---
title: "H13 tool steel vs 304 stainless steel for injection mold insert applications?"
description: "Struggling to choose between H13 and 304 stainless for your manufacturing tooling or functional components? This guide breaks down real-world performance, processing, and cost tradeoffs, with clear decision benchmarks to avoid unexpected wear, corrosion or production overruns for 2026 projects."
url: "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html"
language: "en"
type: "Q&A"
category: "Injection Molding Q&A"
datePublished: "2026-10-04"
dateModified: "2026-10-04"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# H13 tool steel vs 304 stainless steel for injection mold insert applications?

## Question

 I am a QA lead at an OEM buyer, currently responsible for incoming inspection and supplier audit for a new 2-year production run of food-grade PP kitchen appliance components. Our tier 1 supplier recently proposed switching the cavity inserts from originally specified H13 tool steel to 304 stainless steel to cut 12% of upfront tool cost. My team already caught 3 incoming insert batches last month that had uneven polishing marks, and 2 cases of micro-cracking after only 1500 cycles of high melt temperature processing. All 304 inserts pass basic dimensional inspection, but I cannot find clear internal specs to confirm if 304 can hold up for the full projected 120k cycle target, and I also need to validate if food contact compatible 304 will develop unexpected rust or fine particle contamination issues when running filled PP with 5% glass fiber additive. I need practical, use-case specific comparison between H13 and 304 instead of generic material tables, so I can either approve the change with clear risk mitigation rules or push back properly with documented technical reasons. 

## Answers
                            
### Answer 1 — Best Answer

The micro-cracking and uneven surface issues you observed with 304 inserts come from fundamental material property differences that are rarely noted in generic comparison charts. H13 is a hot work tool steel formulated for continuous high temperature exposure, rated for stable operation up to 600°C, with a standard final hardness of 48-52 HRC after proper quenching and tempering. 304 stainless steel is an austenitic general purpose structural material, with maximum continuous operating temperature of roughly 300°C, and base hardness of only 150-200 HV even after maximum cold working. For your 240°C filled PP melt processing, 304 already loses 40% of its structural rigidity at steady state mold temperature, leading to thermal fatigue cracking that does not show up during cold room temperature dimensional checks.

For your 120k cycle production target with 5% glass filled PP, 304 has roughly 1/7 the abrasive wear resistance of properly heat treated H13, so consistent surface scuffing and dimensional drift will start appearing at around 18k cycles, 6 times earlier than your projected end of tool life. The food contact compatibility is a widely misunderstood point: while 304 is approved for static food contact components, continuous abrasion from glass fiber breaks its passive chromium oxide surface layer non-stop, leaving embedded fine steel particles that show up as dark contamination in final PP parts, even with regular mold cleaning cycles.

Use three actionable decision rules to resolve this dilemma. If your total production volume for the 2-year run drops below 15k total units, **you can approve the 304 insert change only if you add a mandatory 500 cycle mid-run polishing check** that tracks surface roughness and dimensional deviation of every cavity after each production batch. For volumes above 20k units, stick with standard H13, which can easily hit 200k+ cycles without measurable wear for this exact filled PP application. The 12% upfront cost saving from 304 disappears completely after 3 unplanned insert replacement cycles, which is almost guaranteed to happen during your 2-year production window.

Add two preventive inspection controls to avoid recurring issues. Test hardness on every incoming insert batch, 304 will fall below 25 HRC while properly heat treated H13 will sit between 46 and 54 HRC, no exceptions. Run a 200 cycle pre-production test run with actual filled PP material, then measure surface roughness with a profilometer. **If roughness increases more than 0.2 Ra after the 200 cycle test, reject the insert batch immediately**. For long term cost optimization, you can opt for nitrided H13 inserts that add 7% to upfront tool cost but extend total cycle life by 40%, which remains far more cost effective than switching to 304 for volumes above 50k units.

**status:** accepted
**Author:** Emily Chen
**Date:** 2026-10-04

### Answer 2

Document all material change traces in your project master file, since the original tool spec called for H13, you will need to formalize a deviation request that logs all agreed check frequencies, expected maximum part count per insert, and liability clauses with your supplier. If the supplier proposes 304 to reduce cost, make sure they take full responsibility for unplanned downtime caused by premature insert wear or contamination issues, and commit to free insert replacement within 72 hours if failure occurs before the pre-agreed cycle count.

