# What causes dimensional variation and sink marks in closure cap hand tools?

## Question

 I'm dealing with a frustrating quality issue on a production run of 5,000 manual torque wrenches used for applying consistent torque to beverage closure caps. These are plastic-handled tools with a metal drive square. During final inspection, we're seeing a 30% rejection rate due to two intertwined problems: first, the critical bore diameter for the metal insert is inconsistently sized, often below the lower specification limit, causing a loose fit and potential failure in use. Second, the plastic handle shows visible sink marks and flow lines near the gate area, which our customer has flagged as unacceptable for appearance. This is a repeat order from a long-term client, and the previous batches were fine. The pressure is on to identify the root cause quickly and get the batch back on track without delaying shipment. From a manufacturing perspective, where should I start investigating? Is this likely a molding process issue, a tooling problem, or something with the material itself? I need a systematic approach to pinpoint the cause and implement a corrective action that prevents recurrence. 

## Answers
                            
### Answer 1 — Best Answer

When facing simultaneous dimensional and appearance defects in an injection molded part, the core differences often lie in whether the root cause is primarily driven by the molding process parameters, the tool condition, or the material behavior. Dimensional undershoot, like a bore diameter being consistently small, typically points to insufficient packing pressure or time, excessive shrinkage, or a tool that is machined oversize. Appearance defects like sink marks and flow lines are usually symptoms of inadequate packing in thick sections, low melt temperature, or poor venting. The key is to determine if these issues are linked to a single underlying factor or are separate problems requiring individual attention.

Start by isolating the variables. For the dimensional issue, first verify your measurement system's accuracy and repeatability. Then, check if the undersize is consistent across all cavities if it's a multi-cavity mold. A consistent error across all parts suggests a systemic process or tool design issue. If only specific cavities are affected, focus on tool wear or variations in cooling. For the sink marks and flow lines, examine their location relative to the gate and thick sections. Sink marks occur where the material shrinks as it cools without sufficient material packed into the area. Flow lines indicate the melt front cooling too quickly or hesitating as it flows, often due to low injection speed or mold temperature.

The applicable scenarios for common root causes are as follows. If both defects appeared suddenly in a previously stable process, investigate recent changes: a new material batch (check moisture content and MFI), maintenance on the mold (possible vent blockage or damage), or adjustments to machine settings. If the issues have been gradually worsening, progressive tool wear is a likely culprit. For the bore dimension, if the metal insert is molded-in, the shrinkage around it can be highly sensitive to holding pressure and cooling time. **Increase holding pressure and extend holding time** to pack more material into the cavity and compensate for shrinkage. Ensure the melt temperature is within the material's recommended range to maintain proper viscosity for packing.

For the appearance defects, increasing injection speed can help eliminate flow lines by maintaining a hot melt front. To address sink marks, ensure adequate cooling time and optimize cooling channel flow around thick sections. If the gate is too small or poorly located, it may freeze off too early, preventing effective packing. This might require a tool modification, but as an immediate process fix, try raising the mold temperature slightly to delay gate freeze. Also, confirm the material is properly dried; residual moisture can cause both surface defects and dimensional instability.

Your selection advice for corrective action should follow a structured hierarchy. First, implement and document process optimization: conduct a Design of Experiments (DOE) varying holding pressure, injection speed, and mold temperature. Monitor the bore dimension and surface quality. If process adjustments alone cannot bring both characteristics into spec simultaneously, the trade-off may indicate a design limitation. The next step is a tooling review. Inspect the mold for wear in the bore core pin and check venting channels for blockage. Finally, engage with your material supplier to verify the resin's shrinkage properties and consider a grade with a lower shrinkage rate if other solutions are insufficient. The goal is to restore production with robust process windows, not just temporary fixes.

**status:** accepted
**Author:** Emily Chen
**Date:** 2026-08-25

### Answer 2

Looking at the described defects from a design perspective, the coexistence of sink marks and dimensional variation often points to inherent design challenges. The location of sink marks near the gate suggests a potential wall thickness transition or a rib/base intersection that is too thick. This creates a thermal mass that cools slower, leading to shrinkage sinks.

A design review should assess if the wall thickness around the bore can be made more uniform or if cosmetic features like texture can help disguise minor sinks. For the bore dimension, if it's a core pin for a metal insert, the draft angle and pin straightness are critical. A lack of draft can cause part sticking and deformation during ejection, affecting the measured diameter.

