---
title: "What key factors affect the cost of TPE insert molding tool grips?"
description: "First-time independent hand tool brand founder confused by 35% price gaps across TPE insert molding tool grip quotes, unlock clear cost breakdown rules, mandatory verification checkpoints, and payment terms to avoid quality failures and missed 2026 product launch windows."
url: "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html"
language: "en"
type: "Q&A"
category: "Plastic Components Q&A"
datePublished: "2026-10-12"
dateModified: "2026-10-12"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# What key factors affect the cost of TPE insert molding tool grips?

## Question

 I’m the founder of a small independent hand tool brand, and I’m currently sourcing TPE insert molding tool grips for our new line of utility knives. This is my first time working with a Chinese manufacturing partner, and I’m really stuck right now: I got 3 different quotes from 3 different factories, the lowest one is 35% cheaper than the highest, but none of them clearly explain what the difference covers. I don’t know if the low-priced one is cutting corners on material or mold quality, or if the high one is just overcharging for no reason. I also don’t know what mandatory checks I need to add to our OEM agreement to avoid getting grips that peel, slip, or break after 3 months of use, or end up with a 2 week delivery delay that makes me miss our Amazon launch window in October 2026. How can I sort this out without overpaying or taking unacceptable quality risks? 

## Answers
                            
### Answer 1 — Best Answer

All valid TPE insert molding tool grip projects need to lock 3 core non-negotiable requirements first before comparing any quotes. First, confirm the TPE material hardness and base resin grade: most utility knife grips use 45-65 Shore A TPE, if a quote does not specify virgin industrial-grade TPE, there is a high chance the supplier plans to use 20%+ regrind material to cut cost, which reduces oil resistance and abrasion life by more than 40%. Second, confirm the metal insert retention pull force standard: the minimum standard for general hand tools is 120N, any supplier that does not provide a pull test report for 5 consecutive prototype parts before mass production is not aligned with your functional needs. Third, confirm the mold cavity number and expected mold life: for 10k annual unit demand, a 2-cavity mold with P20 steel core meets your needs, no need to pay extra for S136 steel for this use case.

For cost and lead time breakdown, the 35% price gap you see mostly comes from 4 unstated line items. The lowest quote usually excludes steel upgrade fees, first article inspection testing fees, 3-month mold after-sales warranty, and OQC 100% pull test cost, while the highest quote likely includes unnecessary value-added items like custom brand color matching without your request, extra 500 pcs free sample batches, and air shipping for urgent samples that you do not need. The reasonable total lead time for this project in 2026 is 18-25 days for tooling and 7-12 days for 10k pcs mass production, any lead time shorter than 15 days for tooling means the factory will skip at least 2 trial shot cycles to rush delivery, leading to high defect rate at later stage. **You can sort all quotes by filtering the above 3 mandatory requirements first, remove any supplier that cannot list all 4 cost breakdown line items explicitly, the remaining quote difference should be within 10% of each other.**

For supplier judgment, you do not need to ask for fancy third party certifications that are irrelevant to this component. **Ask for 2 pieces of evidence directly: first, photos of existing TPE insert molding tool grip parts they produced for other hand tool customers, with production date marked after Q4 2025, second, their standard IPQC checklist for insert positioning before each injection shot.** A real experienced factory will have both documents ready within 2 working days, a trading agent or inexperienced subcontractor will not be able to provide clear, specific content for both. **You can also add a 10% payment retention term in the OEM agreement, that 10% is released 30 days after you receive the first batch and pass your 72 hour continuous pull and abrasion test, which eliminates 90% of hidden quality risks.**

**status:** accepted
**Author:** David Zhang
**Date:** 2026-10-12

### Answer 2

For TPE insert molding tool grips, the most common uncaught design flaw is inconsistent wall thickness between the thinnest TPE section and the metal insert. If the TPE wall is less than 0.8mm at any point, you will see frequent delamination after 1000+ usage cycles, even if the pull test passes the initial check. All outer edges of the TPE wrap need a minimum 0.15mm radius, sharp corners will create high stress points that crack when users apply heavy torque on the tool.

