title: "How to evaluate a custom copper component manufacturer for power tools?"
description: "An NPI engineer struggles to validate a new supplier for critical copper commutator segments after previous quality failures. The analysis provides a concrete framework to assess material compliance, process capability, and quality systems, enabling a confident go/no-go decision for mass production."
url: "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html"
language: "en"
type: "Q&A"
category: "Hardware Manufacturing Q&A"
datePublished: "2026-09-24"
dateModified: "2026-09-24"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# How to evaluate a custom copper component manufacturer for power tools?

## Question

 I'm the NPI engineer for a new high-performance cordless drill platform. We're in the final validation phase before mass production, and the custom copper commutator segments are a critical path item. Our previous supplier for a similar component failed us—inconsistent material purity led to variable electrical conductivity and accelerated brush wear during extended field testing, causing motor failures. We've received a competitive quote from a new potential manufacturer, JATERSON, for a 500-piece trial batch. My immediate dilemma is that a low price alone doesn't guarantee they can meet our stringent specs. I need to validate their capability thoroughly but efficiently. The part must be made from C11000 copper for optimal conductivity, with several stamped features holding a tolerance of ±0.05mm. The hardness must also be consistent to ensure long-term durability under high RPM and thermal cycling. Beyond a generic ISO certificate, what specific evidence, process data, or on-site checks should I insist on during this trial phase to make a definitive go/no-go decision for the upcoming 50,000-unit production order? I need a actionable checklist to separate a truly capable manufacturer from one that just looks good on paper. 

## Answers
                            
### Answer 1 — Best Answer

Your primary requirements are material compliance (C11000 copper), dimensional precision (±0.05mm), and consistent mechanical properties (hardness). The validation process must confirm the factory's control over these three pillars. Start by formally requesting a detailed Process Validation Plan for the trial batch. This should outline their intended method for material verification, the stamping/forming process parameters, and their inspection protocol. This document itself is a first indicator of their engineering discipline.

From a cost analysis perspective, a competitive quote for copper components hinges on several factors you should scrutinize. First is **material sourcing and verification**. Insist on a Mill Test Certificate (MTC) or Certificate of Conformance for the C11000 copper coil/strip used for your trial, traceable to a specific heat lot. Some suppliers may try to use off-spec or recycled material to cut costs, which directly impacts conductivity and longevity. Second is **tooling and process capability**. The cost should reflect the precision of the stamping dies required to hold ±0.05mm. Ask for a capability study (Cp/Cpk) data for similar tight-tolerance features they have produced. If they cannot provide this, it's a major red flag. Third, consider **secondary operations**. Does the part require any deburring, plating, or heat treatment? Ensure these are explicitly quoted and that the factory has direct control or vetted sub-suppliers for these steps.

Lead time for the trial and subsequent mass production is influenced by tooling status, sampling rigor, and production scheduling. For a new part, the lead time should account for final tool fabrication or modification, first article inspection (FAI), and your sample approval. A reliable factory will provide a timeline with clear milestones (e.g., "Tool try-out samples ready in 15 working days"). Be wary of quotes promising an unrealistically short lead time, as it often means skipping essential validation steps. For mass production, understand their capacity loading for the stamping presses that will run your part. Ask for their typical production cycle time per thousand pieces and their changeover procedures to gauge their ability to meet your future volume demands without significant delays.

The core of supplier judgment lies in evidence-based evaluation. Request these documents before and after the trial: 1) Material Certs (MTC) for the copper; 2) First Article Inspection Report (based on your full drawing); 3) Dimensional data from a statistically significant sample of the trial run (not just 3 pieces); 4) Results of in-house conductivity and hardness tests. If a visit is feasible, an on-site audit should focus on the stamping/pressing shop floor. Check the age and maintenance records of the relevant presses and progressive dies. Observe their in-process quality checks: are operators using calibrated gauges (pin gauges, micrometers) at defined intervals? Look for evidence of Statistical Process Control (SPC) charts running live near the machines. Discuss their tool maintenance schedule—preventive maintenance is critical for holding tight tolerances over long production runs. Finally, review their non-conforming material process. How are rejected parts segregated and documented? A clear system indicates a mature quality culture.