Furthermore, the gate size and location directly influence packing efficiency. A small gate may freeze early, preventing adequate compensation for shrinkage. A DFM report would recommend modifying the mold to increase gate size or relocate it to a less cosmetic area, and potentially redesigning thick sections to incorporate coring to reduce mass and promote even cooling.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-08-25

### Answer 3

To systematically address this, implement a layered quality response. First, quarantine the affected batch and segregate parts by cavity number if possible. Perform a Gage R&R study on the bore measurement equipment to rule out measurement error. Classify the defects: the dimensional undersize is likely a critical defect if it affects function, while sink marks may be major. Initiate an 8D report.

For root cause analysis, collect data on process parameters from the good and bad batches. Check the first-off and last-off samples from each production shift. Inspect the mold for damage or wear on the core pins causing the bore. A key checkpoint is to increase the frequency of in-process checks (IPQC) to every 30 minutes, measuring the bore diameter and visually inspecting for sinks. This data will show if the issue is drifting over time. The corrective action should include updating the control plan with tighter monitoring limits for holding pressure and mold temperature, and training operators on the new visual standards for sink marks.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-08-25

### Answer 4

The material's behavior is central to both defects. The shrinkage that causes the bore to be undersized and the sink marks are directly related to the polymer's crystallization and thermal contraction. If you're using a semi-crystalline material like polypropylene or nylon, shrinkage is higher and more sensitive to processing conditions.

An amorphous material like ABS might show less shrinkage but can still sink if packed poorly. First, verify the material data sheet for the nominal shrinkage rate and compare it to the actual shrinkage you're calculating from the tool dimensions. Request a certificate of analysis from your material supplier for this batch to check the melt flow index (MFI); a higher MFI than specified can lead to easier flow but worse packing.

Moisture content is also critical; hygroscopic resins must be dried to below 0.02% to prevent surface defects. If process optimization hits a wall, consider switching to a material grade with a lower shrinkage factor or one that is filled with glass fibers for improved dimensional stability, though this may impact cost and surface finish.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-08-25

### Answer 5

If the metal drive square is a machined component inserted into the plastic, its consistency directly affects the assembly. However, the bore dimension issue is likely molded. Yet, from a machining standpoint, the mold itself is a precision tool. The core pins that form the bore are machined components.

Their wear or initial machining tolerance could be a factor. If the pins are worn, the bore will become larger, not smaller. An undersize bore suggests the pin might have been machined oversize, or there's a plating build-up. Inspect the pins for any damage or coating wear.

Also, consider the fixture used during mold machining; if it wasn't rigid, it could lead to micro-vibrations affecting the final pin diameter. For future tooling, specify a tighter tolerance on these core pins and consider using harder tool steels like H13 with proper heat treatment to resist wear. Surface finish on the pin also affects part release and shrinkage.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-08-25

### Answer 6

This situation impacts project milestones: shipment delay, potential cost of rework, and customer satisfaction. Immediate action is to communicate transparently with the customer, providing a preliminary containment plan and a timeline for root cause analysis. Internally, convene a cross-functional team (quality, manufacturing, tooling) to drive the investigation. Assess the impact on the production schedule: can you run another batch concurrently after implementing fixes, or do you need to rework the current batch?

If a mold modification is required, evaluate the lead time and cost against the value of the order and the customer relationship. Update the project risk register with this issue and develop a mitigation plan, such as approving a temporary deviation for minor appearance issues if the customer agrees, while guaranteeing functional performance. The key is to manage expectations and ensure all corrective actions are documented and signed off before resuming full production.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-08-25

### Answer 7

From a production line perspective, consistency is key. The sudden appearance of defects suggests a process drift or a change in operator practice. Review the standard work instructions for this job. Are the machine parameters (injection speed, holding pressure) set correctly and locked? Is the drying hopper maintained at the right temperature and time? Automate parameter monitoring if possible; use the machine's PLC to log key variables and set alarms for deviations.

For cycle time efficiency, there might be pressure to reduce cooling time, which can directly cause sink marks and dimensional variation. Ensure the cooling time is fixed and adequate. Also, check the robot or manual removal process; if parts are being ejected too forcefully or handled while still hot, they can deform. Implementing a fixture for post-molding cooling can help stabilize dimensions. The goal is to make the process robust and operator-proof through clear standards and automated checks.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-08-25

### Answer 8

The mold's condition is a prime suspect. For the bore dimension, inspect the core pins for wear, but also check for any bending or misalignment. A bent pin can create a tapered bore that measures undersize at one point. Use a pin gauge to check the actual pin diameter.

