---
title: "How to ensure non-slip tool handle durability in use?"
description: "QA Lead asks about ensuring grip durability and adhesion. The answer covers material selection, overmolding processes, and testing protocols to prevent field failures and ensure consistent quality."
url: "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html"
language: "en"
type: "Q&A"
category: "Plastic Components Q&A"
datePublished: "2026-10-22"
dateModified: "2026-10-22"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# How to ensure non-slip tool handle durability in use?

## Question

 I am currently managing the incoming inspection for a new line of professional screwdrivers, and we are facing a critical failure rate with the non-slip handles. During our initial drop tests and salt spray checks, the TPE overmold is separating from the polypropylene core on about 15% of the units. This is a massive red flag for our upcoming launch, and I need to fly out to audit the supplier next week. I need to know exactly what to look for on their production line to determine if this is a material compatibility issue, a molding process defect, or poor surface preparation. We cannot afford a recall, so I need to establish stricter acceptance criteria and understand if their current tooling setup is capable of delivering consistent adhesion. What specific manufacturing parameters and inspection checkpoints should I demand during the audit to ensure the grip integrity meets our industrial standards? 

## Answers
                            
### Answer 1 — Best Answer

The 15% delamination rate you are observing indicates a systemic failure in the overmolding process, likely stemming from insufficient thermal management or material incompatibility between the substrate and the overmold. To resolve this, you must first enforce strict material specifications. For a polypropylene core, the TPE (Thermoplastic Elastomer) must be specifically formulated with a polar modifier or a compatible base resin to ensure **chemical bonding**. If the supplier is using a general-purpose TPE grade to cut costs, it will not bond adequately to the PP, leading to the peeling you see during drop tests. During the audit, request the material data sheets (MDS) and verify that the TPE grade is recommended for bonding to PP. Furthermore, visual inspection of the failed interface is crucial; if the PP surface is clean and smooth when the TPE peels off, it is an adhesion failure. If the PP is torn or rough, it is a cohesive failure of the substrate, which actually indicates good bonding but insufficient core strength.

From a manufacturing standpoint, the injection parameters are the most critical variable to audit. Chemical bonding requires the substrate to be above a certain temperature when the overmold is injected. You need to verify that the supplier is using a **rotary mold** or a core-back process that minimizes the cooling time of the PP substrate before the TPE is shot. If the PP has cooled below the glass transition temperature or too close to the mold temperature, the TPE cannot melt the surface layer of the PP to create the molecular interlock required for adhesion. Check their process logs for the melt temperature of the TPE; it should be at the upper end of the processing window to maximize flow and wetting of the substrate. Additionally, inspect the mold surface for any signs of mold release agents; these are the enemy of overmolding and will instantly kill chemical bonding.

Regarding cost and lead time, correcting this issue may require a material switch or a process optimization rather than a full tool rebuild, which is favorable. Switching to a compatible TPE grade typically adds a marginal cost per unit but prevents expensive field failures. However, if the supplier's machine tonnage or clamping force is insufficient to hold the core during the second shot, or if the mold cooling channels are poorly designed, leading to uneven temperatures, you may face lead time delays of 4-6 weeks for tool modifications or process validation trials. You must ask to see their **in-process torque testing** data. A robust supplier should be testing the bond strength by pulling or twisting the handle off the shank at regular intervals during production. If they cannot provide this data, their quality control system is insufficient for OEM standards.

Finally, judge the supplier by their housekeeping and material handling. TPE is highly hygroscopic; if it is not dried properly according to the manufacturer's specifications (usually 2-4 hours at 80°C), moisture will create voids and weaken the bond. Look for desiccant dryers on their machines and check the hopper loaders. If you see open bags of material sitting out, or if they cannot show you the drying logs, reject the line immediately. Consistency in 2026 manufacturing relies on automated material handling systems, not manual labor. A supplier that invests in proper drying and closed-loop temperature control is a partner capable of delivering the zero-defect target you require.

**status:** accepted
**Author:** Daniel Yang
**Date:** 2026-10-22

### Answer 2

When evaluating the assembly of these handles, the primary concern is the tolerance stack-up between the metal shank, the plastic core, and the overmold. If the inner diameter of the PP core is too large or the metal shank tolerance is on the lower limit, the mechanical engagement required to prevent spinning during high-torque applications will be compromised.