The draft angle for TPE sections should be at least 1.5 degrees, any design with 0.5 degree draft will result in 15-20% higher demolding damage rate at mass production, which directly pushes up your unit cost that you did not budget for. Even small design adjustments of these parameters can reduce final production defect rate by more than 30% without changing the hand feel or appearance you target.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-10-12

### Answer 3

For utility knife use scenarios, the TPE grip will be exposed to hand sweat, mineral oil from regular maintenance, and -10 to 50 degree Celsius temperature range during outdoor use. You need to require the factory to run 72 hour fluid resistance testing on sample parts, soak them in 10W-30 motor oil and 5% saline solution at 50 C, then check if the TPE surface gets sticky or loses friction coefficient.

The minimum required static friction coefficient for the grip surface is 0.8, lower than that users will slip even with dry hands, which leads to negative product reviews for your new brand. You should also test the grip performance after 50 cycles of extreme temperature shift between -20 C and 60 C, to make sure the TPE does not separate from the metal insert due to different thermal expansion rates.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-10-12

### Answer 4

When you assemble the tool grip to your existing utility knife body, the total tolerance stack-up between the TPE outer diameter, inner metal insert hole, and the matching aluminum handle core should be controlled within 0.12mm. If the tolerance is looser than 0.15mm, you will see more than 8% of parts have wobble after full assembly, which will be rejected at your final assembly line.

All metal inserts should have 2 pre-machined anti-rotation notches before insert molding, if the inserts only use knurling for retention, you will still see 2-3% of parts rotate under heavy torque even the pull test passes. You should confirm the assembly sequence with the factory that they will not package the grips with extra protective film that sticks to the TPE surface, as leftover adhesive on the soft TPE is almost impossible to wipe off completely at your assembly site.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-10-12

### Answer 5

For TPE insert molding tool grip mass production, the biggest yield loss usually happens at the insert loading step, if the operator manually places inserts into the mold, the misplacement rate is usually 2-3% for unskilled workers after 8 hours of continuous shift. Factories with mature lean process will add a simple optical positioning check before each injection shot to confirm the insert is seated correctly, which reduces misplacement related defects down to below 0.3%.

They will also implement a first piece check every 2 hours for each production batch, to confirm no insert misalignment or TPE material mixing happens during long production runs. This level of process control usually adds less than 3% to your total unit cost, but reduces unexpected batch rejection losses by more than 90% for orders over 5000 units.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-10-12

### Answer 6

For TPE insert molding tool grip molds, the core cavity steel should use pre-hardened P20 steel with 28-32 HRC hardness for normal 50k shot lifetime, if the supplier uses common S50C unhardened steel, the mold will wear out after 15k shots, leading to flash on the parting line that is hard to trim, and you have to pay extra for mold rework after your second order.

The parting line should be placed on the non-contact bottom edge of the grip, never on the high-friction surface that users hold, otherwise the polished flash mark will reduce surface friction significantly. The mold should also have a separate insert positioning pin structure, so when you need to produce different grip sizes later, you only replace the small core inserts instead of remaking the full mold, which cuts future tooling cost by more than 60%.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-10-12

### Answer 7

The defect classification standard for TPE insert molding tool grips should be split into critical, major and minor levels. Critical defects include insert fall out under 80N pull force, sharp flash over 0.2mm on the grip surface, and visible TPE delamination, any part with critical defect must be rejected 100%. Major defects include sink mark deeper than 0.3mm, color difference outside the Delta E 2 range, and small burr that needs manual trimming. Minor defects can include faint witness mark on non-functional edge that does not affect use.

For incoming inspection, you should require the supplier to provide 20 pcs random pull test data per 1000 pcs batch, for in-process checks they must record insert placement check results every hour, and for final shipment they should do visual inspection 100% for all critical defect items before packaging. You also need to confirm their corrective action response SLA is within 48 hours if any non-conformity is found in your incoming inspection.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-10-12

### Answer 8

The most common cosmetic and functional defects for TPE insert grips are sink marks, warp, and insufficient bonding to the metal insert. Sink marks usually happen when the injection holding pressure is too low, or the cooling time is shorter than 12 seconds, which makes the TPE material shrink unevenly around the metal insert. Warp happens when the mold temperature is set above 70 C and the parts are ejected too early, leading to uneven internal stress in the soft TPE material.

