title: "What Key Criteria Should I Use to Evaluate Small PC/ABS Injection Mold Suppliers for OEM Projects?"
description: "First-time OEM brand founders face challenges sourcing small PC/ABS injection molds without overpaying or sacrificing quality. Clear supplier evaluation criteria, cost-lead time tradeoff analysis, and actionable risk mitigation steps help select reliable partners, optimize budgets, and ensure on-time, high-volume production."
url: "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html"
language: "en"
type: "Q&A"
category: "Custom Manufacturing Q&A"
datePublished: "2026-09-09"
dateModified: "2026-09-09"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# What Key Criteria Should I Use to Evaluate Small PC/ABS Injection Mold Suppliers for OEM Projects?

## Question

 I’m the founder of a new portable audio brand, and I’m negotiating my first OEM cooperation with a Chinese factory for a small PC/ABS blend speaker casing. The part is 8cm x 5cm x 2cm, with a matte finish and a few snap-fit features for assembly. My budget is tight—around $2,000 for the mold plus unit production costs under $0.50 per piece—and I need to launch the product in 3 months. I’m worried about hidden costs, inconsistent sample quality, and not knowing how to properly assess if a factory is capable of delivering on time. I’ve received three quotes ranging from $1,200 to $2,800, and I don’t understand why there’s such a big gap. Can you guide me through how to approach this, what to prioritize, and how to avoid costly mistakes? 

## Answers
                            
### Answer 1 — Best Answer

First, clarify your non-negotiable requirements to align with supplier capabilities. Start by sharing complete 3D CAD files, detailed dimensional tolerances (e.g., ±0.05mm for snap-fit features), specified PC/ABS blend ratio (e.g., 50/50 for balanced impact resistance and cost), mold life expectation (e.g., 100,000 shots for your initial production run), and any post-processing needs (like matte coating). This ensures quotes are based on the same scope, eliminating discrepancies from vague specifications.

Next, analyze cost and lead time tradeoffs specific to 2026 market conditions. For small PC/ABS molds (1-4 cavities), typical costs range from $800 to $3,000. The $1,600 gap in your quotes likely stems from steel grade (P20 steel cuts cost by 20% but limits mold life to 50,000 shots vs. H13 steel for 200,000+ shots), cavity count (4-cavity molds increase upfront cost by 30% but reduce unit production cost by 40%), and value-added services like DFM reviews or sample testing. Lead times vary from 10-20 days for standard molds to 25-35 days for custom designs with complex features; rushing production can add 15-20% to the cost, so align lead time with your launch schedule to avoid premiums.

Finally, use actionable criteria to evaluate suppliers. **Request a detailed quote breakdown** (steel material, machining labor, post-processing, and quality testing) to identify hidden fees. **Verify in-house mold-making capabilities** by asking for photos of their CNC machining centers and mold assembly shop—avoid suppliers outsourcing mold production, as this increases lead time and quality risks. **Assess sample consistency** by requesting 5-10 pre-production samples to test snap-fit functionality, surface finish, and dimensional accuracy. Additionally, evaluate communication responsiveness and change management processes to ensure they can adapt if you need to adjust the part design later.

**status:** accepted
**Author:** Amy Li
**Date:** 2026-09-09

### Answer 2

For small PC/ABS injection molds, steel selection directly impacts mold life and long-term cost. P20 steel is a cost-effective option for low to medium production runs (50,000-100,000 shots), but it’s prone to wear if the part has sharp edges or snap-fit features that exert repeated stress. H13 steel, while 25% more expensive upfront, offers 2-3 times longer mold life and better resistance to corrosion, making it ideal for runs exceeding 100,000 shots.

Tolerance control is critical too—look for suppliers who can hold ±0.03mm for critical features like snap-fit tabs, as even minor deviations can cause assembly failures. Plan for regular mold maintenance: schedule cleaning every 5,000 shots and replace ejector pins every 20,000 shots to extend mold life and avoid unplanned downtime.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-09

### Answer 3

Mold design decisions for small PC/ABS parts require balancing quality, cost, and ease of production. Gate location is a key tradeoff: edge gates are low-cost and easy to machine but leave a visible mark that may require post-processing. Hot runner gates eliminate visible marks and reduce material waste by 10-15%, but they add $300-$500 to the mold cost.