During your audit, check the fixtures used to insert the metal bar into the plastic core. If they are worn or lack precision, you will see gaps that allow the shank to rotate. Even if the overmold adhesion is perfect, if the core spins on the metal shank, the tool is non-functional. You should verify that the supplier is performing a torque-to-failure test on a statistical sampling basis to ensure the assembly integrity exceeds the maximum torque the screwdriver can generate.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-10-22

### Answer 3

The texture on the mold surface is what ultimately provides the non-slip functionality, and this is purely a function of the machining and finishing of the cavity steel. For overmolded TPE, the texture must be etched deeply enough to maintain definition after thousands of cycles, as TPE can stick to polished surfaces.

During the audit, examine the mold texture under a magnifying glass. If the texture is rounded or worn, the grip will feel smooth regardless of the material used. Furthermore, check the ejection mechanism.

If the mold relies on draft angles that are too steep to accommodate a deep texture, the supplier may have polished the texture to prevent sticking, which defeats the non-slip purpose. The texture design must be balanced with the draft angle to ensure the part ejects cleanly without damaging the microscopic ridges that create friction.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-10-22

### Answer 4

Material selection is the root cause of many adhesion issues, but it also dictates the long-term aging of the handle. While TPE is the standard, there are different classes: SEBS (styrene-ethylene-butylene-styrene) based TPEs offer better UV resistance and flexibility, while TPU (thermoplastic polyurethane) offers superior abrasion resistance but is harder to process and more prone to hydrolysis if not dried perfectly.

For a professional tool used in varied environments, a SEBS-based TPE with a Shore A hardness of 50 to 60 usually provides the best balance of comfort and oil resistance. Ask the supplier if they have conducted accelerated aging tests. A handle that feels great out of the box but becomes sticky or brittle after six months of exposure to industrial solvents is a failure. The material cost difference is negligible compared to the warranty return costs.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-10-22

### Answer 5

From a tooling maintenance perspective, the separation you are seeing could also be caused by venting issues in the mold. Overmolding traps air between the substrate and the cavity wall; if this air cannot escape quickly enough, it acts as a barrier, preventing the molten TPE from touching the PP surface.

This results in "kiss-offs" where the parts look bonded but are only held together by atmospheric pressure. Inspect the mold vents, specifically on the parting line of the overmold cavity. If they are clogged with residue or too shallow, the air trap is inevitable.

A supplier with a rigorous preventative maintenance schedule will clean these vents regularly. If their maintenance logs are non-existent or the vents show buildup of TPE gas, this is a major red flag for process stability.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-10-22

### Answer 6

Design for Manufacturability (DFM) feedback is essential to prevent the sink marks that often occur where the TPE meets the PP substrate, usually near geometric transitions. If the wall thickness of the TPE overmold varies drastically—transitioning from a thin grip area to a thick bolster area—the differential cooling will cause sinks, which not only look bad but also create stress concentrations in the material.

When reviewing the part design with the supplier, look for uniform wall thickness in the overmold. If the design requires thick sections for strength, they should utilize coring or ribs on the inside of the PP core to maintain a uniform TPE thickness. Ignoring this rule forces the molder to pack the part with high pressure, inducing internal stress that leads to warpage or eventual cracking of the overmold.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-10-22

### Answer 7

In terms of application performance, the "non-slip" characteristic must be validated under realistic conditions, not just dry lab tests. A handle that performs well in a clean room might fail instantly on a greasy engine block. During the audit, ask to see if they have a friction coefficient test setup or if they validate grip with wet and oily media.

The surface energy of the TPE must be compatible with the oils it will encounter; some TPEs swell when exposed to petroleum products, becoming soft and losing their dimensional stability. A robust validation protocol includes soaking the handles in cutting oil for 24 hours and then re-testing the adhesion and hardness. If the supplier relies solely on visual inspection, they are missing the functional requirements of a professional tool.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-10-22

### Answer 8

Project management for this type of defect requires a rigorous change management process. If the supplier suggests a material swap to fix the adhesion, they must treat it as a formal engineering change order (ECO) with full traceability.

