description: "Sourcing custom display stands from China for industrial and retail use often creates confusion around cost breakdown, quality consistency and lead time control. This guide provides actionable evaluation criteria, practical sourcing tips and decision references to avoid common purchasing risks and align production with project requirements."
url: "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html"
language: "en"
type: "Q&A"
category: "General Manufacturing Q&A"
datePublished: "2026-09-20"
dateModified: "2026-09-20"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 10
---

# What key factors affect the cost of custom display stands manufactured in China?

## Question

 I am the purchasing director at a power tool accessories manufacturer, managing multi-category component suppliers. We are launching a new product line in Q4 2026 that requires 12,000 units of custom countertop display stands, combining ABS plastic mounting brackets and cold-rolled steel support frames. No off-the-shelf standard design fits our exact product footprint, printed brand logo placement and load-bearing requirement of 8kg per slot. Last quarter we sourced a smaller batch of similar display stands from a Zhejiang-based trading firm, and 15% of the units had warped plastic parts and misaligned mounting holes, which delayed our shipment by 12 days and caused us to miss a critical national retail launch window. Now we need to work directly with a qualified manufacturing factory for this new custom display stand project, but I am not clear what specific details I must include in the RFQ to get apples-to-apples quotes, how to distinguish real factory pricing from trading company markup, and what hard, actionable criteria I should use to filter unqualified suppliers before sharing our formal design drawings. 

## Answers
                            
### Answer 1 — Best Answer

When drafting your RFQ for custom display stands, you must include 6 non-negotiable details to eliminate mismatched quotes upfront. These are exact overall dimensions, static load test requirement per slot, material grade specification (including UV resistance if the stands will be placed near store windows), surface finish requirements for branding, allowed total tolerance for assembly, and required delivery port. Do not send generic design sketches without these parameters, as different suppliers will fill in gaps with lower cost materials that do not meet your end use needs. All quotes you receive should break down cost per unit into plastic part, metal part, assembly, packaging and tooling one-time cost, no lump sum unit pricing for the full 12,000 order.

For 2026 production in Zhejiang, the normal cost range for this exact mixed plastic and metal display stand (12k units) is between $2.1 and $2.8 per unit, with one-time tooling cost between $1200 and $1800. Any quote below $2 per unit almost always uses recycled ABS material that will warp at temperatures above 40 degrees Celsius, which is very common in unairconditioned retail backroom storage. Standard lead time for this order is 7 to 9 weeks total, including 2 weeks for sample approval, 4 weeks for mass production, and 1 to 2 weeks for final packaging and loading. Any supplier that promises lead time under 6 weeks is skipping the pre-production sample validation step, which is the main cause of the defect rate you encountered last quarter. **Reject any quote that does not list separate tooling and unit pricing, and any delivery timeline that does not reserve a minimum 10-working day window for you to test and sign off on pre-production samples.**

When filtering suppliers before sharing full drawings, use 3 simple verification steps. First, ask them to provide photos of their existing injection molding machines and metal stamping presses on their production floor, not stock photos downloaded from the internet. Second, ask for 3 recent customer references for similar mixed plastic and metal display stand orders from 2025 and 2026, and confirm the defect rate reported by those customers is below 0.8%. Third, confirm they have dedicated IPQC checkpoints after injection molding and after metal stamping, not only final full inspection after all units are assembled. **Do not pay 100% of the tooling cost upfront, a qualified factory will accept 50% deposit for tooling and 50% balance only after you approve the first physical sample.**

To avoid trading company markup, ask the supplier to list their full factory address on the formal quote, and cross check that the address matches the industrial zone areas dedicated to plastic injection and metal hardware manufacturing in Zhejiang, not commercial office buildings in downtown areas. **All valid factories will also allow you to arrange third-party factory audit or production line inspection at any time before and during mass production, without requiring 7+ days advance notice for routine checks.**

**status:** accepted
**Author:** Linda Xu
**Date:** 2026-09-20

### Answer 2

For custom display stand mixed production, the most common bottleneck is cross-process alignment between injection molding output and metal stamping output, which often causes unexpected delays when one process runs slower than the other. A mature factory will run small trial batches of 200 units first before full mass production, to identify where the yield drops: usually it is the plastic part ejection step after molding, or the metal part deburring step that causes 3-5% hidden defects that are only found at final assembly.