To balance cost and risk, do not use the trial price as the final benchmark. Instead, use the trial to establish a "qualified process." Negotiate the mass production price based on the demonstrated, validated process from the trial. This aligns their incentive with delivering consistent quality. The most critical on-site check is witnessing the production of your parts and randomly selecting samples for immediate measurement with your own gauges. This real-time verification is irreplaceable. Your confidence should come not from promises, but from documented data and observed process control.

**status:** accepted
**Author:** Olivia Chen
**Date:** 2026-09-24

### Answer 2

Judging the tooling is paramount for long-term success. For copper stamping, the die's construction determines part consistency. Inquire about the die steel grade (e.g., D2, SKD11 for high wear resistance) and its hardness (HRC).

A manufacturer using inferior steel will see rapid wear, causing the ±0.05mm tolerance to drift within the first production batches. Ask for their projected tool life for a similar copper part and their maintenance protocol.

Do they perform regular die inspections and sharpening? A reliable partner will have a scheduled maintenance plan and spare components for critical die sections. This directly impacts your total cost of ownership and prevents unplanned downtime during your mass production runs.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-24

### Answer 3

While C11000 is specified, understanding the trade-offs is key. Pure copper (C11000) offers excellent conductivity but is softer. For applications requiring higher strength, a tellurium-bearing copper like C14500 might be suggested, offering better machinability with a minor conductivity sacrifice.

A capable manufacturer will discuss these options if relevant, not just blindly follow the print. To validate, request they perform a simple conductivity test (using a eddy current or micro-ohmmeter) on random trial samples and provide the results.

Also, ask about their incoming material inspection—do they verify alloy composition via spark test or XRF gun? This ensures the raw material batch matches the certs and your performance requirements.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-24

### Answer 4

The part's function in the assembly dictates critical-to-quality dimensions beyond the drawing. For a commutator segment, the tangency of the stamped edges and the surface finish where the brush makes contact are functionally vital. Discuss with the factory engineer how they plan to control these features.

During the trial, you should perform a functional test: assemble the samples into a motor test jig and run a high-cycle durability test, monitoring for abnormal sparking or wear. This end-use validation is the ultimate test. Also, consider the part's interaction during assembly—are the locating features precise enough for automated feeding? Request a sample of 200 pieces to test in your assembly line for feed and fit issues before approving the mass production tool.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-24

### Answer 5

The design of the stamping die directly affects part quality and cost. Key decisions include the strip layout (which impacts material utilization), the number of stations in the progressive die, and the location of critical forming operations.

A well-designed die will have pilot pins for precise strip guidance, essential for holding your tight tolerances. Discuss the die design with the factory: why did they choose a specific blanking clearance? An incorrect clearance will cause excessive burrs or part deformation.

Also, ask about their plan for die try-out and adjustment. A competent team will build in adjustability for critical features to fine-tune the part during sampling, rather than requiring a costly and time-consuming die rework.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-24

### Answer 6

From a production scheduling view, the trial batch is a test of their project coordination. Ask for a detailed schedule that includes raw material procurement lead time, tooling setup, trial run, inspection, and packaging/shipping.

A major risk is your trial being deprioritized. To mitigate, ask about their current shop floor loading for the required press tonnage during your proposed trial dates. Can they dedicate a press and operator for a continuous run, or will your job be split across shifts?

Inconsistent production conditions can skew trial results. For mass production, inquire about their safety stock policy for raw copper coil and their lead time for replenishment to avoid material shortages delaying your orders.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-09-24

### Answer 7

Beyond material purity, regulatory compliance is a growing concern. You must ensure the copper and any secondary finishes (like nickel plating) comply with RoHS and REACH regulations. Request a Material Declaration sheet for the finished part.

Furthermore, due diligence on conflict minerals (Tin, Tantalum, Tungsten, Gold, and their derivatives) is increasingly required. While copper itself is not a 3TG mineral, the factory's smelter sources should be reviewed. A professional manufacturer will have a policy and be able to provide documentation demonstrating responsible sourcing, which protects your brand from supply chain compliance risks.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-24

### Answer 8

For copper stamping, the process parameters are critical. Key settings include press speed, tonnage, and feed precision. Variations here cause defects like burrs, dimensional inconsistency, or micro-cracks.