You need to ensure that the new material is qualified not just for adhesion, but for color fastness and shrinkage rates. Different TPE grades shrink differently; if the new material shrinks more, it could warp the handle or expose the PP core at the seams.

The project timeline must account for a pilot run of at least 5,000 to 10,000 units to monitor the process capability (Cpk) of the new parameters. Do not allow a "trial by error" on the full production run; the risk to your brand reputation is too high.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-10-22

### Answer 9

Gate location design is critical for the feel of the handle. If the gate is placed on a gripping surface, the vestige (the small nub left after trimming) can be sharp or create a slick spot. For overmolding, submarine gates or hot runner pinpoint gates are preferred to hide the mark. However, the location also affects how the TPE flows around the PP core.

If the gate is too far from the areas most prone to peeling, the TPE temperature will drop too low to bond effectively by the time it reaches those zones. Review the mold flow analysis if available. It should show a balanced fill pattern that ensures the TPE encapsulates the core while still above the melting threshold. A poor gate design is a tooling error that cannot be fixed by process adjustments alone.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-10-22

### Answer 10

The injection process parameters for the second shot (the TPE) are significantly different from the first shot. TPE requires higher injection speeds to prevent premature freezing, but lower packing pressures to avoid over-packing the rubber, which makes the part hard and uncomfortable. During the audit, look at the process screen. Is the packing pressure profile decaying smoothly?

If they are using high packing pressure to try to force the material into the crevices to fix the adhesion, they are treating the symptom, not the cause. This will likely result in parts that stick in the mold or flash, creating sharp edges that will be cut off during post-processing, ruining the non-slip texture. The process window for TPE is narrow; the operator should not be making constant adjustments.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-10-22

