---
title: "Garden Leaf Pickup Claw: Efficient Outdoor Cleanup Tool - JATERSON"
description: "The Garden Leaf Pickup Claw is a lightweight and durable tool for fast leaf collection. Perfect for parks, landscapes, and municipal cleaning, with an ergonomic design for efficiency."
url: "https://www.jaterson.com/gardening-tools-injection-molding/garden-leaf-pickup-claw.html"
language: "en"
type: "Product"
category: "Gardening Tools"
datePublished: "2025-02-13"
dateModified: "2025-02-25"
brand: "JATERSON"
manufacturer: "JATERSON"
image: "https://static.jaterson.com/2025/02/25045955/1740459595-1739429799-Garden-Leaf-Pickup-Claw-1.webp"
---

# Garden Leaf Pickup Claw: A Fast &amp; Efficient Outdoor Cleanup Tool

## Product Overview

The **Garden Leaf Pickup Claw** is a **lightweight and durable** tool designed for **efficient leaf collection**. Manufactured using **high-strength injection-molded plastic**, it features a **dual-claw design** that enables **one-handed operation** for quick and easy gathering of fallen leaves, twigs, and debris. Ideal for **parks, residential landscapes, and roadside maintenance**, its **natural green color blends seamlessly into outdoor environments**. Packaged in **transparent OPP bags**, it combines **functionality with convenience**, making it a **standard tool for municipal cleaning and landscape maintenance**.

## Key Advantages

![Garden Leaf Pickup Claw: A Fast & Efficient Outdoor Cleanup Tool](https://static.ok-tool.com/2025/02/25045955/1740459595-1739429799-Garden-Leaf-Pickup-Claw-1.jpg)

**Lightweight & Durable** – Weighs only **310g per pair (±10g tolerance)**, made from **impact-resistant plastic**, ensuring **flexibility and durability for all-weather outdoor operations**.

**Bionic Tooth Design** – **12 interlocking anti-slip teeth** increase **gripping surface area**, easily collecting pine needles, sycamore leaves, and other irregularly shaped debris with **minimal spillage**.

**Seamless Injection Molding** – **One-piece claw arms with rounded edges** ensure **a smooth, safe grip**. The **UV-resistant coating extends outdoor lifespan by 30%**, preventing sun damage.

**Optimized for Global Shipping** – **50 pairs per carton (16.4kg total weight)**, designed for **stable stacking in sea freight** and suitable for **storage in humid regions like Africa and Southeast Asia**.

## Technical Specifications

| **Attribute** | **Description (Reference Value)** |
| --- | --- |
| **Material** | Engineering-grade [Polypropylene (PP)](https://www.jaterson.com/knowledge/polypropylene-pp/) |
| **Single Pair Size** | 36cm (L) × 29cm (W) × 4cm (Thickness) |
| **Carton Dimensions** | 40cm × 47cm × 42cm (50 pairs per carton) |
| **Weight per Pair** | Approx. 310g (±10g manual measurement variance) |
| **Color** | Standard grass green (custom Pantone colors available) |
| **Application** | Landscape maintenance, municipal road cleaning, campus sanitation |

## Applications

**Peak Leaf-Fall Season** – Quickly clear fallen leaves from **ginkgo, maple, and other high-shedding trees**.

**Landscape Maintenance** – Easily pick up **hidden debris from under shrubs and bushes**.

**Public Area Cleaning** – More **efficient than traditional brooms**, collecting leaves from **stone crevices and tiled surfaces**.

**Emergency Cleanup** – Quickly **clear broken branches and scattered debris after storms and typhoons**.

## OEM & Private Label Services

**Fully Customizable** – Options to adjust **tooth density (6/18 teeth), claw arm curvature, and anti-slip handle texture**, with **laser-engraved branding**.

**Flexible Small-Batch Production** – **MOQ of 1 pair**, bulk production starts at **50 pairs**, with **3-day sample turnaround**.

**Certified for Global Markets** – Meets **EU REACH and US FDA food-grade contact standards**, ensuring **compliance with export regulations**.

**Upgraded Packaging Options** – Standard **moisture-proof OPP bags**, with optional **color box packaging or biodegradable materials** for enhanced retail presentation.

*All dimensions and weights are manually measured reference values. Actual specifications depend on mold testing in mass production. Support available for FOB/CIF shipping and cross-border logistics.*

## Related Resources

- [Gardening Tools](https://www.jaterson.com/gardening-tools-injection-molding/)

## Structured Data

```json
[
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
        {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Products", "item": "https://www.jaterson.com/products/"},{"@type": "ListItem", "position": 3, "name": "Gardening Tools", "item": "https://www.jaterson.com/gardening-tools-injection-molding/"}
        ,{"@type": "ListItem", "position": 4, "name": "Garden Leaf Pickup Claw: Efficient Outdoor Cleanup Tool - JATERSON"}
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "Product",
  	
  	"url": "https://www.jaterson.com/gardening-tools-injection-molding/garden-leaf-pickup-claw.html",
      "name": "Garden Leaf Pickup Claw: Efficient Outdoor Cleanup Tool - JATERSON",
      "category": "Gardening Tools",
      "image": [
  		        "https://static.jaterson.com/2025/02/25045955/1740459595-1739429799-Garden-Leaf-Pickup-Claw-1.webp"
  		],"description": "The Garden Leaf Pickup Claw is a lightweight and durable tool for fast leaf collection. Perfect for parks, landscapes, and municipal cleaning, with an ergonomic design for efficiency.",
      "brand": {
          "@type": "Brand",
          "name": "JATERSON"
      },
      "manufacturer":{ "@id":"https://www.jaterson.com/#organization" },
      
  }
]
```