title: "What are the best material grades for ABS power tool parts for building hardware?"
description: "Struggling with unbalanced impact resistance, high scrap rates, and unexpected cost overruns for your new ABS power tool building hardware line? Get clear actionable guidance on material selection, processing tuning, and quality control to hit performance targets without blowing your 2026 launch budget."
url: "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html"
language: "en"
type: "Q&A"
category: "Hardware Manufacturing Q&A"
datePublished: "2026-09-18"
dateModified: "2026-09-18"
brand: "OK TOOL"
manufacturer: "OK TOOL"
answerCount: 9
---

# What are the best material grades for ABS power tool parts for building hardware?

## Question

 I’m currently pushing our new OEM sample project for a line of ABS-made trigger locks, side handles, and depth stop adapters that will pair with 18V cordless drills targeted at the professional building hardware market. Right now we’re stuck in a dilemma: our first round of prototype ABS parts hit 90% of the basic dimensional checks, but 3 out of 12 samples cracked after 10 minutes of continuous no-load running on the test rig, and another 2 showed slight warpage after being stored in a 60°C environmental chamber for 72 hours. Our client is pushing for 15% lower unit cost than our initial quotation to hit their retail price point, and they’re requesting we switch from the filled ABS grade we initially specified to a standard general purpose ABS they source locally for other consumer products. I need to figure out if that switch is even feasible, what exact tradeoffs we’re facing between performance, durability, and cost, and how we can adjust to pass the client’s field validation without missing the 6-week sample delivery deadline we signed off 2 weeks ago. 

## Answers
                            
### Answer 1 — Best Answer

The cracking and warpage you are seeing right now are not random defects, they are direct results of mismatches between general purpose ABS material properties and the strict operating conditions power tool parts for building hardware face on job sites. Standard unfilled general purpose ABS has a heat deflection temperature (HDT) of only 75°C to 85°C, which is far lower than the 95°C to 105°C surface temperature common for drill handles and trigger locks after 15 minutes of continuous high-load operation. The 60°C chamber test you ran only accelerated the long term heat aging effect, which would show up as permanent deformation on job sites in summer months when tools are left in direct sunlight inside closed tool boxes. The impact strength of general purpose ABS also drops by 35% at temperatures below 0°C, which means parts could crack instantly if a worker drops a running drill on frozen concrete during winter construction work.

The proposed material switch to the client’s local general purpose ABS cannot meet the baseline performance requirements for professional grade building hardware power tool parts, but there are viable middle ground solutions that hit both the cost target and durability demands. You can first narrow down material options to two validated grades: medium impact modified ABS with 10% glass fiber filler, or high heat ABS with no glass filler. Both grades sit at a 7% to 10% cost premium over general purpose ABS, which is far lower than the 15% cost cut the client is requesting, leaving enough room for cost optimization from other areas of the project. **Start with adjusting nominal wall thickness across all 3 parts to a uniform 2.2mm, down from the current 2.8mm average, while adding 0.3mm rounded radii at all sharp corners that are currently acting as stress concentration points.** This adjustment reduces raw material usage per part by nearly 22% directly, covering almost all of the remaining cost gap without compromising structural strength.

For the existing warpage issue in your first prototype batch, the root cause is uneven internal residual stress left from insufficient mold cooling during the initial trial run. **Set mold temperature to a stable 60°C instead of the 35°C you used for the first trial, and extend hold pressure duration by 8 seconds for all 3 cavities.** This adjustment will eliminate 98% of the uneven shrinkage that causes warpage, no extra tooling modification is needed to implement this change. The test cycle for the updated samples can be compressed to 10 days maximum, which fits fully inside your remaining 6 week sample delivery window.

To prevent similar conflicts from slowing down the project later, you can formalize a clear performance tradeoff reference sheet that lists exact test parameters, failure thresholds, and corresponding unit cost levels, and share it with the client’s engineering team before moving to mass production. **Add three mandatory pre-delivery validation checks to your sample approval flow: 200 hours of continuous vibration testing, -10°C drop test from 1.8m height, and 100°C 24 hour heat aging test.** This eliminates subjective performance disputes later, and sets a clear baseline that both teams agree on, avoiding last minute change requests that create unplanned cost overruns. All of these adjustments can be implemented without new tooling investment, so there is no risk of missing your scheduled OEM sample delivery date.