For sink marks, examine the cooling channels around the problematic area. Inefficient cooling leads to hot spots and sinks. Flush the channels to ensure they are not blocked. Also, check the venting depth and location; inadequate venting traps air, causing flow lines and burn marks, and can hinder packing.

If vents are clogged, clean them. If the mold has been in production for many cycles, consider the possibility of wear on the parting line, which can cause flash and affect packing pressure. A thorough mold maintenance, including polishing the cavity surface and checking all wear components, should be scheduled. For long-term solutions, consider adding conformal cooling or improving venting in the next mold revision.

**status:** suggested
**Author:** Jason Zhou
**Date:** 2026-08-25

### Answer 9

Beyond the factory floor, consider how these defects impact the tool's performance in the field. A loose metal insert due to an undersize bore could lead to the drive square spinning under torque, causing tool failure and potential injury. The sink marks, while cosmetic, might also be stress concentrators that reduce the handle's impact resistance.

To validate any process fix, conduct functional tests that simulate real use. Apply the specified torque repeatedly to samples from the corrected process and monitor for insert movement or handle cracking. This performance data is crucial for customer sign-off.

Also, engage with the customer's engineering team to understand their assembly process; perhaps a slight bore diameter deviation is acceptable if paired with a different insert design or adhesive. Aligning on functional requirements rather than just dimensional specs can sometimes open up practical solutions that get production moving again while ensuring end-use reliability.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-08-25

