---
title: "Plastic Mini Dustpan: Lightweight & Durable Cleaning Tool - JATERSON"
description: "The Plastic Mini Dustpan is a lightweight and durable cleaning tool, ideal for home, garden, and outdoor use. Designed for effortless waste collection with ergonomic handling."
url: "https://www.jaterson.com/gardening-tools-injection-molding/plastic-mini-dustpan-lightweight-cleaning-tool.html"
language: "en"
type: "Product"
category: "Gardening Tools"
datePublished: "2025-02-13"
dateModified: "2025-02-25"
brand: "JATERSON"
manufacturer: "JATERSON"
image: "https://static.jaterson.com/2025/02/25021059/1740449459-1739427608-Plastic-Mini-Dustpan.webp"
---

# Plastic Mini Dustpan: A Lightweight & Practical Cleaning Solution

## Product Overview

The **Plastic Mini Dustpan** is a **lightweight cleaning tool** designed for small-area waste collection. Manufactured using **precision injection molding**, it is perfect for **home desktops, garden nurseries, and orchards**. Its **compact size and ergonomic handle** make it easy to store in drawers or tool racks, enabling quick cleanup of **debris, leaves, and soil**. Combining **practicality and portability**, this dustpan is an **essential helper for household cleaning and outdoor gardening**.

## Key Advantages

![Plastic Mini Dustpan: A Lightweight & Practical Cleaning Solution](https://static.ok-tool.com/2025/02/25021114/1740449474-1739427611-Plastic-Mini-Dustpan-1.jpg)

**Lightweight & Durable** – Weighing only **261g**, it allows for **effortless single-handed operation**. Made from **high-strength plastic**, it is **impact-resistant, wear-resistant, and deformation-proof** for long-term use.

**Deep Cleaning Capacity** – A **25cm deep pan** with a **34cm wide mouth** efficiently collects waste, reducing the frequency of emptying. The **dark green finish** resists stains and remains highly visible.

**Seamless Injection-Molded Construction** – A **one-piece design** with **smooth, burr-free edges** ensures safety. The **3.5cm widened handle** offers an **anti-slip grip** for enhanced stability.

**Versatile Use** – Suitable for **indoor and outdoor** cleaning tasks, handling **paper scraps, soil, fallen leaves, and garden trimmings** with ease.

## Technical Specifications

| **Attribute** | **Description (Reference Value)** |
| --- | --- |
| **Material** | High-strength plastic |
| **Size** | 40cm (L) × 34cm (W) × 9cm (H) |
| **Pan Depth** | 25cm |
| **Handle Width** | 3.5cm |
| **Weight** | Approx. 261g |
| **Color** | Standard dark green (customizable) |
| **Manufacturing Process** | **[Precision injection molding](https://www.jaterson.com/knowledge/precision-injection-molding/)** |

## Applications

**Home Cleaning** – Quickly collects **snack crumbs, paper scraps, and pet hair** from tabletops.

**Garden & Orchard Maintenance** – Gathers **fallen leaves, pruned branches, and loose soil** efficiently.

**Greenhouse & Nursery Use** – Transfers **potting medium and cleans seedling trays**.

**Camping & Outdoor Activities** – Ideal for **collecting small waste after outdoor events**.

## Packaging & Customization

**Globally Popular** – Exported to **Africa, Europe, and Southeast Asia**, compliant with **RoHS environmental standards** for **cross-border wholesale**.

**Flexible Supply Options** – Available in **single or bulk packaging**, supporting **OEM neutral branding** with **no minimum order quantity**.

**Customizable Design** – Adjustable **dustpan size, handle curvature, and colors** (e.g., **military green, navy blue**) to match different market preferences.

*Product dimensions and weight are reference values based on manual measurements; final specifications depend on mass production. Custom mold development available upon request.*

## Related Resources

- [Gardening Tools](https://www.jaterson.com/gardening-tools-injection-molding/)

## Structured Data

```json
[
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
        {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Products", "item": "https://www.jaterson.com/products/"},{"@type": "ListItem", "position": 3, "name": "Gardening Tools", "item": "https://www.jaterson.com/gardening-tools-injection-molding/"}
        ,{"@type": "ListItem", "position": 4, "name": "Plastic Mini Dustpan: Lightweight &amp; Durable Cleaning Tool - JATERSON"}
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "Product",
  	
  	"url": "https://www.jaterson.com/gardening-tools-injection-molding/plastic-mini-dustpan-lightweight-cleaning-tool.html",
      "name": "Plastic Mini Dustpan: Lightweight &amp; Durable Cleaning Tool - JATERSON",
      "category": "Gardening Tools",
      "image": [
  		        "https://static.jaterson.com/2025/02/25021059/1740449459-1739427608-Plastic-Mini-Dustpan.webp"
  		],"description": "The Plastic Mini Dustpan is a lightweight and durable cleaning tool, ideal for home, garden, and outdoor use. Designed for effortless waste collection with ergonomic handling.",
      "brand": {
          "@type": "Brand",
          "name": "JATERSON"
      },
      "manufacturer":{ "@id":"https://www.jaterson.com/#organization" },
      
  }
]
```