For your speaker casing, a sub-gate located on the non-visible bottom surface is a middle ground—minimizing cosmetic impact without the high cost of hot runners. Additionally, design insertable cores for snap-fit features; this allows for easy modification if you need to adjust the fit later, avoiding the need to rebuild the entire mold. Proper cooling channel layout is also essential: evenly spaced channels reduce cycle time by 15-20% and minimize warpage in thin-walled PC/ABS parts.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-09

### Answer 4

Establish clear inspection criteria to ensure consistent quality for small PC/ABS molds. Start with IQC: verify that the supplier provides material certificates for the mold steel and PC/ABS resin to confirm they meet your specified grades.

During IPQC, monitor trial runs to check for common defects like sink marks, warpage, and flash—set thresholds for each defect type (e.g., no sink marks deeper than 0.1mm on visible surfaces). For OQC, implement a sampling plan based on AQL 1.5 for critical dimensions (like snap-fit tab width) and 100% visual inspection for surface finish.

If defects are found, require a corrective action report (CAR) that outlines root causes and prevention measures, such as adjusting injection parameters or modifying mold cooling. Document all inspection results to hold the supplier accountable for consistent quality in mass production.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-09

### Answer 5

Optimize production efficiency for small PC/ABS parts by focusing on cycle time and automation. A well-designed small mold should have a cycle time of 15-30 seconds per shot—any longer indicates inefficiencies in cooling or ejection. Implementing robotic pickers can reduce labor costs by 25% and improve consistency, as robots eliminate human error in part handling.

For mold changeovers, use dedicated setup stations for small molds to reduce changeover time from 2 hours to 30 minutes, allowing you to switch between part designs quickly if needed. Track process stability using Cpk values; aim for a Cpk >1.33 for critical dimensions to ensure that 99.9% of parts meet tolerance requirements. Regularly review production data to identify bottlenecks, such as slow cooling, and adjust processes to maintain consistent output.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-09

### Answer 6

Tolerance stack-up is a critical consideration for small PC/ABS parts that assemble with other components, like your speaker’s driver or buttons. Even small deviations in individual part tolerances can add up to cause fit issues during assembly.

Use Geometric Dimensioning and Tolerancing (GD&T) to define critical features, such as the snap-fit tab’s position relative to the casing’s edge, rather than relying on basic linear dimensions. During sample approval, conduct assembly fit tests using actual mating parts—not just 3D simulations—to verify that the PC/ABS casing fits securely and functions as intended.

If stack-up issues are found, work with the supplier to adjust individual part tolerances (e.g., tighten the snap-fit tab’s width tolerance by ±0.02mm) or modify the part design to increase clearance. Document these fit tests to ensure consistency in mass production.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-09

### Answer 7

PC/ABS blends require precise injection process parameters to avoid defects and ensure consistent quality. The barrel temperature should be set between 220-260°C, depending on the blend ratio—higher PC content requires higher temperatures to melt the resin fully.

Mold temperature should be maintained at 60-80°C to reduce warpage, as PC/ABS has a high shrinkage rate. Sink marks, a common issue in thin-walled parts, can be resolved by increasing packing pressure by 10-15% and extending packing time by 5-10 seconds.

Warpage is often caused by uneven cooling; adjust the cooling channel flow rate to ensure uniform heat distribution across the mold. Flash, which occurs when resin seeps into mold gaps, can be fixed by checking mold alignment and reducing injection pressure by 5-10%. Conduct a process validation run to lock in optimal parameters before mass production.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-09

### Answer 8

Selecting the right PC/ABS blend is key to balancing cost, performance, and manufacturability. A 50/50 PC/ABS blend is ideal for your speaker casing, as it offers balanced impact resistance (to withstand drops), rigidity (to hold internal components), and cost. If budget is a top priority, a 30/70 PC/ABS blend is 15% cheaper but has lower impact resistance, making it suitable for non-critical parts.