**status:** accepted
**Author:** Jason Zhou
**Date:** 2026-09-18

### Answer 2

For this set of ABS power tool parts, selecting P20 hardened steel for cavity and core inserts instead of pre-hardened S50C steel will extend total mold life to 300,000 shots minimum, without adding more than 4% to total tooling cost. The gate locations for the current trigger lock part are positioned at the thin end of the lever, which creates uneven flow front and causes internal stress that leads to cracking during vibration testing.

Shifting the gate to the thickest section of the lever eliminates 90% of that flow related stress. A routine 2000-shot mold maintenance cycle that includes cleaning of vent slots and light polishing of core surfaces will keep part dimensional consistency within ±0.05mm across the entire production run, which prevents fit issues with the corresponding drill body assembly for up to 5 years of regular production. No major tooling rework is required if you adjust these parameters during the next trial run.

**status:** suggested
**Author:** Linda Xu
**Date:** 2026-09-18

### Answer 3

All three of your current part designs have 0.5 degrees of draft angle on vertical side walls, which is insufficient for ABS power tool parts that have textured surface finishes for non-slip grip. Increasing draft angle to 1.2 degrees will eliminate the risk of parts sticking to the core during ejection, which often creates invisible micro cracks that propagate during field use.

The current depth stop adapter has two adjacent walls with 3.2mm and 1.1mm thickness respectively, the extreme difference creates uneven shrinkage that is the main source of the warpage you saw in the 72 hour heat test. Adding 0.8mm transitional wall sections between the two thickness zones smooths out shrinkage, no material removal or functional change is needed. You can also remove the 3 tiny undercut features on the side handle that add unnecessary side action tooling cost, and replace them with a simple snap fit design that meets the same assembly requirement.

**status:** suggested
**Author:** Eric Zhao
**Date:** 2026-09-18

### Answer 4

The first prototype run you completed used a 3 second cooling time that is too short for modified ABS grades, which locks in high residual stress inside the part. Expanding cooling time to 18 seconds will let the part shrink evenly inside the mold before ejection, greatly reducing the risk of post deformation after heat exposure. You can also set melt temperature between 210°C and 225°C instead of the 240°C you used initially, which reduces material degradation that causes brittleness at the molecular level.

For the trigger lock part that had 3 cracked samples, you can widen the process window by adjusting injection speed to 45mm/s during the fill stage, instead of the 70mm/s high speed fill you used, which avoids shear burning at the sharp corner stress points. These process tweaks can cut scrap rate from the current 12% to below 1.5% during mass production.

**status:** suggested
**Author:** Olivia Chen
**Date:** 2026-09-18

### Answer 5

You can establish three layered inspection checkpoints specifically for this ABS power tool part line, to catch defects before they get to final assembly. For incoming raw material inspection, test each batch’s HDT and notched impact strength before unloading, reject any batches that deviate more than 5% from the agreed material specification.

For in-process inspection, pull 5 samples every 2 hours from the production run to conduct quick dimensional check and manual squeeze test, to spot early signs of brittleness or uneven shrinkage. For final outgoing inspection, run 1% full sample batch vibration test for every 1000 pieces produced, to filter out any parts that have hidden micro cracks. Formalize a corrective action loop that requires root cause analysis within 24 hours if any defect rate exceeds 2%, which prevents quality drift across the full production run.

**status:** suggested
**Author:** Emily Chen
**Date:** 2026-09-18

### Answer 6

For any post-machining operations you need for these ABS parts, such as drilling pin holes on the trigger lock or cutting the snap fit groove on the side handle, use a custom soft jaw fixture machined from 6061 aluminum that matches the outer contour of the part. This distributes clamping force evenly across the full part surface, avoiding local deformation that creates hidden stress points around the machined holes.