Schedule a formal sample sign off for the 304 insert production run, where you capture 100 consecutive parts for full dimensional and cosmetic testing, and lock that sample as the baseline for all future incoming inspections. Map out the production transfer timeline if the 304 inserts fail at 18k cycles, so you have pre-ordered H13 inserts on standby 30 days before the projected failure point, to avoid unplanned line stoppages that can delay your overall product delivery to end customers.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-10-04

### Answer 3

When switching between H13 and 304 inserts, you will notice a difference in thermal conductivity that shifts your required mold cooling time by roughly 12% for the same filled PP material. 304 has a 20% lower thermal conductivity than H13, so if you keep the original cooling parameter set for H13, you will get higher part residual stress, leading to warpage that falls outside your drawing tolerance range.

Run 3 separate process trials with the 304 inserts to map the full stable process window, and log the adjusted cooling time, mold temperature set point and injection pressure to avoid unplanned rejects during mass production. Calculate the total line throughput loss from the extended cooling cycle, which can add up to 6% lower daily output for the entire 2 year run, to make sure that the small upfront cost saving from 304 does not get eaten up by lost production capacity that you did not account for earlier.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-10-04

### Answer 4

The surface dimensional drift that happens slowly as 304 inserts wear will not be caught by standard first article inspection, but it will create cumulative tolerance issues when the molded PP parts go through final assembly with other mating components. As the cavity surface wears, the gate vestige height will increase by up to 0.15mm over 15k cycles, which will create interference fit issues when the part snaps into the corresponding ABS mating part in your final product.

Add a periodic gate vestige height check every 3000 cycles, and track all part dimensional trends over time to catch drift before it causes 100% assembly reject batches. You also need to test the impact of fine steel particle contamination from 304 wear on the snap fit strength of the PP parts, because embedded steel particles can create micro-cracks at the snap joint root that reduce assembly pull force by up to 22% over the product's service life.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-10-04

### Answer 5

The polishability of 304 is far more variable than H13 for high gloss cavity surfaces, because the austenitic grain structure of 304 creates inconsistent scratch patterns during manual polishing that you can not eliminate completely, even with extended polishing time. When you order 304 inserts, you will notice that the total lead time for full polishing is 3 days longer than equivalent H13 inserts, and the surface finish will degrade 30% faster after repeated mold cleaning cycles.

The post-weld repair performance of 304 is also much worse than H13, so if you need to adjust the cavity geometry to tweak part dimension after sampling, the welded 304 insert will develop stress cracks immediately after less than 2000 production cycles, while H13 welded inserts can retain their full cycle life if welded with matching filler material. If you plan to make minor cavity modifications after production launch, H13 is the far more forgiving option.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-10-04

### Answer 6

The thermal expansion coefficient of 304 is roughly 28% higher than H13, so when the mold heats up to steady state operating temperature during long production runs, the cavity dimensional size will expand more than you measured during cold first article inspection. This can cause unexpected flash at the part parting line that does not show up during short test runs, and you will need to adjust your mold clamping force up by 8-10% to compensate, which adds extra stress to the mold base and reduces the overall mold service life.

304 is also far more prone to sticking to glass filled PP melt during processing, so you will need to add 0.5% extra release agent to the material blend, which can leave residual release agent on the part surface that creates issues for subsequent printing or labeling operations. Map out all these potential defect modes in your FMEA document before approving any material change, so your production team knows exactly what parameters to adjust when they see unexpected defects pop up.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-10-04

### Answer 7

Update your IQC inspection procedure for incoming mold inserts to add a non-destructive spark test that can confirm material type in 10 seconds, to eliminate the risk of suppliers sending low grade 304L that has even lower wear resistance than standard 304. Add a periodic 10 piece sample pull every 2000 production cycles, where you test surface hardness with a portable micro-hardness tester to make sure there is no surface softening from repeated high temperature exposure.