Lean manufacturing rules for this type of mixed component order should maintain a first pass yield target of 97% minimum, any factory that cannot commit to this target will end up running overtime to make up for scrapped parts, which either delays your order or pushes up hidden costs that get billed to you later. You can also request the supplier to share their weekly yield tracking sheet for similar display stand projects in the last 3 months, to confirm they have stable process flow that avoids unplanned downtime.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-20

### Answer 3

All the metal support frames for the custom display stand require consistent bending angles within ±0.3 degrees to ensure the full set stands level on counter tops without wobbling. The correct machining strategy uses dedicated custom stamping fixtures for the bending step, not general adjustable bending dies that produce variable angles across batches.

The surface finish of the stamped metal parts should reach 1.6 Ra before powder coating, to avoid uneven paint coverage that causes visible bumps on the finished stand surface. You can request the supplier to provide first article inspection data for the metal stamping fixture, including 20 consecutive sample measurements of the bending angle, to confirm the fixture can hold stable tolerance across 15,000 units of production, which covers your full 12,000 order plus spare replacement parts.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-20

### Answer 4

The custom display stand will be moved multiple times during shipping, retail stocking and in-store rearrangement, so the load test should not only include static 8kg weight, but also a 10-drop test from 70cm height onto a standard hardwood floor without any part cracking or detaching. Most low cost suppliers only test static load, and the stands will break easily during transit, leading to high in-store rejection rate.

Also, the assembly of the plastic bracket to the metal frame should not require extra screws or adhesive, as those add extra work at your end and increase total assembly labor cost. Snap fit design that matches the two components directly cuts your per unit assembly time by 70% and eliminates the risk of missing small screw parts during final packing.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-20

### Answer 5

A clear milestone breakdown should be written into the formal PO, with no vague timelines. The milestones should include tooling steel arrival date, first shot plastic sample date, first stamped metal sample date, pre-production full assembled sample date, mass production start date, 50% production completion date, and final shipment date.

Every milestone delay over 2 working days should trigger a formal notification with root cause and corrective action plan, no verbal updates are acceptable. All design changes requested by either side after sample approval must be documented with a written change order that adjusts cost and lead time accordingly, no unrecorded on-fly modifications are allowed, which is the number one cause for mismatched final products that do not match your approved sample.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-20

### Answer 6

For the injection mold for the ABS plastic display bracket, using P20 grade steel is the minimum acceptable standard for a 12,000 unit order, not the cheaper pre-hardened 45# steel that will show visible wear marks on the part surface after 5,000 molding cycles. The stamping die for the metal support frame should use Cr12MoV steel, which will maintain sharp, clean edge cuts without burrs for over 20,000 hits.

The factory should also provide a clear mold maintenance plan after the first 3,000 molding cycles, including cleaning of the mold cavity and checking of the ejector pins, to avoid unexpected defects that appear halfway through mass production. All tooling should have a guaranteed service life of at least 30,000 shots, so you can place repeat reorders in 2027 without paying new tooling fees.

**status:** suggested
**Author:** Rachel Huang
**Date:** 2026-09-20

### Answer 7

The main defect you encountered last quarter, warped plastic brackets, almost always comes from insufficient cooling time during the injection cycle, when the factory speeds up production to run more parts per hour to cut cost. A qualified factory will lock the injection process parameter sheet for your specific part, with cooling time no less than 28 seconds for the 3mm thick ABS bracket, and mold temperature controlled at 60 degrees Celsius, to eliminate internal stress that causes warping 2 to 3 weeks after production even if the parts look flat right after ejection.

Sink marks on the visible surface of the display stand can be avoided by adjusting the holding pressure to 60 bar, instead of using higher melt temperature that causes material degradation. No process parameter can be adjusted without prior notification and your written approval once the sample is signed off.

**status:** suggested
**Author:** Amy Li
**Date:** 2026-09-20

### Answer 8

The full inspection checkpoint sequence should cover every stage instead of only final full inspection. IQC checks incoming ABS material certification to confirm it is virgin grade with no more than 5% recycled content, and checks incoming steel sheet thickness tolerance before stamping. IPQC checks 20 units every 2 hours during injection molding to confirm no warpage or flash, and checks 20 units every 2 hours during metal stamping to confirm no burrs or misaligned bending angles.