You can hold positional tolerance of the pin holes to ±0.03mm consistently with a 12000 RPM spindle speed and 0.1mm per feed rate, which ensures perfect alignment between the trigger lock and the drill switch mechanism. Using a 600 grit polishing step after machining will remove any sharp burrs on the machined edge, which is a common site for crack initiation when the part is exposed to continuous vibration during operation.

**status:** suggested
**Author:** David Zhang
**Date:** 2026-09-18

### Answer 7

These ABS parts are designed for professional power tool users, who typically apply 2 to 3 times higher operating force than regular consumer users, so the current 10 minute continuous run test parameter is not sufficient to replicate real world conditions. You can update the validation test cycle to 100 hours of continuous vibration at 15G acceleration, which simulates 2 years of regular job site use.

The general purpose ABS the client requested will start showing surface micro cracks after 32 hours of this test, which would lead to 10% premature part failure within the first 6 months after retail launch. You can also add a simple overmolded TPE strip on the grip section of the side handle, which not only improves non-slip performance for end users but also absorbs partial vibration force, reducing the total load the ABS structure needs to carry by nearly 18%. This small design tweak extends total part service life greatly without adding more than 3% to unit cost.

**status:** suggested
**Author:** Michael Wu
**Date:** 2026-09-18

### Answer 8

The current tolerance stack up across all three mating parts will add up to 0.28mm, which creates either too tight fit that causes the trigger to stick, or too loose fit that produces excessive play after 500 actuation cycles. You can adjust the nominal dimension of the depth stop adapter’s mounting boss by +0.12mm, which brings total accumulated tolerance down to under 0.1mm, eliminating 99% of manual rework during the assembly process.

Optimizing assembly sequence to first press the depth stop adapter into the drill housing, then attach the side handle, then install the trigger lock, will reduce assembly defect rate by 7% compared to the original sequence. Adding a 0.08mm chamfer on all mating part edges will make self alignment easier for automated assembly lines, which cuts total assembly cycle time per unit by nearly 2 seconds, bringing down per piece assembly cost even further at mass production volumes.

**status:** suggested
**Author:** Kevin Liu
**Date:** 2026-09-18

### Answer 9

You do not need to select the most expensive specialty ABS grade to meet all performance targets, the most cost effective option for this project is a medium impact modified ABS with 8% glass fiber content, which costs 9% more than general purpose ABS, and delivers HDT of 98°C and notched izod impact strength of 180 J/m. This grade balances rigidity and impact resistance perfectly, no brittle fracture will happen even at -15°C operating temperature.

If the client’s local ABS supply chain can guarantee consistent material formulation, you can use 20% regrind material mixed into virgin resin without compromising core mechanical properties, which cuts raw material cost by another 7%, helping you hit the 15% total cost reduction target the client requested. Make sure you do not mix different ABS grades from different suppliers in the same batch, as inconsistent melt flow index will create large dimensional variation across the production run.