For enhanced durability, a 70/30 PC/ABS blend offers better impact resistance but increases cycle time by 10% due to higher melting temperatures. Consider incorporating 10-15% post-consumer recycled (PCR) resin to reduce cost by 8-10% without significant loss of mechanical properties, provided your brand’s sustainability goals allow it. Always request resin samples to test tensile strength and impact resistance before finalizing the material grade.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-09

### Answer 9

Design-for-manufacture (DFM) feedback is essential to reduce costs and avoid production issues for small PC/ABS molds. Ensure your part design includes a minimum draft angle of 1-2 degrees on all vertical surfaces to facilitate easy ejection—without this, parts may stick to the mold, causing damage and increasing cycle time. Wall thickness should be uniform (1.5-2.5mm) to prevent warpage and sink marks; avoid thick sections (over 3mm) that require longer cooling times.

Replace sharp corners with radii of 0.3-0.5mm to reduce stress concentration in the part and extend mold life. Eliminate unnecessary features like deep grooves or small holes that increase machining time and mold cost. Work with the supplier to review DFM feedback early in the design process—making changes before mold machining can save up to 30% in costs and reduce lead time by 5-7 days.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-09

### Answer 10

Effective project management ensures on-time delivery and avoids scope creep for small PC/ABS injection mold projects. Define clear milestones with deadlines: DFM review (day 3), mold design approval (day 5), mold machining (day 15), trial run (day 20), sample sign-off (day 22), and mass production start (day 25). Use a shared project management tool to track progress and communicate updates in real time.

For sample sign-off, require written approval for both dimensional accuracy and functional performance (e.g., snap-fit strength) to avoid disputes later. Implement a formal change management process: any design change must be documented in a change order, with updated cost and lead time estimates, before work proceeds. This prevents unplanned costs and delays caused by last-minute modifications. Finally, schedule a pre-production meeting to confirm all processes are in place before launching mass production.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-09

