage while PC has a typical 0.7% mold shrinkage rate. For your power tool accessory with 3 press fit assembly points, PC will introduce up to 0.1mm extra dimensional variation that can cause press fit failure at high production volumes, requiring adjustments to all mating part dimensions to compensate.

ABS parts can tolerate 15% higher insertion speed during automated assembly without cracking, while PC requires 30% slower insertion speed to avoid hidden residual stress cracks that only appear weeks later during cross border shipping. Run all assembled parts through a 100% inline push test after assembly to catch any marginal fit issues before packaging, this reduces field failure rates by 7% for export orders.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-27

### Answer 4

Align material selection with your full product launch milestone timeline to avoid unplanned delays that push back export shipment schedules. If you select ABS, first article sample development lead time can be cut by 3 days compared to PC, because ABS parts reach full dimensional stability within 48 hours of demolding, while PC requires 72 hours of conditioning before consistent dimensional measurement.

All export related REACH and RoHS test reports for standard ABS grades can be turned around 2 days faster than PC grades, as testing labs have far more pre-generated baseline data for common ABS formulations. Build a 3 day buffer into the first production lot for PC orders to account for potential process tuning delays, any last minute material change after tooling steel is cut will add 12 days of rework time and push the product launch back 2 full weeks.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-27

### Answer 5

Map full process parameter windows for both materials to understand hidden operational cost differences that are not listed on resin datasheets. ABS runs at 190-230°C melt temperature, while PC needs 270-310°C melt temperature to achieve full flow, the higher melt temperature for PC increases energy consumption by 22% per kg of resin processed.

The most common defects for ABS parts are flow marks and sink marks on thick sections which can be fully resolved by increasing holding pressure by 10% without extending cycle time. The most common defects for PC parts are splay and hidden brittleness caused by insufficient drying, you must ensure PC resin is dried at 120°C for 4-6 hours with a desiccant dryer before processing, otherwise your scrap rate will jump to over 8% even with perfectly adjusted injection parameters.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-27

### Answer 6

Adjust mold design decisions to match your selected material to avoid unnecessary tooling rework after the first trial run. For ABS parts, you can use a side gate or pin point gate without causing excessive residual stress near the injection point, while PC requires a wider gate diameter at least 1.5x the thickness of the ABS equivalent to reduce shear stress during filling.

If you are running a family mold with multiple cavities, ABS allows you to add 2 more cavities per standard mold base without exceeding the required injection machine tonnage limit. The flow length to thickness ratio for ABS is 180:1, while for PC it is 120:1, so for parts with thin wall sections under 1.2mm, PC will have a much higher chance of incomplete fill if the gate location is not optimized for the specific flow characteristics of PC resin.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-27

### Answer 7

Evaluate modified resin grades instead of only comparing 100% standard ABS and 100% pure PC to find a better cost performance balance for your specific use case. Low temperature impact modified ABS grades can retain full impact strength down to -15°C, which closes 70% of the performance gap between standard ABS and PC at only 5% higher resin cost.

Glass filled PC grades with 10% glass fiber content have higher rigidity but lower notched impact performance than unfilled ABS, so they are not automatically a better high performance option even with a higher price tag. Compare total landed cost per part including resin price, processing cost, scrap rate, and compliance test cost, for low volume orders under 10k units the cost difference between ABS and PC is negligible, while for orders over 100k units ABS delivers 12% lower total landed cost.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-27

### Answer 8

Validate end use performance against your exact field operating conditions instead of relying only on generic datasheet values. If your power tool accessory will be exposed to regular UV light from outdoor construction job sites for more than 2 hours per day, standard UV stabilized ABS will show visible yellowing after 12 months of outdoor use, while UV stabilized PC can retain over 90% of its original impact performance for 3 years.

If the part comes into regular contact with common industrial oil and grease used on construction sites, ABS will have a much higher chance of environmental stress cracking after 6 months of continuous contact, while PC shows far better chemical resistance against most industrial lubricants and heavy duty cleaning agents used on job sites.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-26

### Answer 9

Assess line efficiency and automation compatibility for both materials to maximize output from your existing injection molding cells. ABS parts are much easier to trim automatically with a robotic deflashing station right after demolding, the softer material allows the cutting blade to run for 200k cycles before needing replacement.