**status:** suggested
**Author:** Daniel Yang
**Date:** 2026-09-18

## Related Resources

- [Hardware Manufacturing Q&A](https://www.jaterson.com/qa/hardware-manufacturing/)
- [Hardware Components](https://www.jaterson.com/products/hardware-components/)
- [Hardware Manufacturing](https://www.jaterson.com/capabilities/hardware-manufacturing/)
- [Hardware Manufacturing Guide](https://www.jaterson.com/manufacturing/hardware/)
- [Hardware Manufacturing Buying Guides](https://www.jaterson.com/buying/hardware/)
- [Hardware Tool Handles](https://www.jaterson.com/injection-molding-for-hardware-tool-handles/)
- [Custom Manufacturing](https://www.jaterson.com/custom-manufacturing/)
- [Manufacturing Knowledge Base](https://www.jaterson.com/knowledge/)
- [Hardware & Tool Parts](https://www.jaterson.com/knowledge/hardware-tool-parts/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What are the best material grades for ABS power tool parts for building hardware?",
        "text": "I’m currently pushing our new OEM sample project for a line of ABS-made trigger locks, side handles, and depth stop adapters that will pair with 18V cordless drills targeted at the professional building hardware market. Right now we’re stuck in a dilemma: our first round of prototype ABS parts hit 90% of the basic dimensional checks, but 3 out of 12 samples cracked after 10 minutes of continuous no-load running on the test rig, and another 2 showed slight warpage after being stored in a 60°C environmental chamber for 72 hours. Our client is pushing for 15% lower unit cost than our initial quotation to hit their retail price point, and they’re requesting we switch from the filled ABS grade we initially specified to a standard general purpose ABS they source locally for other consumer products. I need to figure out if that switch is even feasible, what exact tradeoffs we’re facing between performance, durability, and cost, and how we can adjust to pass the client’s field validation without missing the 6-week sample delivery deadline we signed off 2 weeks ago.",
        "answerCount": 9,
        "upvoteCount": 11,
        "datePublished": "2026-09-18T20:46:07Z",
        "dateModified": "2026-09-18T21:07:08Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The cracking and warpage you are seeing right now are not random defects, they are direct results of mismatches between general purpose ABS material properties and the strict operating conditions power tool parts for building hardware face on job sites. Standard unfilled general purpose ABS has a heat deflection temperature (HDT) of only 75°C to 85°C, which is far lower than the 95°C to 105°C surface temperature common for drill handles and trigger locks after 15 minutes of continuous high-load operation. The 60°C chamber test you ran only accelerated the long term heat aging effect, which would show up as permanent deformation on job sites in summer months when tools are left in direct sunlight inside closed tool boxes. The impact strength of general purpose ABS also drops by 35% at temperatures below 0°C, which means parts could crack instantly if a worker drops a running drill on frozen concrete during winter construction work. The proposed material switch to the client’s local general purpose ABS cannot meet the baseline performance requirements for professional grade building hardware power tool parts, but there are viable middle ground solutions that hit both the cost target and durability demands. You can first narrow down material options to two validated grades: medium impact modified ABS with 10% glass fiber filler, or high heat ABS with no glass filler. Both grades sit at a 7% to 10% cost premium over general purpose ABS, which is far lower than the 15% cost cut the client is requesting, leaving enough room for cost optimization from other areas of the project. Start with adjusting nominal wall thickness across all 3 parts to a uniform 2.2mm, down from the current 2.8mm average, while adding 0.3mm rounded radii at all sharp corners that are currently acting as stress concentration points. This adjustment reduces raw material usage per part by nearly 22% directly, covering almost all of the remaining cost gap without compromising structural strength. For the existing warpage issue in your first prototype batch, the root cause is uneven internal residual stress left from insufficient mold cooling during the initial trial run. Set mold temperature to a stable 60°C instead of the 35°C you used for the first trial, and extend hold pressure duration by 8 seconds for all 3 cavities. This adjustment will eliminate 98% of the uneven shrinkage that causes warpage, no extra tooling modification is needed to implement this change. The test cycle for the updated samples can be compressed to 10 days maximum, which fits fully inside your remaining 6 week sample delivery window. To prevent similar conflicts from slowing down the project later, you can formalize a clear performance tradeoff reference sheet that lists exact test parameters, failure thresholds, and corresponding unit cost levels, and share it with the client’s engineering team before moving to mass production. Add three mandatory pre-delivery validation checks to your sample approval flow: 200 hours of continuous vibration testing, -10°C drop test from 1.8m height, and 100°C 24 hour heat aging test. This eliminates subjective performance disputes later, and sets a clear baseline that both teams agree on, avoiding last minute change requests that create unplanned cost overruns. All of these adjustments can be implemented without new tooling investment, so there is no risk of missing your scheduled OEM sample delivery date.",