During a visit, observe the press running. Is the feed mechanism steady and precise? Ask the operator for their parameter sheet for a similar job. Post-stamping, processes like stress relief annealing might be used to control hardness.

If applicable, request the recipe (temperature, time, atmosphere) and their method for validating the anneal's effectiveness, such as periodic hardness testing. A process-focused factory will have these parameters documented and controlled, not left to operator discretion.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-24

### Answer 9

Manage the trial as a mini-project with clear gates. Establish a milestone plan with the factory: 1) Kick-off and drawing review confirmation; 2) Raw material certification approval; 3) First-off sample approval from the press; 4) Full trial batch completion and inspection report submission; 5) Your final sign-off.

At each gate, define the deliverable (e.g., signed inspection report, sample pieces). This structure forces transparency and early issue identification. Also, clarify the change management process upfront.

If a minor drawing tweak is needed after the trial, how will the cost and timeline impact be communicated? A clear process here prevents surprises later.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-24

### Answer 10

Your inspection criteria must be agreed upon before the trial. Beyond the drawing, define AQL levels for critical, major, and minor characteristics. For hardness and conductivity, specify the test frequency (e.g., every 50 pieces) and the acceptable range. The factory should provide you with their Inspection Control Plan.

During production, ask how they perform in-process checks. Do they use go/no-go gauges for key dimensions at the press every 15 minutes? How are out-of-spec parts handled? Witness their final audit process: are they 100% inspecting for visual defects like burrs or scratches? A robust quality system will have clear checkpoints, calibrated equipment, and a closed-loop corrective action system for any deviations found.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-24