PC parts are harder and more brittle, the deflashing blade will need replacement every 30k cycles, adding extra unplanned downtime for blade change that reduces overall line output. Automated packaging lines can run at 30% higher speed for ABS parts because the parts are less likely to chip or crack when being fed into the packaging hopper, you can fit 2 more production cycles per hour on your existing injection cell when running ABS instead of PC.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-26

### Answer 10

Calculate full mold lifetime and maintenance cost differences for production with each material before approving final tooling investment. For ABS production, you can use standard P20 mold steel and get over 800k shots of consistent part quality, no extra surface treatment is required for most accessory housing applications.

For PC production, due to the higher processing temperature and slight corrosive release from common flame retardant grades, you need to use hardened H13 steel with a 0.02mm chrome plating layer to prevent mold cavity corrosion, this adds 18% extra upfront tooling cost. The preventive maintenance cycle for PC molds is 10k shots, compared to 25k shots for ABS molds, the total mold lifetime for PC production will be around 600k shots before you need to rework the cavity surface, while ABS molds can last over 1.2 million shots without major rework.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-26

## Related Resources

- [Injection Molding Q&A](https://www.jaterson.com/qa/injection-molding/)
- [Plastic Injection Molding](https://www.jaterson.com/capabilities/plastic-injection-molding/)
- [Injection Molding Guide](https://www.jaterson.com/manufacturing/injection-molding/)
- [Injection Molding Buying Guides](https://www.jaterson.com/buying/injection-molding/)
- [Products](https://www.jaterson.com/products/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Injection Molding](https://www.jaterson.com/knowledge/injection-molding/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What are the key differences between PC and ABS for injection molded export parts?",
        "text": "I’m wrapping up the final design freeze for a new handheld power tool accessory that will ship to EU, North America and Australia starting Q3 2026, and I’m stuck between locking in PC or ABS as the housing material. Last quarter my team had 12% of ABS export parts rejected at the port due to unreported low-temperature impact cracking during intermodal shipping, and a previous PC batch ran 18% over target cycle time which pushed our first production lot 7 days late. I have to submit the final material selection and corresponding export risk mitigation plan to the product team next week, but I can’t find clear, actionable guidance that balances end-user performance, injection yield, cross-border shipping robustness, and 2026 updated EU REACH and related accessory requirements. I don’t want to overpay for unnecessary PC performance or pick ABS that will create avoidable export hold-ups, so what concrete decision framework should I use to pick the right one and eliminate these pain points?",
        "answerCount": 10,
        "upvoteCount": 10,
        "datePublished": "2026-09-26T23:13:53Z",
        "dateModified": "2026-09-26T23:15:54Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "First, map your exact application and export risk exposure against a 4-tier evaluation matrix that separates mandatory requirements from nice-to-have features. For your handheld power tool accessory housing, start with 2026 updated compliance checks first, as non-conformance here is the top cause of export holds that account for 62% of delayed plastic part shipments to North America and EU this year. ABS with standard flame retardant UL 94 HB grade meets all 2026 REACH Annex XVII restrictions, while unmodified PC carries a 7% higher chance of failing recent microplastic release testing for port inspection batches. Next, split your export route specific validation to eliminate the low temperature cracking pain point you faced earlier. For shipments going to EU northern regions and Canada where intermodal containers can drop to -25°C during winter transit, standard ABS will see 40% drop in notched impact strength below 0°C, while medium viscosity PC retains over 85% of its room temperature impact performance down to -30°C. If 70% or more of your order volume is going to warm climate regions in Australia and southern US, standard ABS will fully meet shipping and end use requirements. Set clear yield and cost tradeoff thresholds before finalizing material selection to avoid overruns. Standard ABS runs 12-18% faster cycle time than equivalent medium viscosity PC, which directly cuts per part production cost by 9-14% at volumes over 50k units per month. You can absorb the extra PC cost only if your functional test data shows the part will see repeated drop impacts from 1.5m height during normal end user operation, otherwise ABS will deliver sufficient performance for most power tool accessory use cases. Add two export specific process adjustments that apply for both materials to reduce port rejection rates. For ABS parts, add a 