---
title: "6-Cell Plastic Nursery Pot: Ideal for Seed Germination & Growth - JATERSON"
description: "The 6-Cell Plastic Nursery Pot is a durable and lightweight solution for seed germination and seedling cultivation. Perfect for home gardens, greenhouses, and commercial nurseries."
url: "https://www.jaterson.com/gardening-tools-injection-molding/6-cell-plastic-nursery-pot.html"
language: "en"
type: "Product"
category: "Gardening Tools"
datePublished: "2025-02-13"
dateModified: "2025-02-25"
brand: "JATERSON"
manufacturer: "JATERSON"
image: "https://static.jaterson.com/2025/02/25021249/1740449569-1739428779-6-Cell-Plastic-Nursery-Pot.webp"
---

# 6-Cell Plastic Nursery Pot: A Practical Solution for Seedlings

## Product Overview

The **6-Cell Plastic Nursery Pot** is a **gardening essential** designed for **seed germination and seedling cultivation**. Manufactured using #**injection molding**#, it is ideal for **succulents, flowers, vegetables, and other seedlings**. The **independent six-cell structure** allows for **separated planting**, preventing root entanglement, while the **bottom drainage holes** ensure proper **ventilation and water management**. It is a perfect solution for **home gardens, greenhouses, and commercial nurseries**.

## Key Advantages

![6-Cell Plastic Nursery Pot: A Practical Solution for Seedlings](https://static.ok-tool.com/2025/02/25021324/1740449604-1739428782-6-Cell-Plastic-Nursery-Pot-2.jpg)

**Lightweight & Durable** – Weighing only **18g per pot**, made from **high-strength plastic** that is **crush-resistant, reusable, and cost-effective for long-term planting**.

**Optimized Multi-Cell Design** – **Six individual compartments** designed to accommodate **small plant root systems**, making transplantation easier while **minimizing seedling damage**.

**Seamless Injection Molding** – **One-piece construction** with **smooth, burr-free edges and uniform thickness**, ensuring **strong weather resistance** for both **indoor and outdoor environments**.

**Cost-Effective & Highly Adaptable** – Available for orders starting at **10 pieces**, supporting **small-batch [OEM production](https://www.jaterson.com/custom-manufacturing/oem/)**, and catering to **cross-border wholesale and private label gardening brands**.

## Technical Specifications

| **Attribute** | **Description (Reference Value)** |
| --- | --- |
| **Material** | Eco-friendly plastic (RoHS compliant) |
| **Single Pot Size** | 17cm (L) × 12.6cm (W) × 6cm (H) |
| **Stacked 10-Pot Size** | 17cm (L) × 12.6cm (W) × 8.5cm (H) |
| **Weight** | Approx. 18g per pot (±5% manual measurement variance) |
| **Color** | Standard black (custom colors available) |
| **Application** | Vegetable gardens, home gardening, greenhouse seedling cultivation |

## Applications

**Home Gardening** – Ideal for **balcony-grown succulents, herbs, and houseplants**.

**Vegetable Cultivation** – Suitable for **tomatoes, peppers, and other vegetable seedlings**.

**Flower Propagation** – Perfect for **early-stage root development in small flowering plants**.

**Agricultural Seedling Growth** – Helps **transition seedlings for large-scale farming operations**.

## OEM & Private Label Services

**Customizable Design** – Adjustable **cell numbers (4-cell/8-cell), pot dimensions, colors (e.g., dark green, brown), and logo printing** options.

**Flexible Order Quantities** – Low **MOQ of 10 pieces**, with **no mold fee** for standard models. Sample confirmation available to ensure mass production consistency.

**Global Compatibility** – Designed for **vegetable gardens and nursery markets**, compliant with **export standards for Europe, Southeast Asia, and other international markets**.

**Packaging Options** – Available in **single-unit or 10-piece shrink-wrapped packs**, with optional **hanging cards or color box packaging** for enhanced retail display.

*Product dimensions and weight are reference values based on manual measurements. Final specifications are based on mold parameters for mass production. Custom nursery container development available upon request.*

## Related Resources

- [Gardening Tools](https://www.jaterson.com/gardening-tools-injection-molding/)

## Structured Data

```json
[
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
        {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.jaterson.com/"},{"@type": "ListItem", "position": 2, "name": "Products", "item": "https://www.jaterson.com/products/"},{"@type": "ListItem", "position": 3, "name": "Gardening Tools", "item": "https://www.jaterson.com/gardening-tools-injection-molding/"}
        ,{"@type": "ListItem", "position": 4, "name": "6-Cell Plastic Nursery Pot: Ideal for Seed Germination &amp; Growth - JATERSON"}
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "Product",
  	
  	"url": "https://www.jaterson.com/gardening-tools-injection-molding/6-cell-plastic-nursery-pot.html",
      "name": "6-Cell Plastic Nursery Pot: Ideal for Seed Germination &amp; Growth - JATERSON",
      "category": "Gardening Tools",
      "image": [
  		        "https://static.jaterson.com/2025/02/25021249/1740449569-1739428779-6-Cell-Plastic-Nursery-Pot.webp"
  		],"description": "The 6-Cell Plastic Nursery Pot is a durable and lightweight solution for seed germination and seedling cultivation. Perfect for home gardens, greenhouses, and commercial nurseries.",
      "brand": {
          "@type": "Brand",
          "name": "JATERSON"
      },
      "manufacturer":{ "@id":"https://www.jaterson.com/#organization" },
      
  }
]
```