---
title: "What aluminum grades are best for ODM custom hand tool components?"
description: "Struggling to balance lightweight performance, durability, and cost for new hand tool aluminum ODM projects? Get clear material selection criteria, processing tradeoffs, and actionable decision rules to cut quality risks and optimize total production cost for 2026 mass production."
url: "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html"
language: "en"
type: "Q&A"
category: "Custom Manufacturing Q&A"
datePublished: "2026-09-26"
dateModified: "2026-09-26"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# What aluminum grades are best for ODM custom hand tool components?

## Question

 I am a procurement engineer at a mid-sized hardware brand, currently leading a 2026 new product line of cordless power tool auxiliary handles, and I’m stuck on finalizing our aluminum ODM specification after 3 rounds of sample reworks with our previous supplier. The last batch of 6061 aluminum prototype handles had unexpected surface anodizing discoloration, and the tensile test results were 12% below our required threshold for drop impact resistance when users apply 35ft-lbs of torque. We have a hard launch deadline in 14 weeks for the national hardware trade show, and we are trying to decide if switching to 6063 or 7075 aluminum will fix the performance issues without pushing our unit cost 30% over budget. I need a clear, actionable framework to evaluate if our aluminum ODM partner is setting the right material, processing, and quality benchmarks that match our end-user use case, rather than just picking the cheapest readily available aluminum stock. I also need to avoid repeating the earlier mistake of signing off on a sample that passed lab static testing but failed real field performance checks. 

## Answers
                            
### Answer 1 — Best Answer

First, the root cause of your previous sample failure is almost certainly mismatched aluminum grade selection paired with unoptimized post-processing parameters, not a generic material defect. Most hand tool ODM suppliers default to 6061 aluminum for general components without verifying that the stock they source meets the full AMS-QQ-A-250/11 specification, rather than recycled secondary aluminum stock that has higher impurity content leading to inconsistent anodizing results and lower impact strength.

For your power tool auxiliary handle use case, start with this tiered evaluation framework to eliminate guesswork. 6063 aluminum is not a viable replacement here: its tensile strength is 30% lower than 6061, so it will not meet your 35ft-lbs torque requirement even with heat treatment, and will only lead to more reworks. 7075 aluminum meets all your mechanical performance requirements, but if you use the standard T6 temper, unit cost will jump 28% to 32% which aligns with your earlier cost projection. **The balanced middle option that 92% of similar hand tool ODM projects adopted in 2025-2026 is 6061-T6 aluminum sourced from virgin certified ingot stock, with a controlled 1% silicon content upper limit.** This grade delivers 18% higher tensile strength than generic 6061, eliminates the discoloration issue during type 2 anodizing, and only adds 7% to your current unit cost, well under your 30% over budget threshold.

Next, lock in 3 non-negotiable checkpoints for your ODM partner to confirm before you move to mass production. First, require them to provide a material mill test report (MTR) for every incoming aluminum coil or bar lot, and conduct a third-party impurity spot check for every 5 production batches. Second, adjust the CNC machining feed rate to 0.15mm per revolution instead of the standard 0.25mm rate used for general aluminum parts, to avoid micro-cracks on the handle contact surface that cause hidden failure under repeated torque load. **Third, replace your old static lab tensile test with a 1000-cycle dynamic torque test that applies 110% of your rated load for 2 seconds per cycle, which catches 98% of the field failure modes that standard static testing misses.**

For cost tradeoff management, you can offset the small 7% material cost increase by optimizing the ODM processing flow: remove 2 unnecessary secondary deburring steps that are typically applied for consumer electronics aluminum parts but not required for hand tool handles, which cuts processing cost by 6% to keep your total unit cost almost unchanged. **Add a 1% material performance clause in your ODM contract that requires the supplier to cover all rework costs if any batch fails the dynamic torque test, to transfer the quality risk properly.** This full framework will get you from sample approval to mass production in 8 weeks, leaving 6 weeks of buffer for pre-show inventory preparation to meet your launch deadline.

**status:** accepted
**Author:** Jason Zhou
**Date:** 2026-09-26

### Answer 2

Map your full project timeline into 4 non-negotiable milestones to stay on track for the 14-week launch window. The first milestone locks material specification and process parameter sign-off within 7 days, no later adjustments allowed for core material or machining settings, to avoid unplanned delays.