OQC does 100% visual check for branding print clarity, and functional assembly check for 3% of the total batch to confirm no wobbling or loose fit. A formal corrective action system should be in place: if any checkpoint finds defect rate over 2%, the production line stops immediately for adjustment instead of continuing to produce bad parts.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-20

### Answer 9

Before you finalize your design drawings, the factory should provide formal DFM feedback within 3 working days, pointing out any design features that will cause unnecessary manufacturing risk. The plastic display bracket should have a minimum 1.5 degree draft angle on all vertical surfaces, to avoid scratch marks on the visible surface when the part is ejected from the mold.

Wall thickness variation across the entire plastic part should be no more than 1mm, to eliminate uneven cooling that causes warping. All sharp corners on the metal stamping part should have a minimum 0.5mm radius, to avoid stress concentration that causes the part to crack under 8kg load after 6 months of use. Any factory that starts tooling processing immediately without providing DFM feedback first is very likely to run into unexpected tooling modification issues that delay the whole project.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-20

### Answer 10

When designing the assembly interface between the plastic bracket and the metal frame, the total accumulated tolerance from all mating features should not exceed 0.2mm, otherwise you will get parts that cannot clip together by hand without extra force. A proper assembly sequence should take less than 10 seconds per unit, with no extra tools required, which cuts total assembly labor cost by a large margin.

All assembled units should pass a 5kg pull test on the plastic bracket to confirm it does not detach from the metal frame with normal pulling force. You can also request the factory to do 100 consecutive full assembly trial runs before mass production, to count how many units have fit issues, and adjust the component dimensions accordingly to get zero fit defects at full 12,000 unit production.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-20