## Related Resources

- [Custom Manufacturing Q&A](https://www.jaterson.com/qa/oem-odm/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What Key Criteria Should I Use to Evaluate Small PC/ABS Injection Mold Suppliers for OEM Projects?",
        "text": "I’m the founder of a new portable audio brand, and I’m negotiating my first OEM cooperation with a Chinese factory for a small PC/ABS blend speaker casing. The part is 8cm x 5cm x 2cm, with a matte finish and a few snap-fit features for assembly. My budget is tight—around $2,000 for the mold plus unit production costs under $0.50 per piece—and I need to launch the product in 3 months. I’m worried about hidden costs, inconsistent sample quality, and not knowing how to properly assess if a factory is capable of delivering on time. I’ve received three quotes ranging from $1,200 to $2,800, and I don’t understand why there’s such a big gap. Can you guide me through how to approach this, what to prioritize, and how to avoid costly mistakes?",
        "answerCount": 10,
        "upvoteCount": 9,
        "datePublished": "2026-09-09T08:02:34Z",
        "dateModified": "2026-09-09T08:09:18Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "First, clarify your non-negotiable requirements to align with supplier capabilities. Start by sharing complete 3D CAD files, detailed dimensional tolerances (e.g., ±0.05mm for snap-fit features), specified PC/ABS blend ratio (e.g., 50/50 for balanced impact resistance and cost), mold life expectation (e.g., 100,000 shots for your initial production run), and any post-processing needs (like matte coating). This ensures quotes are based on the same scope, eliminating discrepancies from vague specifications. Next, analyze cost and lead time tradeoffs specific to 2026 market conditions. For small PC/ABS molds (1-4 cavities), typical costs range from $800 to $3,000. The $1,600 gap in your quotes likely stems from steel grade (P20 steel cuts cost by 20% but limits mold life to 50,000 shots vs. H13 steel for 200,000+ shots), cavity count (4-cavity molds increase upfront cost by 30% but reduce unit production cost by 40%), and value-added services like DFM reviews or sample testing. Lead times vary from 10-20 days for standard molds to 25-35 days for custom designs with complex features; rushing production can add 15-20% to the cost, so align lead time with your launch schedule to avoid premiums. Finally, use actionable criteria to evaluate suppliers. **Request a detailed quote breakdown** (steel material, machining labor, post-processing, and quality testing) to identify hidden fees. **Verify in-house mold-making capabilities** by asking for photos of their CNC machining centers and mold assembly shop—avoid suppliers outsourcing mold production, as this increases lead time and quality risks. **Assess sample consistency** by requesting 5-10 pre-production samples to test snap-fit functionality, surface finish, and dimensional accuracy. Additionally, evaluate communication responsiveness and change management processes to ensure they can adapt if you need to adjust the part design later.",
            "upvoteCount": 9,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#acceptedAnswer",
            "datePublished": "2026-09-09T08:40:29Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "For small PC/ABS injection molds, steel selection directly impacts mold life and long-term cost. P20 steel is a cost-effective option for low to medium production runs (50,000-100,000 shots), but it’s prone to wear if the part has sharp edges or snap-fit features that exert repeated stress. H13 steel, while 25% more expensive upfront, offers 2-3 times longer mold life and better resistance to corrosion, making it ideal for runs exceeding 100,000 shots. Tolerance control is critical too—look for suppliers who can hold ±0.03mm for critical features like snap-fit tabs, as even minor deviations can cause assembly failures. Plan for regular mold maintenance: schedule cleaning every 5,000 shots and replace ejector pins every 20,000 shots to extend mold life and avoid unplanned downtime.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-2",
            "datePublished": "2026-09-09T08:32:34Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Mold design decisions for small PC/ABS parts require balancing quality, cost, and ease of production. Gate location is a key tradeoff: edge gates are low-cost and easy to machine but leave a visible mark that may require post-processing. Hot runner gates eliminate visible marks and reduce material waste by 10-15%, but they add $300-$500 to the mold cost. For your speaker casing, a sub-gate located on the non-visible bottom surface is a middle ground—minimizing cosmetic impact without the high cost of hot runners. Additionally, design insertable cores for snap-fit features; this allows for easy modification if you need to adjust the fit later, avoiding the need to rebuild the entire mold. Proper cooling channel layout is also essential: evenly spaced channels reduce cycle time by 15-20% and minimize warpage in thin-walled PC/ABS parts.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-3",
            "datePublished": "2026-09-09T08:29:34Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Establish clear inspection criteria to ensure consistent quality for small PC/ABS molds. Start with IQC: verify that the supplier provides material certificates for the mold steel and PC/ABS resin to confirm they meet your specified grades. During IPQC, monitor trial runs to check for common defects like sink marks, warpage, and flash—set thresholds for each defect type (e.g., no sink marks deeper than 0.1mm on visible surfaces). For OQC, implement a sampling plan based on AQL 1.5 for critical dimensions (like snap-fit tab width) and 100% visual inspection for surface finish. If defects are found, require a corrective action report (CAR) that outlines root causes and prevention measures, such as adjusting injection parameters or modifying mold cooling. Document all inspection results to hold the supplier accountable for consistent quality in mass production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-4",