The second milestone completes 20 pre-production sample runs, with 100% of samples passing the full performance test suite, within 3 weeks. The third milestone runs a 500-piece pilot production batch to validate process consistency across full production shifts, before any mass production tooling is fully committed.

The fourth milestone locks final packaging and shipping configuration 2 weeks ahead of the trade show date, to eliminate last minute adjustments that delay delivery. Any requested change to material grade, processing steps, or test criteria after the first milestone will trigger a formal change request that updates both cost and delivery timeline, to prevent unplanned scope creep from pushing your launch date back.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-26

### Answer 3

Target a final mass production yield rate above 97% for this aluminum handle ODM project, which is achievable with targeted adjustments to the standard processing flow. The biggest bottleneck for this type of aluminum hand tool part is the anodizing stage, where inconsistent rack contact points cause 60% of all finished part rejection. Switch to dedicated titanium racks with sharpened contact prongs that pierce the aluminum part’s surface oxide layer during anodizing, to eliminate uneven current distribution that causes discoloration.

Add a 2-minute compressed air blowoff step right after CNC machining to remove all fine aluminum chips trapped in the part’s inner grooves, which prevents embedded debris from showing up as surface defects after anodizing. Implement a layered check at each processing station, where operators flag non-conforming parts immediately instead of passing them downstream, to cut total rework time by 40% and reduce overall production waste.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-26

### Answer 4

Review your current handle part drawing to identify hidden toolability risks that will cause unplanned delays and cost overruns during ODM production. First, confirm that all wall thickness variations on the part are no more than 1.8mm across different sections, to avoid uneven cooling after CNC machining that introduces internal residual stress leading to unexpected breakage under high torque load.

Second, adjust all external surface draft angles to 1.5 degrees minimum, instead of the 0.8 degrees specified in your current draft, to ensure the part can be ejected cleanly from the machining fixture without scratching the visible outer surface that will be anodized. Third, remove any 90-degree sharp inner corners on the part’s inner cavity, and replace them with a minimum 0.5mm radius, to eliminate stress concentration points that are the most common cause of drop impact failure even when material grade meets all specified requirements.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-26

### Answer 5

Optimize your custom fixture and tooling setup for this aluminum hand tool ODM project to get consistent performance across 100k+ production units. Select a side gate entry point on the non-visible bottom edge of the handle, instead of a top gate on the user-facing outer surface, to eliminate gate vestige that requires extra manual polishing work and creates uneven surface texture that impacts anodizing uniformity.

Use a 2-cavity machining fixture layout instead of 4-cavity for the initial production run, to ensure even clamping pressure on every part during CNC operations, which prevents 12% of parts from having minor misalignment that leads to tolerance stack up issues during final assembly. All tooling steel should be pre-heat treated to HRC 48 before first use, to avoid tooling wear that causes dimensional drift after 5000 units of production, so you do not need to stop production for tool rework in the middle of your mass run.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-26

### Answer 6

Set clear achievable tolerance and machining strategy parameters for your ODM supplier to follow, to avoid over-tolerancing that adds unnecessary cost or under-tolerancing that causes assembly issues. All critical torque load bearing surfaces can hold a tolerance of +/- 0.02mm, which is standard for aluminum 6061 T6 CNC machining and does not require extra high-precision equipment investment.

Non-cosmetic non-load bearing inner surfaces can be set to a +/- 0.1mm tolerance, which cuts total machining cycle time by 22% per part. Use a high-feed solid carbide end mill with a 30-degree helix angle for all roughing cuts, to reduce machining vibration that creates micro surface cracks on the part. For surface finish, target a 1.6 Ra value for all outer cosmetic surfaces, which delivers a smooth enough base for uniform anodizing, and does not require extra polishing steps that add labor cost.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-26

### Answer 7

Align all part performance benchmarks directly to real end-user hand tool use cases, instead of generic industrial material standards that do not reflect actual working conditions. Conduct field simulation testing where the handle is mounted to a standard power tool, and used by 12 different test operators across 3 full 8-hour work shifts to apply torque under real working conditions, which catches edge case failure modes that lab testing cannot replicate.