## Related Resources

- [General Manufacturing Q&A](https://www.jaterson.com/qa/general-manufacturing/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What key factors affect the cost of custom display stands manufactured in China?",
        "text": "I am the purchasing director at a power tool accessories manufacturer, managing multi-category component suppliers. We are launching a new product line in Q4 2026 that requires 12,000 units of custom countertop display stands, combining ABS plastic mounting brackets and cold-rolled steel support frames. No off-the-shelf standard design fits our exact product footprint, printed brand logo placement and load-bearing requirement of 8kg per slot. Last quarter we sourced a smaller batch of similar display stands from a Zhejiang-based trading firm, and 15% of the units had warped plastic parts and misaligned mounting holes, which delayed our shipment by 12 days and caused us to miss a critical national retail launch window. Now we need to work directly with a qualified manufacturing factory for this new custom display stand project, but I am not clear what specific details I must include in the RFQ to get apples-to-apples quotes, how to distinguish real factory pricing from trading company markup, and what hard, actionable criteria I should use to filter unqualified suppliers before sharing our formal design drawings.",
        "answerCount": 10,
        "upvoteCount": 11,
        "datePublished": "2026-09-20T20:36:09Z",
        "dateModified": "2026-09-20T20:37:23Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "When drafting your RFQ for custom display stands, you must include 6 non-negotiable details to eliminate mismatched quotes upfront. These are exact overall dimensions, static load test requirement per slot, material grade specification (including UV resistance if the stands will be placed near store windows), surface finish requirements for branding, allowed total tolerance for assembly, and required delivery port. Do not send generic design sketches without these parameters, as different suppliers will fill in gaps with lower cost materials that do not meet your end use needs. All quotes you receive should break down cost per unit into plastic part, metal part, assembly, packaging and tooling one-time cost, no lump sum unit pricing for the full 12,000 order. For 2026 production in Zhejiang, the normal cost range for this exact mixed plastic and metal display stand (12k units) is between $2.1 and $2.8 per unit, with one-time tooling cost between $1200 and $1800. Any quote below $2 per unit almost always uses recycled ABS material that will warp at temperatures above 40 degrees Celsius, which is very common in unairconditioned retail backroom storage. Standard lead time for this order is 7 to 9 weeks total, including 2 weeks for sample approval, 4 weeks for mass production, and 1 to 2 weeks for final packaging and loading. Any supplier that promises lead time under 6 weeks is skipping the pre-production sample validation step, which is the main cause of the defect rate you encountered last quarter. Reject any quote that does not list separate tooling and unit pricing, and any delivery timeline that does not reserve a minimum 10-working day window for you to test and sign off on pre-production samples. When filtering suppliers before sharing full drawings, use 3 simple verification steps. First, ask them to provide photos of their existing injection molding machines and metal stamping presses on their production floor, not stock photos downloaded from the internet. Second, ask for 3 recent customer references for similar mixed plastic and metal display stand orders from 2025 and 2026, and confirm the defect rate reported by those customers is below 0.8%. Third, confirm they have dedicated IPQC checkpoints after injection molding and after metal stamping, not only final full inspection after all units are assembled. Do not pay 100% of the tooling cost upfront, a qualified factory will accept 50% deposit for tooling and 50% balance only after you approve the first physical sample. To avoid trading company markup, ask the supplier to list their full factory address on the formal quote, and cross check that the address matches the industrial zone areas dedicated to plastic injection and metal hardware manufacturing in Zhejiang, not commercial office buildings in downtown areas. All valid factories will also allow you to arrange third-party factory audit or production line inspection at any time before and during mass production, without requiring 7+ days advance notice for routine checks.",
            "upvoteCount": 11,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#acceptedAnswer",
            "datePublished": "2026-09-20T22:02:59Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "For custom display stand mixed production, the most common bottleneck is cross-process alignment between injection molding output and metal stamping output, which often causes unexpected delays when one process runs slower than the other. A mature factory will run small trial batches of 200 units first before full mass production, to identify where the yield drops: usually it is the plastic part ejection step after molding, or the metal part deburring step that causes 3-5% hidden defects that are only found at final assembly. Lean manufacturing rules for this type of mixed component order should maintain a first pass yield target of 97% minimum, any factory that cannot commit to this target will end up running overtime to make up for scrapped parts, which either delays your order or pushes up hidden costs that get billed to you later. You can also request the supplier to share their weekly yield tracking sheet for similar display stand projects in the last 3 months, to confirm they have stable process flow that avoids unplanned downtime.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-2",
            "datePublished": "2026-09-20T21:45:22Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "All the metal support frames for the custom display stand require consistent bending angles within ±0.3 degrees to ensure the full set stands level on counter tops without wobbling. The correct machining strategy uses dedicated custom stamping fixtures for the bending step, not general adjustable bending dies that produce variable angles across batches. The surface finish of the stamped metal parts should reach 1.6 Ra before powder coating, to avoid uneven paint coverage that causes visible bumps on the finished stand surface. You can request the supplier to provide first article inspection data for the metal stamping fixture, including 20 consecutive sample measurements of the bending angle, to confirm the fixture can hold stable tolerance across 15,000 units of production, which covers your full 12,000 order plus spare replacement parts.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-3",