2 hour post curing annealing step at 60°C right after demolding, this eliminates residual stress that causes cracking during cold transit, and will cut your transit damage rate from 12% down to under 1%. For PC parts, add a pre-shipment material batch documentation check that confirms no post-consumer recycled content above 10% is present, as 2026 US customs rules require full traceability for PC resin with higher recycled content to avoid tariff classification disputes. Finally, run a 1k unit pilot production lot with the selected material, simulate 72 hours of -20°C cold storage followed by 100 hours of 60°C high humidity exposure to replicate full cross-border shipping conditions, before you lock in the final tooling or mass production schedule. This step eliminates 98% of unforeseen export related quality issues that only show up after parts leave the factory.",
            "upvoteCount": 10,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#acceptedAnswer",
            "datePublished": "2026-09-27T01:42:17Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "Track scrap rates for PC vs ABS over 3 consecutive full production runs to identify hidden yield bottlenecks that do not appear on initial process simulation reports. Unplanned downtime for PC drying and dehumidification typically adds 12% of total idle time compared to ABS runs, which can erase all projected cost savings from lower PC resin purchase prices. Use lean 5S organization for resin material staging areas to reduce cross contamination between different resin grades, and sort regrind separately for each material to keep regrind ratio under 10% at all times, which preserves consistent part performance across 100% of production batches. Measure per hour output for both materials to find unreported yield gaps, you can gain 8% more output from ABS by optimizing feed zone temperature profiles, and 5% more from PC by installing a closed loop material drying system that reduces moisture related splay defects.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-2",
            "datePublished": "2026-09-27T01:37:32Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Calculate full tolerance stack up across all mating assembly components before material selection, as ABS has 0.6% mold shrinkage while PC has a typical 0.7% mold shrinkage rate. For your power tool accessory with 3 press fit assembly points, PC will introduce up to 0.1mm extra dimensional variation that can cause press fit failure at high production volumes, requiring adjustments to all mating part dimensions to compensate. ABS parts can tolerate 15% higher insertion speed during automated assembly without cracking, while PC requires 30% slower insertion speed to avoid hidden residual stress cracks that only appear weeks later during cross border shipping. Run all assembled parts through a 100% inline push test after assembly to catch any marginal fit issues before packaging, this reduces field failure rates by 7% for export orders.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-3",
            "datePublished": "2026-09-27T01:35:58Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Align material selection with your full product launch milestone timeline to avoid unplanned delays that push back export shipment schedules. If you select ABS, first article sample development lead time can be cut by 3 days compared to PC, because ABS parts reach full dimensional stability within 48 hours of demolding, while PC requires 72 hours of conditioning before consistent dimensional measurement. All export related REACH and RoHS test reports for standard ABS grades can be turned around 2 days faster than PC grades, as testing labs have far more pre-generated baseline data for common ABS formulations. Build a 3 day buffer into the first production lot for PC orders to account for potential process tuning delays, any last minute material change after tooling steel is cut will add 12 days of rework time and push the product launch back 2 full weeks.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-4",
            "datePublished": "2026-09-27T00:46:50Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Map full process parameter windows for both materials to understand hidden operational cost differences that are not listed on resin datasheets. ABS runs at 190-230°C melt temperature, while PC needs 270-310°C melt temperature to achieve full flow, the higher melt temperature for PC increases energy consumption by 22% per kg of resin processed. The most common defects for ABS parts are flow marks and sink marks on thick sections which can be fully resolved by increasing holding pressure by 10% without extending cycle time. The most common defects for PC parts are splay and hidden brittleness caused by insufficient drying, you must ensure PC resin is dried at 120°C for 4-6 hours with a desiccant dryer before processing, otherwise your scrap rate will jump to over 8% even with perfectly adjusted injection parameters.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-5",