## Related Resources

- [Hardware Manufacturing Q&A](https://www.jaterson.com/qa/hardware-manufacturing/)
- [Hardware Components](https://www.jaterson.com/products/hardware-components/)
- [Hardware Manufacturing](https://www.jaterson.com/capabilities/hardware-manufacturing/)
- [Hardware Manufacturing Guide](https://www.jaterson.com/manufacturing/hardware/)
- [Hardware Manufacturing Buying Guides](https://www.jaterson.com/buying/hardware/)
- [Hardware Tool Handles](https://www.jaterson.com/injection-molding-for-hardware-tool-handles/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Hardware & Tool Parts](https://www.jaterson.com/knowledge/hardware-tool-parts/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to evaluate a custom copper component manufacturer for power tools?",
        "text": "I&#039;m the NPI engineer for a new high-performance cordless drill platform. We&#039;re in the final validation phase before mass production, and the custom copper commutator segments are a critical path item. Our previous supplier for a similar component failed us—inconsistent material purity led to variable electrical conductivity and accelerated brush wear during extended field testing, causing motor failures. We&#039;ve received a competitive quote from a new potential manufacturer, JATERSON, for a 500-piece trial batch. My immediate dilemma is that a low price alone doesn&#039;t guarantee they can meet our stringent specs. I need to validate their capability thoroughly but efficiently. The part must be made from C11000 copper for optimal conductivity, with several stamped features holding a tolerance of ±0.05mm. The hardness must also be consistent to ensure long-term durability under high RPM and thermal cycling. Beyond a generic ISO certificate, what specific evidence, process data, or on-site checks should I insist on during this trial phase to make a definitive go/no-go decision for the upcoming 50,000-unit production order? I need a actionable checklist to separate a truly capable manufacturer from one that just looks good on paper.",
        "answerCount": 10,
        "upvoteCount": 13,
        "datePublished": "2026-09-24T07:25:29Z",
        "dateModified": "2026-09-24T07:37:43Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "Your primary requirements are material compliance (C11000 copper), dimensional precision (±0.05mm), and consistent mechanical properties (hardness). The validation process must confirm the factory&#039;s control over these three pillars. Start by formally requesting a detailed Process Validation Plan for the trial batch. This should outline their intended method for material verification, the stamping/forming process parameters, and their inspection protocol. This document itself is a first indicator of their engineering discipline. From a cost analysis perspective, a competitive quote for copper components hinges on several factors you should scrutinize. First is material sourcing and verification . Insist on a Mill Test Certificate (MTC) or Certificate of Conformance for the C11000 copper coil/strip used for your trial, traceable to a specific heat lot. Some suppliers may try to use off-spec or recycled material to cut costs, which directly impacts conductivity and longevity. Second is tooling and process capability . The cost should reflect the precision of the stamping dies required to hold ±0.05mm. Ask for a capability study (Cp/Cpk) data for similar tight-tolerance features they have produced. If they cannot provide this, it&#039;s a major red flag. Third, consider secondary operations . Does the part require any deburring, plating, or heat treatment? Ensure these are explicitly quoted and that the factory has direct control or vetted sub-suppliers for these steps. Lead time for the trial and subsequent mass production is influenced by tooling status, sampling rigor, and production scheduling. For a new part, the lead time should account for final tool fabrication or modification, first article inspection (FAI), and your sample approval. A reliable factory will provide a timeline with clear milestones (e.g., &quot;Tool try-out samples ready in 15 working days&quot;). Be wary of quotes promising an unrealistically short lead time, as it often means skipping essential validation steps. For mass production, understand their capacity loading for the stamping presses that will run your part. Ask for their typical production cycle time per thousand pieces and their changeover procedures to gauge their ability to meet your future volume demands without significant delays. The core of supplier judgment lies in evidence-based evaluation. Request these documents before and after the trial: 1) Material Certs (MTC) for the copper; 2) First Article Inspection Report (based on your full drawing); 3) Dimensional data from a statistically significant sample of the trial run (not just 3 pieces); 4) Results of in-house conductivity and hardness tests. If a visit is feasible, an on-site audit should focus on the stamping/pressing shop floor. Check the age and maintenance records of the relevant presses and progressive dies. Observe their in-process quality checks: are operators using calibrated gauges (pin gauges, micrometers) at defined intervals? Look for evidence of Statistical Process Control (SPC) charts running live near the machines. Discuss their tool maintenance schedule—preventive maintenance is critical for holding tight tolerances over long production runs. Finally, review their non-conforming material process. How are rejected parts segregated and documented? A clear system indicates a mature quality culture. To balance cost and risk, do not use the trial price as the final benchmark. Instead, use the trial to establish a &quot;qualified process.&quot; Negotiate the mass production price based on the demonstrated, validated process from the trial. This aligns their incentive with delivering consistent quality. The most critical on-site check is witnessing the production of your parts and randomly selecting samples for immediate measurement with your own gauges. This real-time verification is irreplaceable. Your confidence should come not from promises, but from documented data and observed process control.",
            "upvoteCount": 13,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#acceptedAnswer",
            "datePublished": "2026-09-24T09:43:00Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "Judging the tooling is paramount for long-term success. For copper stamping, the die&#039;s construction determines part consistency. Inquire about the die steel grade (e.g., D2, SKD11 for high wear resistance) and its hardness (HRC). A manufacturer using inferior steel will see rapid wear, causing the ±0.05mm tolerance to drift within the first production batches. Ask for their projected tool life for a similar copper part and their maintenance protocol. Do they perform regular die inspections and sharpening? A reliable partner will have a scheduled maintenance plan and spare components for critical die sections. This directly impacts your total cost of ownership and prevents unplanned downtime during your mass production runs.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-2",