            "datePublished": "2026-09-09T08:26:47Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Optimize production efficiency for small PC/ABS parts by focusing on cycle time and automation. A well-designed small mold should have a cycle time of 15-30 seconds per shot—any longer indicates inefficiencies in cooling or ejection. Implementing robotic pickers can reduce labor costs by 25% and improve consistency, as robots eliminate human error in part handling. For mold changeovers, use dedicated setup stations for small molds to reduce changeover time from 2 hours to 30 minutes, allowing you to switch between part designs quickly if needed. Track process stability using Cpk values; aim for a Cpk &gt;1.33 for critical dimensions to ensure that 99.9% of parts meet tolerance requirements. Regularly review production data to identify bottlenecks, such as slow cooling, and adjust processes to maintain consistent output.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-5",
            "datePublished": "2026-09-09T08:25:09Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Tolerance stack-up is a critical consideration for small PC/ABS parts that assemble with other components, like your speaker’s driver or buttons. Even small deviations in individual part tolerances can add up to cause fit issues during assembly. Use Geometric Dimensioning and Tolerancing (GD&amp;T) to define critical features, such as the snap-fit tab’s position relative to the casing’s edge, rather than relying on basic linear dimensions. During sample approval, conduct assembly fit tests using actual mating parts—not just 3D simulations—to verify that the PC/ABS casing fits securely and functions as intended. If stack-up issues are found, work with the supplier to adjust individual part tolerances (e.g., tighten the snap-fit tab’s width tolerance by ±0.02mm) or modify the part design to increase clearance. Document these fit tests to ensure consistency in mass production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-6",
            "datePublished": "2026-09-09T08:24:47Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "PC/ABS blends require precise injection process parameters to avoid defects and ensure consistent quality. The barrel temperature should be set between 220-260°C, depending on the blend ratio—higher PC content requires higher temperatures to melt the resin fully. Mold temperature should be maintained at 60-80°C to reduce warpage, as PC/ABS has a high shrinkage rate. Sink marks, a common issue in thin-walled parts, can be resolved by increasing packing pressure by 10-15% and extending packing time by 5-10 seconds. Warpage is often caused by uneven cooling; adjust the cooling channel flow rate to ensure uniform heat distribution across the mold. Flash, which occurs when resin seeps into mold gaps, can be fixed by checking mold alignment and reducing injection pressure by 5-10%. Conduct a process validation run to lock in optimal parameters before mass production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-7",
            "datePublished": "2026-09-09T08:21:34Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Selecting the right PC/ABS blend is key to balancing cost, performance, and manufacturability. A 50/50 PC/ABS blend is ideal for your speaker casing, as it offers balanced impact resistance (to withstand drops), rigidity (to hold internal components), and cost. If budget is a top priority, a 30/70 PC/ABS blend is 15% cheaper but has lower impact resistance, making it suitable for non-critical parts. For enhanced durability, a 70/30 PC/ABS blend offers better impact resistance but increases cycle time by 10% due to higher melting temperatures. Consider incorporating 10-15% post-consumer recycled (PCR) resin to reduce cost by 8-10% without significant loss of mechanical properties, provided your brand’s sustainability goals allow it. Always request resin samples to test tensile strength and impact resistance before finalizing the material grade.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-8",
            "datePublished": "2026-09-09T08:21:26Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Design-for-manufacture (DFM) feedback is essential to reduce costs and avoid production issues for small PC/ABS molds. Ensure your part design includes a minimum draft angle of 1-2 degrees on all vertical surfaces to facilitate easy ejection—without this, parts may stick to the mold, causing damage and increasing cycle time. Wall thickness should be uniform (1.5-2.5mm) to prevent warpage and sink marks; avoid thick sections (over 3mm) that require longer cooling times. Replace sharp corners with radii of 0.3-0.5mm to reduce stress concentration in the part and extend mold life. Eliminate unnecessary features like deep grooves or small holes that increase machining time and mold cost. Work with the supplier to review DFM feedback early in the design process—making changes before mold machining can save up to 30% in costs and reduce lead time by 5-7 days.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-9",
            "datePublished": "2026-09-09T08:20:24Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Effective project management ensures on-time delivery and avoids scope creep for small PC/ABS injection mold projects. Define clear milestones with deadlines: DFM review (day 3), mold design approval (day 5), mold machining (day 15), trial run (day 20), sample sign-off (day 22), and mass production start (day 25). Use a shared project management tool to track progress and communicate updates in real time. For sample sign-off, require written approval for both dimensional accuracy and functional performance (e.g., snap-fit strength) to avoid disputes later. Implement a formal change management process: any design change must be documented in a change order, with updated cost and lead time estimates, before work proceeds. This prevents unplanned costs and delays caused by last-minute modifications. Finally, schedule a pre-production meeting to confirm all processes are in place before launching mass production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-small-pc-abs-injection-mold-suppliers-oem-projects.html#suggestedAnswer-10",
            "datePublished": "2026-09-09T08:09:18Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.jaterson.com/qa/oem-odm/"}          ,{"@type": "ListItem", "position": 4, "name": "What Key Criteria Should I Use to Evaluate Small PC/ABS Injection Mold Suppliers for OEM Projects?"}
      ]
    }
]
```