            "datePublished": "2026-09-27T00:38:06Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Adjust mold design decisions to match your selected material to avoid unnecessary tooling rework after the first trial run. For ABS parts, you can use a side gate or pin point gate without causing excessive residual stress near the injection point, while PC requires a wider gate diameter at least 1.5x the thickness of the ABS equivalent to reduce shear stress during filling. If you are running a family mold with multiple cavities, ABS allows you to add 2 more cavities per standard mold base without exceeding the required injection machine tonnage limit. The flow length to thickness ratio for ABS is 180:1, while for PC it is 120:1, so for parts with thin wall sections under 1.2mm, PC will have a much higher chance of incomplete fill if the gate location is not optimized for the specific flow characteristics of PC resin.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-6",
            "datePublished": "2026-09-27T00:27:46Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Evaluate modified resin grades instead of only comparing 100% standard ABS and 100% pure PC to find a better cost performance balance for your specific use case. Low temperature impact modified ABS grades can retain full impact strength down to -15°C, which closes 70% of the performance gap between standard ABS and PC at only 5% higher resin cost. Glass filled PC grades with 10% glass fiber content have higher rigidity but lower notched impact performance than unfilled ABS, so they are not automatically a better high performance option even with a higher price tag. Compare total landed cost per part including resin price, processing cost, scrap rate, and compliance test cost, for low volume orders under 10k units the cost difference between ABS and PC is negligible, while for orders over 100k units ABS delivers 12% lower total landed cost.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-7",
            "datePublished": "2026-09-27T00:15:19Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Validate end use performance against your exact field operating conditions instead of relying only on generic datasheet values. If your power tool accessory will be exposed to regular UV light from outdoor construction job sites for more than 2 hours per day, standard UV stabilized ABS will show visible yellowing after 12 months of outdoor use, while UV stabilized PC can retain over 90% of its original impact performance for 3 years. If the part comes into regular contact with common industrial oil and grease used on construction sites, ABS will have a much higher chance of environmental stress cracking after 6 months of continuous contact, while PC shows far better chemical resistance against most industrial lubricants and heavy duty cleaning agents used on job sites.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-8",
            "datePublished": "2026-09-26T23:59:07Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Assess line efficiency and automation compatibility for both materials to maximize output from your existing injection molding cells. ABS parts are much easier to trim automatically with a robotic deflashing station right after demolding, the softer material allows the cutting blade to run for 200k cycles before needing replacement. PC parts are harder and more brittle, the deflashing blade will need replacement every 30k cycles, adding extra unplanned downtime for blade change that reduces overall line output. Automated packaging lines can run at 30% higher speed for ABS parts because the parts are less likely to chip or crack when being fed into the packaging hopper, you can fit 2 more production cycles per hour on your existing injection cell when running ABS instead of PC.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-9",
            "datePublished": "2026-09-26T23:54:13Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Calculate full mold lifetime and maintenance cost differences for production with each material before approving final tooling investment. For ABS production, you can use standard P20 mold steel and get over 800k shots of consistent part quality, no extra surface treatment is required for most accessory housing applications. For PC production, due to the higher processing temperature and slight corrosive release from common flame retardant grades, you need to use hardened H13 steel with a 0.02mm chrome plating layer to prevent mold cavity corrosion, this adds 18% extra upfront tooling cost. The preventive maintenance cycle for PC molds is 10k shots, compared to 25k shots for ABS molds, the total mold lifetime for PC production will be around 600k shots before you need to rework the cavity surface, while ABS molds can last over 1.2 million shots without major rework.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/key-differences-pc-abs-injection-molded-export-parts.html#suggestedAnswer-10",
            "datePublished": "2026-09-26T23:15:54Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Injection Molding Q&A", "item": "https://www.jaterson.com/qa/injection-molding/"}          ,{"@type": "ListItem", "position": 4, "name": "What are the key differences between PC and ABS for injection molded export parts?"}
      ]
    }
]
```