            "upvoteCount": 11,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#acceptedAnswer",
            "datePublished": "2026-09-18T22:05:02Z",
            "author": {"@type": "Person","name": "Jason Zhou","url": "https://www.jaterson.com/team/jason.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "For this set of ABS power tool parts, selecting P20 hardened steel for cavity and core inserts instead of pre-hardened S50C steel will extend total mold life to 300,000 shots minimum, without adding more than 4% to total tooling cost. The gate locations for the current trigger lock part are positioned at the thin end of the lever, which creates uneven flow front and causes internal stress that leads to cracking during vibration testing. Shifting the gate to the thickest section of the lever eliminates 90% of that flow related stress. A routine 2000-shot mold maintenance cycle that includes cleaning of vent slots and light polishing of core surfaces will keep part dimensional consistency within ±0.05mm across the entire production run, which prevents fit issues with the corresponding drill body assembly for up to 5 years of regular production. No major tooling rework is required if you adjust these parameters during the next trial run.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#suggestedAnswer-2",
            "datePublished": "2026-09-18T21:50:42Z",
            "author": {"@type": "Person","name": "Linda Xu","url": "https://www.jaterson.com/team/linda.html"}          }
          ,          {
            "@type": "Answer",
            "text": "All three of your current part designs have 0.5 degrees of draft angle on vertical side walls, which is insufficient for ABS power tool parts that have textured surface finishes for non-slip grip. Increasing draft angle to 1.2 degrees will eliminate the risk of parts sticking to the core during ejection, which often creates invisible micro cracks that propagate during field use. The current depth stop adapter has two adjacent walls with 3.2mm and 1.1mm thickness respectively, the extreme difference creates uneven shrinkage that is the main source of the warpage you saw in the 72 hour heat test. Adding 0.8mm transitional wall sections between the two thickness zones smooths out shrinkage, no material removal or functional change is needed. You can also remove the 3 tiny undercut features on the side handle that add unnecessary side action tooling cost, and replace them with a simple snap fit design that meets the same assembly requirement.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#suggestedAnswer-3",
            "datePublished": "2026-09-18T21:41:32Z",
            "author": {"@type": "Person","name": "Eric Zhao","url": "https://www.jaterson.com/team/eric.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The first prototype run you completed used a 3 second cooling time that is too short for modified ABS grades, which locks in high residual stress inside the part. Expanding cooling time to 18 seconds will let the part shrink evenly inside the mold before ejection, greatly reducing the risk of post deformation after heat exposure. You can also set melt temperature between 210°C and 225°C instead of the 240°C you used initially, which reduces material degradation that causes brittleness at the molecular level. For the trigger lock part that had 3 cracked samples, you can widen the process window by adjusting injection speed to 45mm/s during the fill stage, instead of the 70mm/s high speed fill you used, which avoids shear burning at the sharp corner stress points. These process tweaks can cut scrap rate from the current 12% to below 1.5% during mass production.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#suggestedAnswer-4",
            "datePublished": "2026-09-18T21:38:36Z",
            "author": {"@type": "Person","name": "Olivia Chen","url": "https://www.jaterson.com/team/olivia.html"}          }
          ,          {
            "@type": "Answer",
            "text": "You can establish three layered inspection checkpoints specifically for this ABS power tool part line, to catch defects before they get to final assembly. For incoming raw material inspection, test each batch’s HDT and notched impact strength before unloading, reject any batches that deviate more than 5% from the agreed material specification. For in-process inspection, pull 5 samples every 2 hours from the production run to conduct quick dimensional check and manual squeeze test, to spot early signs of brittleness or uneven shrinkage. For final outgoing inspection, run 1% full sample batch vibration test for every 1000 pieces produced, to filter out any parts that have hidden micro cracks. Formalize a corrective action loop that requires root cause analysis within 24 hours if any defect rate exceeds 2%, which prevents quality drift across the full production run.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#suggestedAnswer-5",
            "datePublished": "2026-09-18T21:34:56Z",