Insufficient bonding usually comes from the metal insert not being fully dried or cleaned of oil before being placed into the mold. A mature factory will run 3-4 trial shots to lock the stable process window that covers at least 10% adjustment range for all key parameters, so small variation in daily raw material batches will not lead to sudden batch quality issues.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-10-12

### Answer 9

For your 2026 October Amazon launch timeline, the key milestone control points should be clearly written into your OEM agreement. The tooling design review should be completed within 3 working days after deposit payment, first sample delivery should be within 12 working days, and you get 3 working days to test and sign off the sample. If you do not raise modification requests during sample sign off, the mass production start date will be fixed, any delay caused by unapproved last minute design changes should be confirmed in written form with new timeline agreed by both parties.

The factory should provide a weekly 1-page progress update email, with photos of tooling machining, trial shot samples and mass production line status if requested. Once the first batch production is 80% complete, you can arrange a third party inspection 2 days before shipment, so there is still enough time for rework if any quality issues are found.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-10-12

### Answer 10

The gate location for TPE insert molding tool grip is a key tradeoff decision that affects both part quality and post processing work. The most recommended gate location is on the flat bottom non-functional face of the grip, so the gate witness mark will not be on the user holding surface, no extra manual trimming work is needed. If the gate is placed on the side wall, you will have to do secondary trimming work that adds extra labor cost and may leave a sharp burr on the edge.

The mold should also add a dedicated overflow well at the end of the flow path, to let out the trapped air that causes burn mark or incomplete TPE filling near the end of the insert. This small structural design adjustment almost does not add extra tooling cost, but reduces the first trial shot defect rate by more than 25% compared to mold designs without overflow wells.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-10-12