## Related Resources

- [Plastic Components Q&A](https://www.jaterson.com/qa/plastic-components/)
- [Plastic Components](https://www.jaterson.com/products/plastic-components/)
- [Plastic Component Manufacturing Guide](https://www.jaterson.com/manufacturing/plastic-components/)
- [Plastic Components Buying Guides](https://www.jaterson.com/buying/plastic-components/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Plastic Components](https://www.jaterson.com/knowledge/plastic-components/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to ensure non-slip tool handle durability in use?",
        "text": "I am currently managing the incoming inspection for a new line of professional screwdrivers, and we are facing a critical failure rate with the non-slip handles. During our initial drop tests and salt spray checks, the TPE overmold is separating from the polypropylene core on about 15% of the units. This is a massive red flag for our upcoming launch, and I need to fly out to audit the supplier next week. I need to know exactly what to look for on their production line to determine if this is a material compatibility issue, a molding process defect, or poor surface preparation. We cannot afford a recall, so I need to establish stricter acceptance criteria and understand if their current tooling setup is capable of delivering consistent adhesion. What specific manufacturing parameters and inspection checkpoints should I demand during the audit to ensure the grip integrity meets our industrial standards?",
        "answerCount": 10,
        "upvoteCount": 7,
        "datePublished": "2026-10-22T00:34:06Z",
        "dateModified": "2026-10-22T00:38:45Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The 15% delamination rate you are observing indicates a systemic failure in the overmolding process, likely stemming from insufficient thermal management or material incompatibility between the substrate and the overmold. To resolve this, you must first enforce strict material specifications. For a polypropylene core, the TPE (Thermoplastic Elastomer) must be specifically formulated with a polar modifier or a compatible base resin to ensure chemical bonding . If the supplier is using a general-purpose TPE grade to cut costs, it will not bond adequately to the PP, leading to the peeling you see during drop tests. During the audit, request the material data sheets (MDS) and verify that the TPE grade is recommended for bonding to PP. Furthermore, visual inspection of the failed interface is crucial; if the PP surface is clean and smooth when the TPE peels off, it is an adhesion failure. If the PP is torn or rough, it is a cohesive failure of the substrate, which actually indicates good bonding but insufficient core strength. From a manufacturing standpoint, the injection parameters are the most critical variable to audit. Chemical bonding requires the substrate to be above a certain temperature when the overmold is injected. You need to verify that the supplier is using a rotary mold or a core-back process that minimizes the cooling time of the PP substrate before the TPE is shot. If the PP has cooled below the glass transition temperature or too close to the mold temperature, the TPE cannot melt the surface layer of the PP to create the molecular interlock required for adhesion. Check their process logs for the melt temperature of the TPE; it should be at the upper end of the processing window to maximize flow and wetting of the substrate. Additionally, inspect the mold surface for any signs of mold release agents; these are the enemy of overmolding and will instantly kill chemical bonding. Regarding cost and lead time, correcting this issue may require a material switch or a process optimization rather than a full tool rebuild, which is favorable. Switching to a compatible TPE grade typically adds a marginal cost per unit but prevents expensive field failures. However, if the supplier&#039;s machine tonnage or clamping force is insufficient to hold the core during the second shot, or if the mold cooling channels are poorly designed, leading to uneven temperatures, you may face lead time delays of 4-6 weeks for tool modifications or process validation trials. You must ask to see their in-process torque testing data. A robust supplier should be testing the bond strength by pulling or twisting the handle off the shank at regular intervals during production. If they cannot provide this data, their quality control system is insufficient for OEM standards. Finally, judge the supplier by their housekeeping and material handling. TPE is highly hygroscopic; if it is not dried properly according to the manufacturer&#039;s specifications (usually 2-4 hours at 80°C), moisture will create voids and weaken the bond. Look for desiccant dryers on their machines and check the hopper loaders. If you see open bags of material sitting out, or if they cannot show you the drying logs, reject the line immediately. Consistency in 2026 manufacturing relies on automated material handling systems, not manual labor. A supplier that invests in proper drying and closed-loop temperature control is a partner capable of delivering the zero-defect target you require.",
            "upvoteCount": 7,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#acceptedAnswer",
            "datePublished": "2026-10-22T01:34:04Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "When evaluating the assembly of these handles, the primary concern is the tolerance stack-up between the metal shank, the plastic core, and the overmold. If the inner diameter of the PP core is too large or the metal shank tolerance is on the lower limit, the mechanical engagement required to prevent spinning during high-torque applications will be compromised. During your audit, check the fixtures used to insert the metal bar into the plastic core. If they are worn or lack precision, you will see gaps that allow the shank to rotate. Even if the overmold adhesion is perfect, if the core spins on the metal shank, the tool is non-functional. You should verify that the supplier is performing a torque-to-failure test on a statistical sampling basis to ensure the assembly integrity exceeds the maximum torque the screwdriver can generate.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-2",
            "datePublished": "2026-10-22T01:33:19Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The texture on the mold surface is what ultimately provides the non-slip functionality, and this is purely a function of the machining and finishing of the cavity steel. For overmolded TPE, the texture must be etched deeply enough to maintain definition after thousands of cycles, as TPE can stick to polished surfaces. During the audit, examine the mold texture under a magnifying glass. If the texture is rounded or worn, the grip will feel smooth regardless of the material used. Furthermore, check the ejection mechanism. If the mold relies on draft angles that are too steep to accommodate a deep texture, the supplier may have polished the texture to prevent sticking, which defeats the non-slip purpose. The texture design must be balanced with the draft angle to ensure the part ejects cleanly without damaging the microscopic ridges that create friction.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-3",