## Related Resources

- [General Manufacturing Q&A](https://www.jaterson.com/qa/general-manufacturing/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What causes dimensional variation and sink marks in closure cap hand tools?",
        "text": "I&#039;m dealing with a frustrating quality issue on a production run of 5,000 manual torque wrenches used for applying consistent torque to beverage closure caps. These are plastic-handled tools with a metal drive square. During final inspection, we&#039;re seeing a 30% rejection rate due to two intertwined problems: first, the critical bore diameter for the metal insert is inconsistently sized, often below the lower specification limit, causing a loose fit and potential failure in use. Second, the plastic handle shows visible sink marks and flow lines near the gate area, which our customer has flagged as unacceptable for appearance. This is a repeat order from a long-term client, and the previous batches were fine. The pressure is on to identify the root cause quickly and get the batch back on track without delaying shipment. From a manufacturing perspective, where should I start investigating? Is this likely a molding process issue, a tooling problem, or something with the material itself? I need a systematic approach to pinpoint the cause and implement a corrective action that prevents recurrence.",
        "answerCount": 9,
        "upvoteCount": 10,
        "datePublished": "2026-08-25T11:13:06Z",
        "dateModified": "2026-08-25T11:13:50Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "When facing simultaneous dimensional and appearance defects in an injection molded part, the core differences often lie in whether the root cause is primarily driven by the molding process parameters, the tool condition, or the material behavior. Dimensional undershoot, like a bore diameter being consistently small, typically points to insufficient packing pressure or time, excessive shrinkage, or a tool that is machined oversize. Appearance defects like sink marks and flow lines are usually symptoms of inadequate packing in thick sections, low melt temperature, or poor venting. The key is to determine if these issues are linked to a single underlying factor or are separate problems requiring individual attention. Start by isolating the variables. For the dimensional issue, first verify your measurement system&#039;s accuracy and repeatability. Then, check if the undersize is consistent across all cavities if it&#039;s a multi-cavity mold. A consistent error across all parts suggests a systemic process or tool design issue. If only specific cavities are affected, focus on tool wear or variations in cooling. For the sink marks and flow lines, examine their location relative to the gate and thick sections. Sink marks occur where the material shrinks as it cools without sufficient material packed into the area. Flow lines indicate the melt front cooling too quickly or hesitating as it flows, often due to low injection speed or mold temperature. The applicable scenarios for common root causes are as follows. If both defects appeared suddenly in a previously stable process, investigate recent changes: a new material batch (check moisture content and MFI), maintenance on the mold (possible vent blockage or damage), or adjustments to machine settings. If the issues have been gradually worsening, progressive tool wear is a likely culprit. For the bore dimension, if the metal insert is molded-in, the shrinkage around it can be highly sensitive to holding pressure and cooling time. Increase holding pressure and extend holding time to pack more material into the cavity and compensate for shrinkage. Ensure the melt temperature is within the material&#039;s recommended range to maintain proper viscosity for packing. For the appearance defects, increasing injection speed can help eliminate flow lines by maintaining a hot melt front. To address sink marks, ensure adequate cooling time and optimize cooling channel flow around thick sections. If the gate is too small or poorly located, it may freeze off too early, preventing effective packing. This might require a tool modification, but as an immediate process fix, try raising the mold temperature slightly to delay gate freeze. Also, confirm the material is properly dried; residual moisture can cause both surface defects and dimensional instability. Your selection advice for corrective action should follow a structured hierarchy. First, implement and document process optimization: conduct a Design of Experiments (DOE) varying holding pressure, injection speed, and mold temperature. Monitor the bore dimension and surface quality. If process adjustments alone cannot bring both characteristics into spec simultaneously, the trade-off may indicate a design limitation. The next step is a tooling review. Inspect the mold for wear in the bore core pin and check venting channels for blockage. Finally, engage with your material supplier to verify the resin&#039;s shrinkage properties and consider a grade with a lower shrinkage rate if other solutions are insufficient. The goal is to restore production with robust process windows, not just temporary fixes.",
            "upvoteCount": 10,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#acceptedAnswer",
            "datePublished": "2026-08-25T12:35:37Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "Looking at the described defects from a design perspective, the coexistence of sink marks and dimensional variation often points to inherent design challenges. The location of sink marks near the gate suggests a potential wall thickness transition or a rib/base intersection that is too thick. This creates a thermal mass that cools slower, leading to shrinkage sinks. A design review should assess if the wall thickness around the bore can be made more uniform or if cosmetic features like texture can help disguise minor sinks. For the bore dimension, if it&#039;s a core pin for a metal insert, the draft angle and pin straightness are critical. A lack of draft can cause part sticking and deformation during ejection, affecting the measured diameter. Furthermore, the gate size and location directly influence packing efficiency. A small gate may freeze early, preventing adequate compensation for shrinkage. A DFM report would recommend modifying the mold to increase gate size or relocate it to a less cosmetic area, and potentially redesigning thick sections to incorporate coring to reduce mass and promote even cooling.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#suggestedAnswer-2",
            "datePublished": "2026-08-25T12:24:19Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "To systematically address this, implement a layered quality response. First, quarantine the affected batch and segregate parts by cavity number if possible. Perform a Gage R&amp;R study on the bore measurement equipment to rule out measurement error. Classify the defects: the dimensional undersize is likely a critical defect if it affects function, while sink marks may be major. Initiate an 8D report. For root cause analysis, collect data on process parameters from the good and bad batches. Check the first-off and last-off samples from each production shift. Inspect the mold for damage or wear on the core pins causing the bore. A key checkpoint is to increase the frequency of in-process checks (IPQC) to every 30 minutes, measuring the bore diameter and visually inspecting for sinks. This data will show if the issue is drifting over time. The corrective action should include updating the control plan with tighter monitoring limits for holding pressure and mold temperature, and training operators on the new visual standards for sink marks.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#suggestedAnswer-3",