## Related Resources

- [Plastic Components Q&A](https://www.jaterson.com/qa/plastic-components/)
- [Plastic Components](https://www.jaterson.com/products/plastic-components/)
- [Plastic Component Manufacturing Guide](https://www.jaterson.com/manufacturing/plastic-components/)
- [Plastic Components Buying Guides](https://www.jaterson.com/buying/plastic-components/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Plastic Components](https://www.jaterson.com/knowledge/plastic-components/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What key factors affect the cost of TPE insert molding tool grips?",
        "text": "I’m the founder of a small independent hand tool brand, and I’m currently sourcing TPE insert molding tool grips for our new line of utility knives. This is my first time working with a Chinese manufacturing partner, and I’m really stuck right now: I got 3 different quotes from 3 different factories, the lowest one is 35% cheaper than the highest, but none of them clearly explain what the difference covers. I don’t know if the low-priced one is cutting corners on material or mold quality, or if the high one is just overcharging for no reason. I also don’t know what mandatory checks I need to add to our OEM agreement to avoid getting grips that peel, slip, or break after 3 months of use, or end up with a 2 week delivery delay that makes me miss our Amazon launch window in October 2026. How can I sort this out without overpaying or taking unacceptable quality risks?",
        "answerCount": 10,
        "upvoteCount": 12,
        "datePublished": "2026-10-12T18:37:59Z",
        "dateModified": "2026-10-12T18:45:10Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "All valid TPE insert molding tool grip projects need to lock 3 core non-negotiable requirements first before comparing any quotes. First, confirm the TPE material hardness and base resin grade: most utility knife grips use 45-65 Shore A TPE, if a quote does not specify virgin industrial-grade TPE, there is a high chance the supplier plans to use 20%+ regrind material to cut cost, which reduces oil resistance and abrasion life by more than 40%. Second, confirm the metal insert retention pull force standard: the minimum standard for general hand tools is 120N, any supplier that does not provide a pull test report for 5 consecutive prototype parts before mass production is not aligned with your functional needs. Third, confirm the mold cavity number and expected mold life: for 10k annual unit demand, a 2-cavity mold with P20 steel core meets your needs, no need to pay extra for S136 steel for this use case. For cost and lead time breakdown, the 35% price gap you see mostly comes from 4 unstated line items. The lowest quote usually excludes steel upgrade fees, first article inspection testing fees, 3-month mold after-sales warranty, and OQC 100% pull test cost, while the highest quote likely includes unnecessary value-added items like custom brand color matching without your request, extra 500 pcs free sample batches, and air shipping for urgent samples that you do not need. The reasonable total lead time for this project in 2026 is 18-25 days for tooling and 7-12 days for 10k pcs mass production, any lead time shorter than 15 days for tooling means the factory will skip at least 2 trial shot cycles to rush delivery, leading to high defect rate at later stage. You can sort all quotes by filtering the above 3 mandatory requirements first, remove any supplier that cannot list all 4 cost breakdown line items explicitly, the remaining quote difference should be within 10% of each other. For supplier judgment, you do not need to ask for fancy third party certifications that are irrelevant to this component. Ask for 2 pieces of evidence directly: first, photos of existing TPE insert molding tool grip parts they produced for other hand tool customers, with production date marked after Q4 2025, second, their standard IPQC checklist for insert positioning before each injection shot. A real experienced factory will have both documents ready within 2 working days, a trading agent or inexperienced subcontractor will not be able to provide clear, specific content for both. You can also add a 10% payment retention term in the OEM agreement, that 10% is released 30 days after you receive the first batch and pass your 72 hour continuous pull and abrasion test, which eliminates 90% of hidden quality risks.",
            "upvoteCount": 12,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#acceptedAnswer",
            "datePublished": "2026-10-12T21:00:05Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "For TPE insert molding tool grips, the most common uncaught design flaw is inconsistent wall thickness between the thinnest TPE section and the metal insert. If the TPE wall is less than 0.8mm at any point, you will see frequent delamination after 1000+ usage cycles, even if the pull test passes the initial check. All outer edges of the TPE wrap need a minimum 0.15mm radius, sharp corners will create high stress points that crack when users apply heavy torque on the tool. The draft angle for TPE sections should be at least 1.5 degrees, any design with 0.5 degree draft will result in 15-20% higher demolding damage rate at mass production, which directly pushes up your unit cost that you did not budget for. Even small design adjustments of these parameters can reduce final production defect rate by more than 30% without changing the hand feel or appearance you target.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-2",
            "datePublished": "2026-10-12T20:59:58Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For utility knife use scenarios, the TPE grip will be exposed to hand sweat, mineral oil from regular maintenance, and -10 to 50 degree Celsius temperature range during outdoor use. You need to require the factory to run 72 hour fluid resistance testing on sample parts, soak them in 10W-30 motor oil and 5% saline solution at 50 C, then check if the TPE surface gets sticky or loses friction coefficient. The minimum required static friction coefficient for the grip surface is 0.8, lower than that users will slip even with dry hands, which leads to negative product reviews for your new brand. You should also test the grip performance after 50 cycles of extreme temperature shift between -20 C and 60 C, to make sure the TPE does not separate from the metal insert due to different thermal expansion rates.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-3",
            "datePublished": "2026-10-12T20:51:11Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When you assemble the tool grip to your existing utility knife body, the total tolerance stack-up between the TPE outer diameter, inner metal insert hole, and the matching aluminum handle core should be controlled within 0.12mm. If the tolerance is looser than 0.15mm, you will see more than 8% of parts have wobble after full assembly, which will be rejected at your final assembly line. All metal inserts should have 2 pre-machined anti-rotation notches before insert molding, if the inserts only use knurling for retention, you will still see 2-3% of parts rotate under heavy torque even the pull test passes. You should confirm the assembly sequence with the factory that they will not package the grips with extra protective film that sticks to the TPE surface, as leftover adhesive on the soft TPE is almost impossible to wipe off completely at your assembly site.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-4",