Define clear defect classification rules for insert related failures: any micro-crack larger than 0.02mm, any surface roughness higher than 1.6 Ra, or any dimensional deviation larger than 0.03mm will trigger an immediate insert replacement, no exception. Log all insert failure data in your quality tracking system, so you can build a real cycle life dataset for 304 inserts that you can reference for future projects, instead of relying on theoretical material property data from suppliers.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-10-04

### Answer 8

Map out all the hidden waste points that come with 304 inserts to calculate the total cost of ownership, instead of only looking at upfront purchase cost. The extra reject rate from part warpage, flash, and contamination from 304 wear can push your overall production yield down by 2-4% for the entire run, which adds more than 3 times the upfront cost saving of 304 when calculated across 120k total parts.

Run a small 1 month trial with 304 inserts, and track all downtime, reject counts, and maintenance labor hours during that trial period, to generate real on-site data that you can use to compare against the baseline performance of your original H13 inserts. This lean data collection will eliminate all speculative assumptions about cost saving, and give you hard numbers to justify either the material change or the decision to stay with H13 to your internal project stakeholders.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-10-04

### Answer 9

For food contact parts, the fine wear particles released from the 304 insert surface will accumulate in the narrow part undercuts over time, and can leach trace amounts of chromium and nickel when the end user washes the part in hot alkaline dishwasher cycles. While this will not exceed global food safety limits immediately, after 2 years of continuous insert wear, the accumulated concentration will pass the maximum allowed migration threshold set by FDA and EU 1935/2004 standards, which can lead to full product recall risks.

If your end customer has explicit 10 year part durability requirements, the dimensional drift from 304 insert wear will also create inconsistent wall thickness across parts, which reduces the drop impact resistance of the molded PP parts by up to 18%, leading to higher field failure rates that damage your brand reputation. Run full third party food contact migration testing on parts collected at the 10k cycle mark, to make sure you do not run into non-compliance issues later in the production run.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-10-04