            "author": {"@type": "Person","name": "Emily Chen","url": "https://www.jaterson.com/team/emily.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For any post-machining operations you need for these ABS parts, such as drilling pin holes on the trigger lock or cutting the snap fit groove on the side handle, use a custom soft jaw fixture machined from 6061 aluminum that matches the outer contour of the part. This distributes clamping force evenly across the full part surface, avoiding local deformation that creates hidden stress points around the machined holes. You can hold positional tolerance of the pin holes to ±0.03mm consistently with a 12000 RPM spindle speed and 0.1mm per feed rate, which ensures perfect alignment between the trigger lock and the drill switch mechanism. Using a 600 grit polishing step after machining will remove any sharp burrs on the machined edge, which is a common site for crack initiation when the part is exposed to continuous vibration during operation.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#suggestedAnswer-6",
            "datePublished": "2026-09-18T21:33:07Z",
            "author": {"@type": "Person","name": "David Zhang","url": "https://www.jaterson.com/team/david.html"}          }
          ,          {
            "@type": "Answer",
            "text": "These ABS parts are designed for professional power tool users, who typically apply 2 to 3 times higher operating force than regular consumer users, so the current 10 minute continuous run test parameter is not sufficient to replicate real world conditions. You can update the validation test cycle to 100 hours of continuous vibration at 15G acceleration, which simulates 2 years of regular job site use. The general purpose ABS the client requested will start showing surface micro cracks after 32 hours of this test, which would lead to 10% premature part failure within the first 6 months after retail launch. You can also add a simple overmolded TPE strip on the grip section of the side handle, which not only improves non-slip performance for end users but also absorbs partial vibration force, reducing the total load the ABS structure needs to carry by nearly 18%. This small design tweak extends total part service life greatly without adding more than 3% to unit cost.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#suggestedAnswer-7",
            "datePublished": "2026-09-18T21:29:45Z",
            "author": {"@type": "Person","name": "Michael Wu","url": "https://www.jaterson.com/team/michael.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The current tolerance stack up across all three mating parts will add up to 0.28mm, which creates either too tight fit that causes the trigger to stick, or too loose fit that produces excessive play after 500 actuation cycles. You can adjust the nominal dimension of the depth stop adapter’s mounting boss by +0.12mm, which brings total accumulated tolerance down to under 0.1mm, eliminating 99% of manual rework during the assembly process. Optimizing assembly sequence to first press the depth stop adapter into the drill housing, then attach the side handle, then install the trigger lock, will reduce assembly defect rate by 7% compared to the original sequence. Adding a 0.08mm chamfer on all mating part edges will make self alignment easier for automated assembly lines, which cuts total assembly cycle time per unit by nearly 2 seconds, bringing down per piece assembly cost even further at mass production volumes.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#suggestedAnswer-8",
            "datePublished": "2026-09-18T21:11:44Z",
            "author": {"@type": "Person","name": "Kevin Liu","url": "https://www.jaterson.com/team/kevin.html"}          }
          ,          {
            "@type": "Answer",
            "text": "You do not need to select the most expensive specialty ABS grade to meet all performance targets, the most cost effective option for this project is a medium impact modified ABS with 8% glass fiber content, which costs 9% more than general purpose ABS, and delivers HDT of 98°C and notched izod impact strength of 180 J/m. This grade balances rigidity and impact resistance perfectly, no brittle fracture will happen even at -15°C operating temperature. If the client’s local ABS supply chain can guarantee consistent material formulation, you can use 20% regrind material mixed into virgin resin without compromising core mechanical properties, which cuts raw material cost by another 7%, helping you hit the 15% total cost reduction target the client requested. Make sure you do not mix different ABS grades from different suppliers in the same batch, as inconsistent melt flow index will create large dimensional variation across the production run.",
            "upvoteCount": 0,
            "url": "https://www.jaterson.com/qa/best-abs-grade-power-tool-parts-building-hardware.html#suggestedAnswer-9",
            "datePublished": "2026-09-18T21:07:08Z",
            "author": {"@type": "Person","name": "Daniel Yang","url": "https://www.jaterson.com/team/daniel.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.jaterson.com/qa/"},{"@type": "ListItem", "position": 3, "name": "Hardware Manufacturing Q&A", "item": "https://www.jaterson.com/qa/hardware-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "What are the best material grades for ABS power tool parts for building hardware?"}
      ]
    }
]
```