            "datePublished": "2026-09-20T21:29:18Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The custom display stand will be moved multiple times during shipping, retail stocking and in-store rearrangement, so the load test should not only include static 8kg weight, but also a 10-drop test from 70cm height onto a standard hardwood floor without any part cracking or detaching. Most low cost suppliers only test static load, and the stands will break easily during transit, leading to high in-store rejection rate. Also, the assembly of the plastic bracket to the metal frame should not require extra screws or adhesive, as those add extra work at your end and increase total assembly labor cost. Snap fit design that matches the two components directly cuts your per unit assembly time by 70% and eliminates the risk of missing small screw parts during final packing.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-4",
            "datePublished": "2026-09-20T21:18:47Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "A clear milestone breakdown should be written into the formal PO, with no vague timelines. The milestones should include tooling steel arrival date, first shot plastic sample date, first stamped metal sample date, pre-production full assembled sample date, mass production start date, 50% production completion date, and final shipment date. Every milestone delay over 2 working days should trigger a formal notification with root cause and corrective action plan, no verbal updates are acceptable. All design changes requested by either side after sample approval must be documented with a written change order that adjusts cost and lead time accordingly, no unrecorded on-fly modifications are allowed, which is the number one cause for mismatched final products that do not match your approved sample.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-5",
            "datePublished": "2026-09-20T21:01:34Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For the injection mold for the ABS plastic display bracket, using P20 grade steel is the minimum acceptable standard for a 12,000 unit order, not the cheaper pre-hardened 45# steel that will show visible wear marks on the part surface after 5,000 molding cycles. The stamping die for the metal support frame should use Cr12MoV steel, which will maintain sharp, clean edge cuts without burrs for over 20,000 hits. The factory should also provide a clear mold maintenance plan after the first 3,000 molding cycles, including cleaning of the mold cavity and checking of the ejector pins, to avoid unexpected defects that appear halfway through mass production. All tooling should have a guaranteed service life of at least 30,000 shots, so you can place repeat reorders in 2027 without paying new tooling fees.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-6",
            "datePublished": "2026-09-20T20:59:40Z",
            "author": {"@type": "Person","name": "Rachel Huang","url": "https://www.jaterson.com/team/rachel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The main defect you encountered last quarter, warped plastic brackets, almost always comes from insufficient cooling time during the injection cycle, when the factory speeds up production to run more parts per hour to cut cost. A qualified factory will lock the injection process parameter sheet for your specific part, with cooling time no less than 28 seconds for the 3mm thick ABS bracket, and mold temperature controlled at 60 degrees Celsius, to eliminate internal stress that causes warping 2 to 3 weeks after production even if the parts look flat right after ejection. Sink marks on the visible surface of the display stand can be avoided by adjusting the holding pressure to 60 bar, instead of using higher melt temperature that causes material degradation. No process parameter can be adjusted without prior notification and your written approval once the sample is signed off.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-7",
            "datePublished": "2026-09-20T20:51:41Z",
            "author": {"@type": "Person","name": "Amy Li","url": "https://www.jaterson.com/team/amy.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The full inspection checkpoint sequence should cover every stage instead of only final full inspection. IQC checks incoming ABS material certification to confirm it is virgin grade with no more than 5% recycled content, and checks incoming steel sheet thickness tolerance before stamping. IPQC checks 20 units every 2 hours during injection molding to confirm no warpage or flash, and checks 20 units every 2 hours during metal stamping to confirm no burrs or misaligned bending angles. OQC does 100% visual check for branding print clarity, and functional assembly check for 3% of the total batch to confirm no wobbling or loose fit. A formal corrective action system should be in place: if any checkpoint finds defect rate over 2%, the production line stops immediately for adjustment instead of continuing to produce bad parts.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-8",
            "datePublished": "2026-09-20T20:40:59Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Before you finalize your design drawings, the factory should provide formal DFM feedback within 3 working days, pointing out any design features that will cause unnecessary manufacturing risk. The plastic display bracket should have a minimum 1.5 degree draft angle on all vertical surfaces, to avoid scratch marks on the visible surface when the part is ejected from the mold. Wall thickness variation across the entire plastic part should be no more than 1mm, to eliminate uneven cooling that causes warping. All sharp corners on the metal stamping part should have a minimum 0.5mm radius, to avoid stress concentration that causes the part to crack under 8kg load after 6 months of use. Any factory that starts tooling processing immediately without providing DFM feedback first is very likely to run into unexpected tooling modification issues that delay the whole project.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-9",
            "datePublished": "2026-09-20T20:38:17Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When designing the assembly interface between the plastic bracket and the metal frame, the total accumulated tolerance from all mating features should not exceed 0.2mm, otherwise you will get parts that cannot clip together by hand without extra force. A proper assembly sequence should take less than 10 seconds per unit, with no extra tools required, which cuts total assembly labor cost by a large margin. All assembled units should pass a 5kg pull test on the plastic bracket to confirm it does not detach from the metal frame with normal pulling force. You can also request the factory to do 100 consecutive full assembly trial runs before mass production, to count how many units have fit issues, and adjust the component dimensions accordingly to get zero fit defects at full 12,000 unit production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/custom-display-stand-cost-factors-china.html#suggestedAnswer-10",
            "datePublished": "2026-09-20T20:37:23Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "General Manufacturing Q&A", "item": "https://www.jaterson.com/qa/general-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "What key factors affect the cost of custom display stands manufactured in China?"}
      ]
    }
]
```