## Related Resources

- [Injection Molding Q&A](https://www.jaterson.com/qa/injection-molding/)
- [Plastic Injection Molding](https://www.jaterson.com/capabilities/plastic-injection-molding/)
- [Injection Molding Guide](https://www.jaterson.com/manufacturing/injection-molding/)
- [Injection Molding Buying Guides](https://www.jaterson.com/buying/injection-molding/)
- [Products](https://www.jaterson.com/products/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Injection Molding](https://www.jaterson.com/knowledge/injection-molding/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "H13 tool steel vs 304 stainless steel for injection mold insert applications?",
        "text": "I am a QA lead at an OEM buyer, currently responsible for incoming inspection and supplier audit for a new 2-year production run of food-grade PP kitchen appliance components. Our tier 1 supplier recently proposed switching the cavity inserts from originally specified H13 tool steel to 304 stainless steel to cut 12% of upfront tool cost. My team already caught 3 incoming insert batches last month that had uneven polishing marks, and 2 cases of micro-cracking after only 1500 cycles of high melt temperature processing. All 304 inserts pass basic dimensional inspection, but I cannot find clear internal specs to confirm if 304 can hold up for the full projected 120k cycle target, and I also need to validate if food contact compatible 304 will develop unexpected rust or fine particle contamination issues when running filled PP with 5% glass fiber additive. I need practical, use-case specific comparison between H13 and 304 instead of generic material tables, so I can either approve the change with clear risk mitigation rules or push back properly with documented technical reasons.",
        "answerCount": 9,
        "upvoteCount": 11,
        "datePublished": "2026-10-04T17:46:45Z",
        "dateModified": "2026-10-04T18:09:50Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The micro-cracking and uneven surface issues you observed with 304 inserts come from fundamental material property differences that are rarely noted in generic comparison charts. H13 is a hot work tool steel formulated for continuous high temperature exposure, rated for stable operation up to 600°C, with a standard final hardness of 48-52 HRC after proper quenching and tempering. 304 stainless steel is an austenitic general purpose structural material, with maximum continuous operating temperature of roughly 300°C, and base hardness of only 150-200 HV even after maximum cold working. For your 240°C filled PP melt processing, 304 already loses 40% of its structural rigidity at steady state mold temperature, leading to thermal fatigue cracking that does not show up during cold room temperature dimensional checks. For your 120k cycle production target with 5% glass filled PP, 304 has roughly 1/7 the abrasive wear resistance of properly heat treated H13, so consistent surface scuffing and dimensional drift will start appearing at around 18k cycles, 6 times earlier than your projected end of tool life. The food contact compatibility is a widely misunderstood point: while 304 is approved for static food contact components, continuous abrasion from glass fiber breaks its passive chromium oxide surface layer non-stop, leaving embedded fine steel particles that show up as dark contamination in final PP parts, even with regular mold cleaning cycles. Use three actionable decision rules to resolve this dilemma. If your total production volume for the 2-year run drops below 15k total units, you can approve the 304 insert change only if you add a mandatory 500 cycle mid-run polishing check that tracks surface roughness and dimensional deviation of every cavity after each production batch. For volumes above 20k units, stick with standard H13, which can easily hit 200k+ cycles without measurable wear for this exact filled PP application. The 12% upfront cost saving from 304 disappears completely after 3 unplanned insert replacement cycles, which is almost guaranteed to happen during your 2-year production window. Add two preventive inspection controls to avoid recurring issues. Test hardness on every incoming insert batch, 304 will fall below 25 HRC while properly heat treated H13 will sit between 46 and 54 HRC, no exceptions. Run a 200 cycle pre-production test run with actual filled PP material, then measure surface roughness with a profilometer. If roughness increases more than 0.2 Ra after the 200 cycle test, reject the insert batch immediately . For long term cost optimization, you can opt for nitrided H13 inserts that add 7% to upfront tool cost but extend total cycle life by 40%, which remains far more cost effective than switching to 304 for volumes above 50k units.",
            "upvoteCount": 11,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#acceptedAnswer",
            "datePublished": "2026-10-04T19:42:57Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "Document all material change traces in your project master file, since the original tool spec called for H13, you will need to formalize a deviation request that logs all agreed check frequencies, expected maximum part count per insert, and liability clauses with your supplier. If the supplier proposes 304 to reduce cost, make sure they take full responsibility for unplanned downtime caused by premature insert wear or contamination issues, and commit to free insert replacement within 72 hours if failure occurs before the pre-agreed cycle count. Schedule a formal sample sign off for the 304 insert production run, where you capture 100 consecutive parts for full dimensional and cosmetic testing, and lock that sample as the baseline for all future incoming inspections. Map out the production transfer timeline if the 304 inserts fail at 18k cycles, so you have pre-ordered H13 inserts on standby 30 days before the projected failure point, to avoid unplanned line stoppages that can delay your overall product delivery to end customers.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#suggestedAnswer-2",
            "datePublished": "2026-10-04T19:23:03Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When switching between H13 and 304 inserts, you will notice a difference in thermal conductivity that shifts your required mold cooling time by roughly 12% for the same filled PP material. 304 has a 20% lower thermal conductivity than H13, so if you keep the original cooling parameter set for H13, you will get higher part residual stress, leading to warpage that falls outside your drawing tolerance range. Run 3 separate process trials with the 304 inserts to map the full stable process window, and log the adjusted cooling time, mold temperature set point and injection pressure to avoid unplanned rejects during mass production. Calculate the total line throughput loss from the extended cooling cycle, which can add up to 6% lower daily output for the entire 2 year run, to make sure that the small upfront cost saving from 304 does not get eaten up by lost production capacity that you did not account for earlier.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#suggestedAnswer-3",