            "datePublished": "2026-10-12T20:48:13Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For TPE insert molding tool grip mass production, the biggest yield loss usually happens at the insert loading step, if the operator manually places inserts into the mold, the misplacement rate is usually 2-3% for unskilled workers after 8 hours of continuous shift. Factories with mature lean process will add a simple optical positioning check before each injection shot to confirm the insert is seated correctly, which reduces misplacement related defects down to below 0.3%. They will also implement a first piece check every 2 hours for each production batch, to confirm no insert misalignment or TPE material mixing happens during long production runs. This level of process control usually adds less than 3% to your total unit cost, but reduces unexpected batch rejection losses by more than 90% for orders over 5000 units.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-5",
            "datePublished": "2026-10-12T20:46:32Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For TPE insert molding tool grip molds, the core cavity steel should use pre-hardened P20 steel with 28-32 HRC hardness for normal 50k shot lifetime, if the supplier uses common S50C unhardened steel, the mold will wear out after 15k shots, leading to flash on the parting line that is hard to trim, and you have to pay extra for mold rework after your second order. The parting line should be placed on the non-contact bottom edge of the grip, never on the high-friction surface that users hold, otherwise the polished flash mark will reduce surface friction significantly. The mold should also have a separate insert positioning pin structure, so when you need to produce different grip sizes later, you only replace the small core inserts instead of remaking the full mold, which cuts future tooling cost by more than 60%.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-6",
            "datePublished": "2026-10-12T20:36:53Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The defect classification standard for TPE insert molding tool grips should be split into critical, major and minor levels. Critical defects include insert fall out under 80N pull force, sharp flash over 0.2mm on the grip surface, and visible TPE delamination, any part with critical defect must be rejected 100%. Major defects include sink mark deeper than 0.3mm, color difference outside the Delta E 2 range, and small burr that needs manual trimming. Minor defects can include faint witness mark on non-functional edge that does not affect use. For incoming inspection, you should require the supplier to provide 20 pcs random pull test data per 1000 pcs batch, for in-process checks they must record insert placement check results every hour, and for final shipment they should do visual inspection 100% for all critical defect items before packaging. You also need to confirm their corrective action response SLA is within 48 hours if any non-conformity is found in your incoming inspection.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-7",
            "datePublished": "2026-10-12T20:11:55Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The most common cosmetic and functional defects for TPE insert grips are sink marks, warp, and insufficient bonding to the metal insert. Sink marks usually happen when the injection holding pressure is too low, or the cooling time is shorter than 12 seconds, which makes the TPE material shrink unevenly around the metal insert. Warp happens when the mold temperature is set above 70 C and the parts are ejected too early, leading to uneven internal stress in the soft TPE material. Insufficient bonding usually comes from the metal insert not being fully dried or cleaned of oil before being placed into the mold. A mature factory will run 3-4 trial shots to lock the stable process window that covers at least 10% adjustment range for all key parameters, so small variation in daily raw material batches will not lead to sudden batch quality issues.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-8",
            "datePublished": "2026-10-12T19:37:27Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For your 2026 October Amazon launch timeline, the key milestone control points should be clearly written into your OEM agreement. The tooling design review should be completed within 3 working days after deposit payment, first sample delivery should be within 12 working days, and you get 3 working days to test and sign off the sample. If you do not raise modification requests during sample sign off, the mass production start date will be fixed, any delay caused by unapproved last minute design changes should be confirmed in written form with new timeline agreed by both parties. The factory should provide a weekly 1-page progress update email, with photos of tooling machining, trial shot samples and mass production line status if requested. Once the first batch production is 80% complete, you can arrange a third party inspection 2 days before shipment, so there is still enough time for rework if any quality issues are found.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-9",
            "datePublished": "2026-10-12T19:08:13Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The gate location for TPE insert molding tool grip is a key tradeoff decision that affects both part quality and post processing work. The most recommended gate location is on the flat bottom non-functional face of the grip, so the gate witness mark will not be on the user holding surface, no extra manual trimming work is needed. If the gate is placed on the side wall, you will have to do secondary trimming work that adds extra labor cost and may leave a sharp burr on the edge. The mold should also add a dedicated overflow well at the end of the flow path, to let out the trapped air that causes burn mark or incomplete TPE filling near the end of the insert. This small structural design adjustment almost does not add extra tooling cost, but reduces the first trial shot defect rate by more than 25% compared to mold designs without overflow wells.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/factors-affecting-cost-tpe-insert-molding-tool-grips.html#suggestedAnswer-10",
            "datePublished": "2026-10-12T18:45:10Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Plastic Components Q&A", "item": "https://www.jaterson.com/qa/plastic-components/"}          ,{"@type": "ListItem", "position": 4, "name": "What key factors affect the cost of TPE insert molding tool grips?"}
      ]
    }
]
```