            "datePublished": "2026-10-22T01:32:56Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Material selection is the root cause of many adhesion issues, but it also dictates the long-term aging of the handle. While TPE is the standard, there are different classes: SEBS (styrene-ethylene-butylene-styrene) based TPEs offer better UV resistance and flexibility, while TPU (thermoplastic polyurethane) offers superior abrasion resistance but is harder to process and more prone to hydrolysis if not dried perfectly. For a professional tool used in varied environments, a SEBS-based TPE with a Shore A hardness of 50 to 60 usually provides the best balance of comfort and oil resistance. Ask the supplier if they have conducted accelerated aging tests. A handle that feels great out of the box but becomes sticky or brittle after six months of exposure to industrial solvents is a failure. The material cost difference is negligible compared to the warranty return costs.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-4",
            "datePublished": "2026-10-22T01:26:14Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "From a tooling maintenance perspective, the separation you are seeing could also be caused by venting issues in the mold. Overmolding traps air between the substrate and the cavity wall; if this air cannot escape quickly enough, it acts as a barrier, preventing the molten TPE from touching the PP surface. This results in &quot;kiss-offs&quot; where the parts look bonded but are only held together by atmospheric pressure. Inspect the mold vents, specifically on the parting line of the overmold cavity. If they are clogged with residue or too shallow, the air trap is inevitable. A supplier with a rigorous preventative maintenance schedule will clean these vents regularly. If their maintenance logs are non-existent or the vents show buildup of TPE gas, this is a major red flag for process stability.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-5",
            "datePublished": "2026-10-22T01:26:00Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Design for Manufacturability (DFM) feedback is essential to prevent the sink marks that often occur where the TPE meets the PP substrate, usually near geometric transitions. If the wall thickness of the TPE overmold varies drastically—transitioning from a thin grip area to a thick bolster area—the differential cooling will cause sinks, which not only look bad but also create stress concentrations in the material. When reviewing the part design with the supplier, look for uniform wall thickness in the overmold. If the design requires thick sections for strength, they should utilize coring or ribs on the inside of the PP core to maintain a uniform TPE thickness. Ignoring this rule forces the molder to pack the part with high pressure, inducing internal stress that leads to warpage or eventual cracking of the overmold.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-6",
            "datePublished": "2026-10-22T01:14:16Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "In terms of application performance, the &quot;non-slip&quot; characteristic must be validated under realistic conditions, not just dry lab tests. A handle that performs well in a clean room might fail instantly on a greasy engine block. During the audit, ask to see if they have a friction coefficient test setup or if they validate grip with wet and oily media. The surface energy of the TPE must be compatible with the oils it will encounter; some TPEs swell when exposed to petroleum products, becoming soft and losing their dimensional stability. A robust validation protocol includes soaking the handles in cutting oil for 24 hours and then re-testing the adhesion and hardness. If the supplier relies solely on visual inspection, they are missing the functional requirements of a professional tool.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-7",
            "datePublished": "2026-10-22T01:00:59Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Project management for this type of defect requires a rigorous change management process. If the supplier suggests a material swap to fix the adhesion, they must treat it as a formal engineering change order (ECO) with full traceability. You need to ensure that the new material is qualified not just for adhesion, but for color fastness and shrinkage rates. Different TPE grades shrink differently; if the new material shrinks more, it could warp the handle or expose the PP core at the seams. The project timeline must account for a pilot run of at least 5,000 to 10,000 units to monitor the process capability (Cpk) of the new parameters. Do not allow a &quot;trial by error&quot; on the full production run; the risk to your brand reputation is too high.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-8",
            "datePublished": "2026-10-22T00:53:30Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Gate location design is critical for the feel of the handle. If the gate is placed on a gripping surface, the vestige (the small nub left after trimming) can be sharp or create a slick spot. For overmolding, submarine gates or hot runner pinpoint gates are preferred to hide the mark. However, the location also affects how the TPE flows around the PP core. If the gate is too far from the areas most prone to peeling, the TPE temperature will drop too low to bond effectively by the time it reaches those zones. Review the mold flow analysis if available. It should show a balanced fill pattern that ensures the TPE encapsulates the core while still above the melting threshold. A poor gate design is a tooling error that cannot be fixed by process adjustments alone.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-9",
            "datePublished": "2026-10-22T00:48:42Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The injection process parameters for the second shot (the TPE) are significantly different from the first shot. TPE requires higher injection speeds to prevent premature freezing, but lower packing pressures to avoid over-packing the rubber, which makes the part hard and uncomfortable. During the audit, look at the process screen. Is the packing pressure profile decaying smoothly? If they are using high packing pressure to try to force the material into the crevices to fix the adhesion, they are treating the symptom, not the cause. This will likely result in parts that stick in the mold or flash, creating sharp edges that will be cut off during post-processing, ruining the non-slip texture. The process window for TPE is narrow; the operator should not be making constant adjustments.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/ensure-non-slip-tool-handle-durability-use.html#suggestedAnswer-10",
            "datePublished": "2026-10-22T00:38:45Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Plastic Components Q&A", "item": "https://www.jaterson.com/qa/plastic-components/"}          ,{"@type": "ListItem", "position": 4, "name": "How to ensure non-slip tool handle durability in use?"}
      ]
    }
]
```