Confirm that the anodized surface can resist 500+ cycles of contact with common industrial grease, cleaning solvents, and construction site dust, without chipping or discoloring, to meet your 3-year product warranty requirement. Verify that the final assembled handle has no sharp edges or burrs that can cut user’s hands even after 1000 repeated grip and torque cycles, to avoid product safety complaints after launch.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-26

### Answer 8

Map out the full assembly sequence for your aluminum handle to identify tolerance stack up risks that cause consistent fit issues at volume production. When you pair the aluminum handle with the existing power tool main body connection interface, confirm that the total combined tolerance across all mating components does not exceed 0.08mm, to eliminate wobble when users apply high torque.

Design the assembly sequence so the aluminum handle is the first component placed in the assembly jig, with all other mating parts aligned to its reference datum, instead of aligning the handle to other plastic components that have larger tolerance variation. Test 50 different randomly selected production parts across 3 separate production batches in full assembly, to make sure no parts get stuck during assembly and no parts have excessive play after installation, to keep your assembly line yield above 99% at full volume.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-26

### Answer 9

Run a full total cost of ownership calculation for all 3 candidate aluminum grades, instead of only comparing raw material per unit cost. The generic non-certified 6061 grade has the lowest upfront material cost, but its typical 8% production rejection rate, plus higher field failure rate, adds 17% to your total end to end product cost. The 7075 grade has the highest performance, but its 3x longer machining cycle time and higher raw material cost pushes total unit cost 28% higher, which will put your product at a significant price disadvantage against competing mid-range hand tool lines.

The certified virgin 6061 T6 grade with controlled silicon content delivers the best overall cost performance, with less than 2% production rejection rate, zero unplanned rework cost, and meets all required performance benchmarks. You can also negotiate a 4-6% bulk material discount with your ODM supplier for annual order volumes above 50,000 units, to further reduce long term material cost.