            "datePublished": "2026-10-04T19:14:04Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The surface dimensional drift that happens slowly as 304 inserts wear will not be caught by standard first article inspection, but it will create cumulative tolerance issues when the molded PP parts go through final assembly with other mating components. As the cavity surface wears, the gate vestige height will increase by up to 0.15mm over 15k cycles, which will create interference fit issues when the part snaps into the corresponding ABS mating part in your final product. Add a periodic gate vestige height check every 3000 cycles, and track all part dimensional trends over time to catch drift before it causes 100% assembly reject batches. You also need to test the impact of fine steel particle contamination from 304 wear on the snap fit strength of the PP parts, because embedded steel particles can create micro-cracks at the snap joint root that reduce assembly pull force by up to 22% over the product&#039;s service life.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#suggestedAnswer-4",
            "datePublished": "2026-10-04T18:54:08Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The polishability of 304 is far more variable than H13 for high gloss cavity surfaces, because the austenitic grain structure of 304 creates inconsistent scratch patterns during manual polishing that you can not eliminate completely, even with extended polishing time. When you order 304 inserts, you will notice that the total lead time for full polishing is 3 days longer than equivalent H13 inserts, and the surface finish will degrade 30% faster after repeated mold cleaning cycles. The post-weld repair performance of 304 is also much worse than H13, so if you need to adjust the cavity geometry to tweak part dimension after sampling, the welded 304 insert will develop stress cracks immediately after less than 2000 production cycles, while H13 welded inserts can retain their full cycle life if welded with matching filler material. If you plan to make minor cavity modifications after production launch, H13 is the far more forgiving option.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#suggestedAnswer-5",
            "datePublished": "2026-10-04T18:53:09Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The thermal expansion coefficient of 304 is roughly 28% higher than H13, so when the mold heats up to steady state operating temperature during long production runs, the cavity dimensional size will expand more than you measured during cold first article inspection. This can cause unexpected flash at the part parting line that does not show up during short test runs, and you will need to adjust your mold clamping force up by 8-10% to compensate, which adds extra stress to the mold base and reduces the overall mold service life. 304 is also far more prone to sticking to glass filled PP melt during processing, so you will need to add 0.5% extra release agent to the material blend, which can leave residual release agent on the part surface that creates issues for subsequent printing or labeling operations. Map out all these potential defect modes in your FMEA document before approving any material change, so your production team knows exactly what parameters to adjust when they see unexpected defects pop up.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#suggestedAnswer-6",
            "datePublished": "2026-10-04T18:48:37Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Update your IQC inspection procedure for incoming mold inserts to add a non-destructive spark test that can confirm material type in 10 seconds, to eliminate the risk of suppliers sending low grade 304L that has even lower wear resistance than standard 304. Add a periodic 10 piece sample pull every 2000 production cycles, where you test surface hardness with a portable micro-hardness tester to make sure there is no surface softening from repeated high temperature exposure. Define clear defect classification rules for insert related failures: any micro-crack larger than 0.02mm, any surface roughness higher than 1.6 Ra, or any dimensional deviation larger than 0.03mm will trigger an immediate insert replacement, no exception. Log all insert failure data in your quality tracking system, so you can build a real cycle life dataset for 304 inserts that you can reference for future projects, instead of relying on theoretical material property data from suppliers.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#suggestedAnswer-7",
            "datePublished": "2026-10-04T18:44:19Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Map out all the hidden waste points that come with 304 inserts to calculate the total cost of ownership, instead of only looking at upfront purchase cost. The extra reject rate from part warpage, flash, and contamination from 304 wear can push your overall production yield down by 2-4% for the entire run, which adds more than 3 times the upfront cost saving of 304 when calculated across 120k total parts. Run a small 1 month trial with 304 inserts, and track all downtime, reject counts, and maintenance labor hours during that trial period, to generate real on-site data that you can use to compare against the baseline performance of your original H13 inserts. This lean data collection will eliminate all speculative assumptions about cost saving, and give you hard numbers to justify either the material change or the decision to stay with H13 to your internal project stakeholders.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#suggestedAnswer-8",
            "datePublished": "2026-10-04T18:33:37Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For food contact parts, the fine wear particles released from the 304 insert surface will accumulate in the narrow part undercuts over time, and can leach trace amounts of chromium and nickel when the end user washes the part in hot alkaline dishwasher cycles. While this will not exceed global food safety limits immediately, after 2 years of continuous insert wear, the accumulated concentration will pass the maximum allowed migration threshold set by FDA and EU 1935/2004 standards, which can lead to full product recall risks. If your end customer has explicit 10 year part durability requirements, the dimensional drift from 304 insert wear will also create inconsistent wall thickness across parts, which reduces the drop impact resistance of the molded PP parts by up to 18%, leading to higher field failure rates that damage your brand reputation. Run full third party food contact migration testing on parts collected at the 10k cycle mark, to make sure you do not run into non-compliance issues later in the production run.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/h13-tool-steel-vs-304-stainless-injection-mold-insert-applications.html#suggestedAnswer-9",
            "datePublished": "2026-10-04T18:09:50Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Injection Molding Q&A", "item": "https://www.jaterson.com/qa/injection-molding/"}          ,{"@type": "ListItem", "position": 4, "name": "H13 tool steel vs 304 stainless steel for injection mold insert applications?"}
      ]
    }
]
```