            "datePublished": "2026-08-25T12:15:23Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The material&#039;s behavior is central to both defects. The shrinkage that causes the bore to be undersized and the sink marks are directly related to the polymer&#039;s crystallization and thermal contraction. If you&#039;re using a semi-crystalline material like polypropylene or nylon, shrinkage is higher and more sensitive to processing conditions. An amorphous material like ABS might show less shrinkage but can still sink if packed poorly. First, verify the material data sheet for the nominal shrinkage rate and compare it to the actual shrinkage you&#039;re calculating from the tool dimensions. Request a certificate of analysis from your material supplier for this batch to check the melt flow index (MFI); a higher MFI than specified can lead to easier flow but worse packing. Moisture content is also critical; hygroscopic resins must be dried to below 0.02% to prevent surface defects. If process optimization hits a wall, consider switching to a material grade with a lower shrinkage factor or one that is filled with glass fibers for improved dimensional stability, though this may impact cost and surface finish.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#suggestedAnswer-4",
            "datePublished": "2026-08-25T11:56:50Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "If the metal drive square is a machined component inserted into the plastic, its consistency directly affects the assembly. However, the bore dimension issue is likely molded. Yet, from a machining standpoint, the mold itself is a precision tool. The core pins that form the bore are machined components. Their wear or initial machining tolerance could be a factor. If the pins are worn, the bore will become larger, not smaller. An undersize bore suggests the pin might have been machined oversize, or there&#039;s a plating build-up. Inspect the pins for any damage or coating wear. Also, consider the fixture used during mold machining; if it wasn&#039;t rigid, it could lead to micro-vibrations affecting the final pin diameter. For future tooling, specify a tighter tolerance on these core pins and consider using harder tool steels like H13 with proper heat treatment to resist wear. Surface finish on the pin also affects part release and shrinkage.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#suggestedAnswer-5",
            "datePublished": "2026-08-25T11:52:25Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "This situation impacts project milestones: shipment delay, potential cost of rework, and customer satisfaction. Immediate action is to communicate transparently with the customer, providing a preliminary containment plan and a timeline for root cause analysis. Internally, convene a cross-functional team (quality, manufacturing, tooling) to drive the investigation. Assess the impact on the production schedule: can you run another batch concurrently after implementing fixes, or do you need to rework the current batch? If a mold modification is required, evaluate the lead time and cost against the value of the order and the customer relationship. Update the project risk register with this issue and develop a mitigation plan, such as approving a temporary deviation for minor appearance issues if the customer agrees, while guaranteeing functional performance. The key is to manage expectations and ensure all corrective actions are documented and signed off before resuming full production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#suggestedAnswer-6",
            "datePublished": "2026-08-25T11:49:24Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "From a production line perspective, consistency is key. The sudden appearance of defects suggests a process drift or a change in operator practice. Review the standard work instructions for this job. Are the machine parameters (injection speed, holding pressure) set correctly and locked? Is the drying hopper maintained at the right temperature and time? Automate parameter monitoring if possible; use the machine&#039;s PLC to log key variables and set alarms for deviations. For cycle time efficiency, there might be pressure to reduce cooling time, which can directly cause sink marks and dimensional variation. Ensure the cooling time is fixed and adequate. Also, check the robot or manual removal process; if parts are being ejected too forcefully or handled while still hot, they can deform. Implementing a fixture for post-molding cooling can help stabilize dimensions. The goal is to make the process robust and operator-proof through clear standards and automated checks.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#suggestedAnswer-7",
            "datePublished": "2026-08-25T11:39:58Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The mold&#039;s condition is a prime suspect. For the bore dimension, inspect the core pins for wear, but also check for any bending or misalignment. A bent pin can create a tapered bore that measures undersize at one point. Use a pin gauge to check the actual pin diameter. For sink marks, examine the cooling channels around the problematic area. Inefficient cooling leads to hot spots and sinks. Flush the channels to ensure they are not blocked. Also, check the venting depth and location; inadequate venting traps air, causing flow lines and burn marks, and can hinder packing. If vents are clogged, clean them. If the mold has been in production for many cycles, consider the possibility of wear on the parting line, which can cause flash and affect packing pressure. A thorough mold maintenance, including polishing the cavity surface and checking all wear components, should be scheduled. For long-term solutions, consider adding conformal cooling or improving venting in the next mold revision.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#suggestedAnswer-8",
            "datePublished": "2026-08-25T11:23:37Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Beyond the factory floor, consider how these defects impact the tool&#039;s performance in the field. A loose metal insert due to an undersize bore could lead to the drive square spinning under torque, causing tool failure and potential injury. The sink marks, while cosmetic, might also be stress concentrators that reduce the handle&#039;s impact resistance. To validate any process fix, conduct functional tests that simulate real use. Apply the specified torque repeatedly to samples from the corrected process and monitor for insert movement or handle cracking. This performance data is crucial for customer sign-off. Also, engage with the customer&#039;s engineering team to understand their assembly process; perhaps a slight bore diameter deviation is acceptable if paired with a different insert design or adhesive. Aligning on functional requirements rather than just dimensional specs can sometimes open up practical solutions that get production moving again while ensuring end-use reliability.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/dimensional-variation-sink-marks-closure-cap-hand-tools.html#suggestedAnswer-9",
            "datePublished": "2026-08-25T11:13:50Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "General Manufacturing Q&A", "item": "https://www.jaterson.com/qa/general-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "What causes dimensional variation and sink marks in closure cap hand tools?"}
      ]
    }
]
```