**status:** suggested
**Author:** Sophia Wang
**Date:** 2026-09-26

## Related Resources

- [Custom Manufacturing Q&A](https://www.jaterson.com/qa/oem-odm/)
- [Products](https://www.jaterson.com/products/)
- [Capabilities](https://www.jaterson.com/capabilities/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Guides](https://www.jaterson.com/manufacturing/)
- [Buying Guides](https://www.jaterson.com/buying/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What aluminum grades are best for ODM custom hand tool components?",
        "text": "I am a procurement engineer at a mid-sized hardware brand, currently leading a 2026 new product line of cordless power tool auxiliary handles, and I’m stuck on finalizing our aluminum ODM specification after 3 rounds of sample reworks with our previous supplier. The last batch of 6061 aluminum prototype handles had unexpected surface anodizing discoloration, and the tensile test results were 12% below our required threshold for drop impact resistance when users apply 35ft-lbs of torque. We have a hard launch deadline in 14 weeks for the national hardware trade show, and we are trying to decide if switching to 6063 or 7075 aluminum will fix the performance issues without pushing our unit cost 30% over budget. I need a clear, actionable framework to evaluate if our aluminum ODM partner is setting the right material, processing, and quality benchmarks that match our end-user use case, rather than just picking the cheapest readily available aluminum stock. I also need to avoid repeating the earlier mistake of signing off on a sample that passed lab static testing but failed real field performance checks.",
        "answerCount": 9,
        "upvoteCount": 11,
        "datePublished": "2026-09-26T01:43:20Z",
        "dateModified": "2026-09-26T01:43:40Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "First, the root cause of your previous sample failure is almost certainly mismatched aluminum grade selection paired with unoptimized post-processing parameters, not a generic material defect. Most hand tool ODM suppliers default to 6061 aluminum for general components without verifying that the stock they source meets the full AMS-QQ-A-250/11 specification, rather than recycled secondary aluminum stock that has higher impurity content leading to inconsistent anodizing results and lower impact strength. For your power tool auxiliary handle use case, start with this tiered evaluation framework to eliminate guesswork. 6063 aluminum is not a viable replacement here: its tensile strength is 30% lower than 6061, so it will not meet your 35ft-lbs torque requirement even with heat treatment, and will only lead to more reworks. 7075 aluminum meets all your mechanical performance requirements, but if you use the standard T6 temper, unit cost will jump 28% to 32% which aligns with your earlier cost projection. The balanced middle option that 92% of similar hand tool ODM projects adopted in 2025-2026 is 6061-T6 aluminum sourced from virgin certified ingot stock, with a controlled 1% silicon content upper limit. This grade delivers 18% higher tensile strength than generic 6061, eliminates the discoloration issue during type 2 anodizing, and only adds 7% to your current unit cost, well under your 30% over budget threshold. Next, lock in 3 non-negotiable checkpoints for your ODM partner to confirm before you move to mass production. First, require them to provide a material mill test report (MTR) for every incoming aluminum coil or bar lot, and conduct a third-party impurity spot check for every 5 production batches. Second, adjust the CNC machining feed rate to 0.15mm per revolution instead of the standard 0.25mm rate used for general aluminum parts, to avoid micro-cracks on the handle contact surface that cause hidden failure under repeated torque load. Third, replace your old static lab tensile test with a 1000-cycle dynamic torque test that applies 110% of your rated load for 2 seconds per cycle, which catches 98% of the field failure modes that standard static testing misses. For cost tradeoff management, you can offset the small 7% material cost increase by optimizing the ODM processing flow: remove 2 unnecessary secondary deburring steps that are typically applied for consumer electronics aluminum parts but not required for hand tool handles, which cuts processing cost by 6% to keep your total unit cost almost unchanged. Add a 1% material performance clause in your ODM contract that requires the supplier to cover all rework costs if any batch fails the dynamic torque test, to transfer the quality risk properly. This full framework will get you from sample approval to mass production in 8 weeks, leaving 6 weeks of buffer for pre-show inventory preparation to meet your launch deadline.",
            "upvoteCount": 11,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#acceptedAnswer",
            "datePublished": "2026-09-26T02:31:27Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "Map your full project timeline into 4 non-negotiable milestones to stay on track for the 14-week launch window. The first milestone locks material specification and process parameter sign-off within 7 days, no later adjustments allowed for core material or machining settings, to avoid unplanned delays. The second milestone completes 20 pre-production sample runs, with 100% of samples passing the full performance test suite, within 3 weeks. The third milestone runs a 500-piece pilot production batch to validate process consistency across full production shifts, before any mass production tooling is fully committed. The fourth milestone locks final packaging and shipping configuration 2 weeks ahead of the trade show date, to eliminate last minute adjustments that delay delivery. Any requested change to material grade, processing steps, or test criteria after the first milestone will trigger a formal change request that updates both cost and delivery timeline, to prevent unplanned scope creep from pushing your launch date back.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#suggestedAnswer-2",
            "datePublished": "2026-09-26T02:21:37Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Target a final mass production yield rate above 97% for this aluminum handle ODM project, which is achievable with targeted adjustments to the standard processing flow. The biggest bottleneck for this type of aluminum hand tool part is the anodizing stage, where inconsistent rack contact points cause 60% of all finished part rejection. Switch to dedicated titanium racks with sharpened contact prongs that pierce the aluminum part’s surface oxide layer during anodizing, to eliminate uneven current distribution that causes discoloration. Add a 2-minute compressed air blowoff step right after CNC machining to remove all fine aluminum chips trapped in the part’s inner grooves, which prevents embedded debris from showing up as surface defects after anodizing. Implement a layered check at each processing station, where operators flag non-conforming parts immediately instead of passing them downstream, to cut total rework time by 40% and reduce overall production waste.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#suggestedAnswer-3",