            "datePublished": "2026-09-24T09:30:19Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "While C11000 is specified, understanding the trade-offs is key. Pure copper (C11000) offers excellent conductivity but is softer. For applications requiring higher strength, a tellurium-bearing copper like C14500 might be suggested, offering better machinability with a minor conductivity sacrifice. A capable manufacturer will discuss these options if relevant, not just blindly follow the print. To validate, request they perform a simple conductivity test (using a eddy current or micro-ohmmeter) on random trial samples and provide the results. Also, ask about their incoming material inspection—do they verify alloy composition via spark test or XRF gun? This ensures the raw material batch matches the certs and your performance requirements.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-3",
            "datePublished": "2026-09-24T09:21:19Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The part&#039;s function in the assembly dictates critical-to-quality dimensions beyond the drawing. For a commutator segment, the tangency of the stamped edges and the surface finish where the brush makes contact are functionally vital. Discuss with the factory engineer how they plan to control these features. During the trial, you should perform a functional test: assemble the samples into a motor test jig and run a high-cycle durability test, monitoring for abnormal sparking or wear. This end-use validation is the ultimate test. Also, consider the part&#039;s interaction during assembly—are the locating features precise enough for automated feeding? Request a sample of 200 pieces to test in your assembly line for feed and fit issues before approving the mass production tool.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-4",
            "datePublished": "2026-09-24T09:10:17Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The design of the stamping die directly affects part quality and cost. Key decisions include the strip layout (which impacts material utilization), the number of stations in the progressive die, and the location of critical forming operations. A well-designed die will have pilot pins for precise strip guidance, essential for holding your tight tolerances. Discuss the die design with the factory: why did they choose a specific blanking clearance? An incorrect clearance will cause excessive burrs or part deformation. Also, ask about their plan for die try-out and adjustment. A competent team will build in adjustability for critical features to fine-tune the part during sampling, rather than requiring a costly and time-consuming die rework.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-5",
            "datePublished": "2026-09-24T09:05:52Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "From a production scheduling view, the trial batch is a test of their project coordination. Ask for a detailed schedule that includes raw material procurement lead time, tooling setup, trial run, inspection, and packaging/shipping. A major risk is your trial being deprioritized. To mitigate, ask about their current shop floor loading for the required press tonnage during your proposed trial dates. Can they dedicate a press and operator for a continuous run, or will your job be split across shifts? Inconsistent production conditions can skew trial results. For mass production, inquire about their safety stock policy for raw copper coil and their lead time for replenishment to avoid material shortages delaying your orders.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-6",
            "datePublished": "2026-09-24T08:32:22Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Beyond material purity, regulatory compliance is a growing concern. You must ensure the copper and any secondary finishes (like nickel plating) comply with RoHS and REACH regulations. Request a Material Declaration sheet for the finished part. Furthermore, due diligence on conflict minerals (Tin, Tantalum, Tungsten, Gold, and their derivatives) is increasingly required. While copper itself is not a 3TG mineral, the factory&#039;s smelter sources should be reviewed. A professional manufacturer will have a policy and be able to provide documentation demonstrating responsible sourcing, which protects your brand from supply chain compliance risks.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-7",
            "datePublished": "2026-09-24T08:12:31Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For copper stamping, the process parameters are critical. Key settings include press speed, tonnage, and feed precision. Variations here cause defects like burrs, dimensional inconsistency, or micro-cracks. During a visit, observe the press running. Is the feed mechanism steady and precise? Ask the operator for their parameter sheet for a similar job. Post-stamping, processes like stress relief annealing might be used to control hardness. If applicable, request the recipe (temperature, time, atmosphere) and their method for validating the anneal&#039;s effectiveness, such as periodic hardness testing. A process-focused factory will have these parameters documented and controlled, not left to operator discretion.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-8",
            "datePublished": "2026-09-24T08:00:52Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Manage the trial as a mini-project with clear gates. Establish a milestone plan with the factory: 1) Kick-off and drawing review confirmation; 2) Raw material certification approval; 3) First-off sample approval from the press; 4) Full trial batch completion and inspection report submission; 5) Your final sign-off. At each gate, define the deliverable (e.g., signed inspection report, sample pieces). This structure forces transparency and early issue identification. Also, clarify the change management process upfront. If a minor drawing tweak is needed after the trial, how will the cost and timeline impact be communicated? A clear process here prevents surprises later.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-9",
            "datePublished": "2026-09-24T07:55:31Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Your inspection criteria must be agreed upon before the trial. Beyond the drawing, define AQL levels for critical, major, and minor characteristics. For hardness and conductivity, specify the test frequency (e.g., every 50 pieces) and the acceptable range. The factory should provide you with their Inspection Control Plan. During production, ask how they perform in-process checks. Do they use go/no-go gauges for key dimensions at the press every 15 minutes? How are out-of-spec parts handled? Witness their final audit process: are they 100% inspecting for visual defects like burrs or scratches? A robust quality system will have clear checkpoints, calibrated equipment, and a closed-loop corrective action system for any deviations found.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/evaluate-custom-copper-component-manufacturer-power-tools.html#suggestedAnswer-10",
            "datePublished": "2026-09-24T07:37:43Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Hardware Manufacturing Q&A", "item": "https://www.jaterson.com/qa/hardware-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "How to evaluate a custom copper component manufacturer for power tools?"}
      ]
    }
]
```