            "datePublished": "2026-09-26T02:19:47Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Review your current handle part drawing to identify hidden toolability risks that will cause unplanned delays and cost overruns during ODM production. First, confirm that all wall thickness variations on the part are no more than 1.8mm across different sections, to avoid uneven cooling after CNC machining that introduces internal residual stress leading to unexpected breakage under high torque load. Second, adjust all external surface draft angles to 1.5 degrees minimum, instead of the 0.8 degrees specified in your current draft, to ensure the part can be ejected cleanly from the machining fixture without scratching the visible outer surface that will be anodized. Third, remove any 90-degree sharp inner corners on the part’s inner cavity, and replace them with a minimum 0.5mm radius, to eliminate stress concentration points that are the most common cause of drop impact failure even when material grade meets all specified requirements.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#suggestedAnswer-4",
            "datePublished": "2026-09-26T02:15:23Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Optimize your custom fixture and tooling setup for this aluminum hand tool ODM project to get consistent performance across 100k+ production units. Select a side gate entry point on the non-visible bottom edge of the handle, instead of a top gate on the user-facing outer surface, to eliminate gate vestige that requires extra manual polishing work and creates uneven surface texture that impacts anodizing uniformity. Use a 2-cavity machining fixture layout instead of 4-cavity for the initial production run, to ensure even clamping pressure on every part during CNC operations, which prevents 12% of parts from having minor misalignment that leads to tolerance stack up issues during final assembly. All tooling steel should be pre-heat treated to HRC 48 before first use, to avoid tooling wear that causes dimensional drift after 5000 units of production, so you do not need to stop production for tool rework in the middle of your mass run.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#suggestedAnswer-5",
            "datePublished": "2026-09-26T02:08:12Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Set clear achievable tolerance and machining strategy parameters for your ODM supplier to follow, to avoid over-tolerancing that adds unnecessary cost or under-tolerancing that causes assembly issues. All critical torque load bearing surfaces can hold a tolerance of +/- 0.02mm, which is standard for aluminum 6061 T6 CNC machining and does not require extra high-precision equipment investment. Non-cosmetic non-load bearing inner surfaces can be set to a +/- 0.1mm tolerance, which cuts total machining cycle time by 22% per part. Use a high-feed solid carbide end mill with a 30-degree helix angle for all roughing cuts, to reduce machining vibration that creates micro surface cracks on the part. For surface finish, target a 1.6 Ra value for all outer cosmetic surfaces, which delivers a smooth enough base for uniform anodizing, and does not require extra polishing steps that add labor cost.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#suggestedAnswer-6",
            "datePublished": "2026-09-26T01:58:31Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Align all part performance benchmarks directly to real end-user hand tool use cases, instead of generic industrial material standards that do not reflect actual working conditions. Conduct field simulation testing where the handle is mounted to a standard power tool, and used by 12 different test operators across 3 full 8-hour work shifts to apply torque under real working conditions, which catches edge case failure modes that lab testing cannot replicate. Confirm that the anodized surface can resist 500+ cycles of contact with common industrial grease, cleaning solvents, and construction site dust, without chipping or discoloring, to meet your 3-year product warranty requirement. Verify that the final assembled handle has no sharp edges or burrs that can cut user’s hands even after 1000 repeated grip and torque cycles, to avoid product safety complaints after launch.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#suggestedAnswer-7",
            "datePublished": "2026-09-26T01:47:30Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Map out the full assembly sequence for your aluminum handle to identify tolerance stack up risks that cause consistent fit issues at volume production. When you pair the aluminum handle with the existing power tool main body connection interface, confirm that the total combined tolerance across all mating components does not exceed 0.08mm, to eliminate wobble when users apply high torque. Design the assembly sequence so the aluminum handle is the first component placed in the assembly jig, with all other mating parts aligned to its reference datum, instead of aligning the handle to other plastic components that have larger tolerance variation. Test 50 different randomly selected production parts across 3 separate production batches in full assembly, to make sure no parts get stuck during assembly and no parts have excessive play after installation, to keep your assembly line yield above 99% at full volume.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#suggestedAnswer-8",
            "datePublished": "2026-09-26T01:44:16Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Run a full total cost of ownership calculation for all 3 candidate aluminum grades, instead of only comparing raw material per unit cost. The generic non-certified 6061 grade has the lowest upfront material cost, but its typical 8% production rejection rate, plus higher field failure rate, adds 17% to your total end to end product cost. The 7075 grade has the highest performance, but its 3x longer machining cycle time and higher raw material cost pushes total unit cost 28% higher, which will put your product at a significant price disadvantage against competing mid-range hand tool lines. The certified virgin 6061 T6 grade with controlled silicon content delivers the best overall cost performance, with less than 2% production rejection rate, zero unplanned rework cost, and meets all required performance benchmarks. You can also negotiate a 4-6% bulk material discount with your ODM supplier for annual order volumes above 50,000 units, to further reduce long term material cost.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-aluminum-grades-for-odm-custom-hand-tool-components.html#suggestedAnswer-9",
            "datePublished": "2026-09-26T01:43:40Z",
            "author": {"@type": "Person","name": "Sophia Wang","url": "https://www.jaterson.com/team/sophia.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.jaterson.com/qa/oem-odm/"}          ,{"@type": "ListItem", "position": 4, "name": "What aluminum grades are best for ODM custom hand tool components?"}
      ]
    }
]
```